Finished Goods Purchase Order Entry RLM System. Finished Goods Purchase Orders FGPOs are the orders Jordache places to the factories that produce the.

Slides:



Advertisements
Similar presentations
Page 1 Cost Entry for Owned (Related) Factories By MIS Department.
Advertisements

Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
New RF Gun Login By MIS Department. What is the New RF Gun Login? The RLM System has the ability to have multiple companies, each of which has its own.
CARTONIZE CUT & PRINT BOX END LABELS RLM System. Page 2 Glossary of Training Terms The following terms will be used throughout this training program:
Page 1 Inter-Company Cash Application By MIS Department.
Page 1 Pay Inter-Company Vouchers by Hand Check By MIS Department.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (In Transits) are posted to the system to apprise the.
Page 1 Accounts Payable Voucher Entry By MIS Department.
Work Orders Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
Online Ordering System
Page 1 Manual Finished Goods Receiving By MIS Department.
Online Clock In/Out Employee User Guide
Page 1 Reprint Invoice By MIS Department. Page 2 When to use Reprint Invoice The Reprint Invoice function can be used to re- create invoices that have.
How to use a scanner Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic.
Gateway Program Go to along the left side, in the third section, click on The Gateway.
Training Guide. The Punch Out Catalog System The Punch Out shopping catalog for West Press takes the user directly into the vendor’s website and online.
IMPROVED SYSTEM NEW LOOK
Page 1 EDI Drop Ship Packing By MIS Department. Page 2 EDI Drop Ship Flowchart Factory Produces Units from FGPO Scan cartons to (virtual) container Add.
1Allocating Expenses. Create Report Header Page To access this screen, click on ‘New Expense Report’ from your Expense Module Tab This page will come.
ShelterPoint™ Data-Entry Workflows. ShelterPoint v5.2.3.
Page 1 Returns Receivings By MIS Department. Page 2 The Returns Process When a store or customer wants to return goods, they are supposed to contact the.
Search Empower Engage Send Print Co-Brand With BusinessBuilder.
Page 1 Cost Approval RLM System. Page 2 Costing of Finished Goods Purchase Orders Finished Goods Purchase Orders (FGPOs) are the orders Jordache places.
Page 1 Packing Open Stock for UCC128 By MIS Department.
Go to the Roseville City School District Website and pull down the Employees menu. Then click Online Services. Scroll down until you see Global Scholar-
UPC CROSS-REFERENCE SETUP FOR FACTORIES RLM System.
Page 1 Customer UPC Cross-Reference RLM System. Page 2 Customer UPC Cross-Reference Customers (i.e., stores who purchase our goods) often have their own.
Open the Goodyear Homepage Click on Teacher Tools.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
1 OrderPro Point of Sale (POS) Training Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
Once you have located the ISBN you would like to purchase, click “Add to Cart”. You will get a pop-up window showing the item you’ve added. If you are.
Cost Entry by MG for Directions Studio Cypress Creek System.
Page 1 Daily Receiving Inquiry By MIS Department.
Shipment / Container Tracking Inquiry By MIS Department.
Page 1 Finished Goods Purchase Order Inquiry RLM System.
RLM System Actual Cut Entry. Page 2 Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
Page 1 Billing Drop Shipments RLM System. Page 2 Drop Ship Billing Drop Ship billing is very similar to Outside Contractor Billing, except that billing.
Page 1 Cash Application By MIS Department. Page 2 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will.
PRINT BOX END LABELS FOR ODDS (LEFTOVERS) RLM System.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (“In Transits”) are posted to the system to apprise the.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Page 1 Manual Finished Goods Receiving By MIS Department.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Outside Contractor Billing Ron Lynn Management System.
Cost Entry for Non-Owned Factories By MIS Department.
Cost Entry for Non-Owned Factories Cypress Creek System.
Create new project or open existing project (here, we will create a new project)
Page 1 UPC (Universal Product Code) Inquiry By MIS Department.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
Prepared by CMSD Office of the Chief Financial Officer - October, OnBase E-Procure - Purchase Order Entry, Update Unapproved Purchase Order and.
Page 1 Global Sourcing By MIS Department. Page 2 What is Global Sourcing? The Global Sourcing application allows you to see the production in units and.
Order Inquiry by Style RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using.
Page 1 Cash Application By MIS Department. Page 2 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will.
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
Order Inquiry RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using the Order.
Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Purchase Orders Notes:.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Domestic Cost Entry and Approval RLM System. Costing of Finished Goods Purchase Orders Domestic FGPOs are orders Directions placed directly to the factories.
Page 1 GAP Force Pick Ticket By MIS Department. Page 2 Forcing Pick Tickets The Gap process requires that pick tickets be created before the goods are.
Order Inquiry by Entry Date RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed.
Page 1 One-Line Costing By MIS Department. Page 2 One-line Cost Sheet for Style In the event that styles in stock are transferred from PPK to Open Stock.
Page 1 GAP Container Loading By MIS Department. Page 2 Gap Distribution Center Process The Factory does not ship the units to the Distribution Center.
I-Supplier Training Guide
Simulation for Local Coordinators
Fantastic Graphics Inc. 2017
How to Create and Start a Test Session
Creating a Requisition in Atrieve Web
Presentation transcript:

