MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID 424530-1-52-01 Design Phase Public Information.

Slides:



Advertisements
Similar presentations
Project State Road 434 Outfall Ditch to the Little Wekiva River
Advertisements

City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
September 24, 2012 Genesee County Road Commission Dye & Court Roundabout Dye Road and Court Street Roundabout Construction John Daly, Manager-Director.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Service Provider Title VI Training Civil Rights Act of 1964 Presented By: Tennessee Department of Intellectual and Developmental Disabilities.
U.S. 33 Northern Connector Alternative
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
I-65 Added Travel Lanes Project in Tippecanoe County
From Island Estates Parkway to St. Johns County Line.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Road Wise Traffic Safety Passenger Safety Texas A&M AgriLife Extension Service in cooperation with Texas Department of Transportation Educational programs.
Mark Wandall Traffic Safety Act Traffic Infraction Detector Red-Light-Running-Camera Mark Wilson, P.E. State Traffic Operations Engineer.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
PUBLIC HEARING Draft Amendments FY 2011/12 – 2015/16 Transportation Improvement Program (TIP)
CIVIL RIGHTS FOR SCHOOL NUTRITION PROGRAMS Presented to School Nutrition Managers and Employees North Carolina Department of Public Instruction Safe and.
STA Safety Project PID #76439 December 12, 2006.
Uniform Complaint Procedure Memorandum # MEM-560 October 10, 2003 By: Jaime Morales.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
HWY 192 – Traffic Crash Study Common Goal – To improve the quality of life in the City of Kissimmee by reducing the number and severity of Traffic crashes.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Road Wise Roadway Markings and Traffic Signals Passenger Safety Texas A&M AgriLife Extension Service in cooperation with Texas Department of Transportation.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
Road Wise Passenger Safety Texas AgriLife Extension Service in cooperation with Texas Department of Transportation Traffic Safety Educational programs.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
SEMINOLE COUNTY Financial Project IDs: & Public Meeting December 6, 2011 Presented By: Stephanie Ghezzi, PE.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
Visit Our Website at: Click to edit Master title style.
S.R. 520 (West Merritt Island Causeway) SR 520 (West Merritt Island Causeway) From West of Myrtice Avenue to S.R. 3 Courtenay Parkway FPID
WELCOME! Please sign-in at Front Desk and pick up a Project Brochure and Speaker Request Card Feel free to review project displays and discuss project.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Begin Project End Project Welcome to the SR 530/US 192 Highway Improvement Project Informational Meeting Thursday, February 8, 2007.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
US1 AT CANAL STREET INTERSECTION DESIGN DEVELOPMENT
Florida Department of Transportation
CR184 (Quintette Road) Bridge #480045
S.R. 30 (U.S. 98) Tyndall Parkway
State Road 72 Safety Improvements
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Polk Transportation Planning Organization
Presentation transcript:

MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information Meeting September 14, 2010

MANATEE COUNTY TRAFFIC SIGNAL RETIMING One-on-One Questions and Answers Exhibit Review Slide Show Presentation Comment Cards

MANATEE COUNTY TRAFFIC SIGNAL RETIMING This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Wilson, 719 South Woodland Boulevard, Deland, Florida or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.

MANATEE COUNTY TRAFFIC SIGNAL RETIMING

Construct a 15.5 Foot Raised Grassed and Landscaped Median Full Median Openings at Signalized Intersections Directional Median Openings Throughout the Project An Additional Southbound Left Turn Lane at Oak Ridge Road Signing, Pavement Marking, and Traffic Signal Improvements Repave the Entire Roadway to Harmonize New Curbed Medians and Pavement Markings

MANATEE COUNTY TRAFFIC SIGNAL RETIMING

US 441 Currently Designated an Access Class 6 Corridor Per Chapter of the Florida Administrative Code, Access Class 5 requirements: 1/4 Mile (1320’) Full Median Opening Spacing 1/8 Mile (660’) Directional Median Opening Spacing Increased Spacing of Median Openings Allows Construction of Appropriate Length Left Turn Lanes (285’ Recommended) Median Openings Should Not be Present Within Influence Areas near Signals = Storage + Deceleration + Reaction Areas (Violates Driver Expectancy)

MANATEE COUNTY TRAFFIC SIGNAL RETIMING High Crash Location Recommendations and Justification Documented in a 2008 Access Management Study Conducted by FDOT Study Considered Reported Crashes Between 2004 and 2007 (197) and Anticipated Crash Reductions Safety Impacts to Project Corridor (per FDOT Study): Crash Type Anticipated Reduction Reported(%) Angle7447 (64%) Left Turn5323 (43%) Sideswipe1616 (100%) Head-On42 (50%) TOTAL CRASH REDUCTION 88 (60%)

MANATEE COUNTY TRAFFIC SIGNAL RETIMING

Reduced Crashes Improved Traffic Flow Aesthetic Improvements Benefit (Reduction in Crashes) to Cost (Improvements) Ratio = 8.9

MANATEE COUNTY TRAFFIC SIGNAL RETIMING Design Complete Summer 2011 Letting Contract Fall 2011 Construction in Late Fall 2011 Estimated Cost $2.7 Million No Right-of-Way Required

MANATEE COUNTY TRAFFIC SIGNAL RETIMING US 441 Median Construction From Landstreet Road to Oak Ridge Road. In design by HNTB. Design complete Spring 2012, Construction Fall US 441 Concrete Pavement Rehabilitation from 34 th Street to SR 50. Design start Spring 2011, Design complete Spring 2012, Construction Fall 2012 Gene Varano will also manage these projects for the DOT Project Information will also be available at

MANATEE COUNTY TRAFFIC SIGNAL RETIMING Turn in tonight or mail in by September 21st. The mailing address is on the form.