Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
From US 17 to SR 11 and SR 11 to Cone Road FPID No
Titusville to Edgewater Bike Loop PD&E Study
State of Morrisville Mayor Mark Stohlman July 17, 2014.
City of Sunset Valley Drainage Master Plan Assessment Final Recommendation Report March 24, 2009.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
City of Palm Coast- Flagler County Transportation Impact Fees City Council-Flagler County Commission Workshop.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
ENGINEERING & CONSTRUCTION DIVISION GERALD N. BRINTON, P.E. COUNTY ENGINEER / DIRECTOR OF ENGINEERING & CONSTRUCTION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Parks and Recreation Division December 15, 2009 PARK LAND ACQUISITION.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
Community Development Department Construction Phase BULLDOG DRIVE.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Regional Trails Corridor Assessment. Project Goals »Complete the regional trails network in the TPO Planning Area and advance the Florida Greenways and.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Transportation Projects City Council Workshop May 14, 2013.
Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Program Manager Administrator
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
MED SR 18 Corridor Project MED PID October 13, 2015.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) OCTOBER 23, 2012 Craig Coffey, County Administrator 1.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
City of Ormond Beach Planning Board Workshop June 18, 2012 PMUD : Ormond Crossings Planned Mixed Use Development Rezoning.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014.
Regional Roads Committee
Project Status & Right-of-Way Acquisition
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Draft Transportation Element September 6, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
Citrus Park Drive Extension
Florida Transportation Commission FY 2009
State Road 72 Safety Improvements
Volusia TPO Board Meeting January 22, 2013
Lyle Parkway to SR 540 (Winter Lake Road)
Heart of Florida Loop East Section
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
Church Road Community Meeting
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011

PD&E Study Reevaluation Location Map Design FY 11/12 Design FY 13/14

Existing Typical Section Rural Typical Section 200 Feet of Existing Right-of-Way

Proposed Typical Section 4-Lane Rural Divided Arterial Minimum Design Speed = 65 mph Right-of-Way Acquisition –Interceptor Ditches: 0’-20’ additional right-of-way –Pond Sites Potential Trail

Volusia County Trail Master Plan VTPO Requested Evaluation 12-foot Wide, Paved, Multi-use Trail –South Side of SR 40 –Volusia County Standards –Trail Located At Right-of-Way Berm Between Ditches Wildlife Crossings – Adjacent to the Road with Barrier Separation Trailhead Locations Gaps to Existing/Funded Trails

Trail Location South Side of SR 40 –Advantages Reduced Right-of-Way Impacts and Costs Reduced Construction Costs –Disadvantages Requires Crossing SR 40 to Connect to Existing Trail in Ormond Beach. –Potential Crossing Point - Future Airport Boulevard Extension

Trail Costs Wetland Impacts – 6.42 Acres Conservation Easement Impacts – 0.87 Acres Trail Costs –Construction $5.75 M –Right-of-Way$2.50 M –Mitigation$0.85 M –Design and CEI$1.65 M –Total $10.8 Million Cost Estimates are for the Trail to be Completed as Part of the Widening Projects