Finished Goods Purchase Order Entry RLM System

Finished Goods Purchase Orders FGPOs are the orders Jordache places to the factories that produce the garments FGPOs to all Factories are entered by Jordache NY NOTE: Some of the following slides will have different screen colors (browns and blues), but the screens you will see will all have the blue colors.

Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the screen into which you enter information –Value: The information (data) being entered in the field. Example: Division number, FGPO number –Icon: An image you may click to perform a function such as select, submit or exit –(Single-)Click: Also “Select.” Hitting the left mouse button once. This will activate an icon or select a row in a list of values –Double-click: Hitting the left mouse button twice o the same part of the screen. Used only to select and return a value from a list.

Using the RLM System These are the primary RLM icons you will use: – Search: Located next to entry fields. Clicking this icon brings up a pop-up window with a list of all possible values for the field (for example, the next to the Division field will show a list of all divisions) (Shift-F9 keys or F21 key) – Select: Located on the Search pop-up windows. You may click on a line and click Select to return its value to the main screen – OK (Submit): Located in the bottom right corner of each screen. Processes the information on screen and brings you to the next screen – Return (Back): Located at the top of each screen. Click this icon to go back one screen (F2 key) – Exit: Located at the top of each screen. Click this icon to return to the menu or close a pop-up (F3 key)

Enter your User ID and Password here Note: User ID and Password are assigned by MIS. The fields are NOT case-sensitive. Sign On

Click the check (or hit the Enter key) to proceed Welcome

Enter “01” in the Company field If you don’t enter a Company or enter the wrong number, you will receive this error: Click OK Select Application Enter the application number for the menu or click the correct button in the menu at left Enter the application number for the PO menu or click the correct button in the menu at left

Click “Entry functions” to enter a new PO FGPO Menu

Click “Enter/Maintain Finished Goods Purchase Orders” FGPO Entry Menu

Enter the Division Number here To Select a Division click this icon: Double-Click the correct division, enter the number or click the line and click Select Division

For a new PO enter the Factory number in the “Maker/Contractor” field Enter the “Plant/Warehouse” number here Create New FGPO

To Select a Factory click the icon Double-click a Factory to select it, or single- click and hit the button Select Factory

Search Factory (Contractor/Vendor) To search, start typing the factory name and hit enter to search the list You may also enter or click to search by Contractor Type… Or by Country

To Select a Plant click this icon: Double-click a Plant to select it, or single- click and hit the button Select Plant

Enter the User PO number (found in the PO Book) Select the type of PO: 1 st Quality (default selected), 2 nd Quality, 1 st Quality Leftovers (Odds) The PO Type is automatically filled in (and determines the type of Cost Sheet used) Enter FGPO Header: User PO #

Enter FGPO Header: User PO # (Div. 46) Note: For Ditto FGPOs produced at JRA Yucatan you must change the PO Type to a JRA Yucatan-specific one so the correct cost sheet will be used. Double-click a JRA Yucatan PO Type to select it, or single-click and hit the button Click into this field and hit F21 (Shift-F9) to bring up a list of Div. 46 PO types

The “Country of Origin” is automatically filled in (based on the Factory location) The “Maker #” is automatically filled in (based on the Factory selected) To change the Ship. Mode type in or click the Enter FGPO Header: Country, Ship. Mode

The Vendor # must be changed: Type in or press the F21 key (shift-F9) to select Edit Vendor Number Double-click a Vendor to select it, or single-click and hit the button

Vendor Numbers (MG Macao): For Owned Factories: JAR Morocco, AJICO, JAR Kenya, JRA Yucatan and all Non-Owned Factories (MG Macao for Ditto): For JRA Yucatan when Division is xx (MKLEN): For (JRA?) Madagascar (MG Overseas Ltd.): No longer used, may be on old FGPOs.

The Agent # is automatically filled in based on the Factory To change the Agent click the Double-click an Agent to select it, or single-click and hit the button Select Agent

Enter the Tagging information if necessary. To view the available options, click the icon Enter the ETD here (MMDDYY) Enter the Total Ordered (required) Enter FGPO Header: Tag, Total, ETD

Enter Packing Instructions in the “Pk. Instr.” field If necessary, enter Special Instructions in the “Sp. Instr.” fields (max. of 3). Enter FGPO Header: Instructions

If necessary, click here to enter “PO Additional Information” PO Additional Information

PO Additional Information (cont.) Enter “PO Additional Information” in these fields Click “Update” when finished

Click the check or hit Enter to continue Enter FGPO Header: Finish

Enter FGPO Details: Season, Style Enter the season and year in these two fields. Example: F 05 for Fall Select with the Select the Style using one of the icons

Select Style Double-click a Style to select it, or single-click and hit the button Notice that there are separate styles for Prepacks and for 00A (Open Stock)

Enter FGPO Details: Ins/PP The Style, FabWash and Color are put into the fields Select the Ins/PP using the icon

Select Ins/PP If you chose a Prepack style, select the Prepack code. There may be more than one. Note the number of units If you chose an Open Stock style, select the *N code.

Enter FGPO Details: Quantity Enter the quantity ordered for this style If you chose a Prepack style, the quantity Ordered must be a multiple of the number of units in the Prepack.

Enter FGPO Details: Prepack Style Click the check mark (or hit Enter) to continue

Enter FGPO Details: Open Stock Style If you entered an 00A style, enter the breakdown by size in these fields. Note: The total of the breakdowns must equal the number Ordered for this style – see slide 26

Review FGPO Details Click here to “Add a New Line” – add a style to the FGPO If finished, click the Balance icon (or hit F9)

You may also click this button or hit the F9 key to Balance When finished, click here to Balance the PO Balance

Out of Balance Click “Continue” to return to the PO details an edit the numbers. See slides xx-xx If the total entered by style does not equal the total on the PO header (see slide 19), you will see this screen

Balance (cont.) Click “Continue” to finish balancing the FGPO

What Happens Next The FGPO is added to the Owned Factory (or for non-Owned Factory FGPOs, to the Vendor: MG) for costing You will be able to make changes to the FGPO as long as costing has not been started

Edit FGPO To edit an FGPO, enter the “Division #” and the “User PO #” here. “(System) Purchase order #” is not needed Click the check or hit OK to continue

Click here to change the Plant (Warehouse) Double-click a Plant to select it, or single-click and hit the button Change Plant

Click here to Change Maker/Manufacturer Edit FGPO Header Note: To change the Maker once the cost has already been Approved you must first Reject the cost, enter a new FGPO, then cancel the original FGPO.

Select New Factory Current Factory is here To Select a new Factory click this icon: See slides for instructions for selecting a new Factory (Vendor/Contractor)

The new Factory appears here Click “Change” (F13) to accept the new Factory Accept New Factory

Edit Existing Style Line Right-click on a line to show Options… Or type in the LN# (line #) of the style and hit Enter… 0001 Return to slide 29 for Prepacks, slide 30 for Open Stock And left-click “Change Line”

Balance after Edit You may also click this button on any of the FGPO screens or hit the F9 key to Balance When finished editing you must Balance the PO

Balance after Edit: Mark as Changed Make sure “Changes were made” is checked Check here to print the FGPO You may change the Outq here Click “Continue” to finish balancing the FGPO

Balance after Edit: Reason Code If “Changes were made” you must enter a Reason. Use the icon to select from a list… …Or enter a description of the change here Click “Update” to finish

FGPO not Balanced If you have viewed or edited an FGPO without balancing it, you will see this warning when you next sign on to the system The system will bring you directly to the FGPO that needs balancing when you click the check or hit Enter