ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI +3171565 3345.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Configuration Management
Project Scope Management
Texas Department of Information Resources Presents
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
22000 Food Safety Management Systems
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
First Practice - Information Security Management System Implementation and ISO Certification.
Future Defence Aviation Safety Regulation Module 3 EMAR Part M – Continuing Airworthiness Requirements May 2015.
Hazard Analysis and Critical Control Points
SQA Architecture Software Quality.
FPSC Safety, LLC ISO AUDIT.
Phase II Training Briefed By [CA insert name] For Quality Assurance Personnel.
Development plan and quality plan for your Project
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Software Engineering Institute Capability Maturity Model (CMM)
Release & Deployment ITIL Version 3
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
SQA Architecture Software Quality By: MSMZ.
PMP® Exam Preparation Course
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Basics of OHSAS Occupational Health & Safety Management System
Implementing ISO 9001 Our project plan Copyright ©2008 The 9000 Store.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
CMM Level 2: Repeatable Copyright, 2000 © Jerzy R. Nawrocki Quality Management.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Project management Topic 1 Project management principles.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Project management Topic 3 Quality.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Project Management Basics
3-5 March 2004 ESA ODFCB, 3-5 March 2004 ESA Columbus Ground ODF Validation ESA ODFCB, 3-5 March 2004 Simon Challis, MSM-EO.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Project Management Process
Project Management Processes for a Project
K. Mercier, Shanghai meeting, 19th-22 May 2014 CNES, 5 th June 2014 Karine MERCIER EUSO Balloon Key Point Flight Acceptance Organisation.
Software Development Status Update Advanced Weather Interactive Processing System (AWIPS) Program December 9, 2015 Edward Mandel CP/Software/Development.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision CERTIFICATION PROCESS  Peter Stastny,
ITIL Project Change Management Workshop 7 February 2007
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Software Configuration Management
Project Management Managing Project Execution
Project Management Lifecycle Phases
CIS12-3 IT Project Management
AS Risk Mitigation Plan
Project Integration Management
12 Safe Maintenance Rules
Project Integration Management
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI

ESA ODFCB # 4 Peter Granseuer2 ESA ODFCB Charter Required update: ….ESA MSM Operations Control Board (OCB)

ESA ODFCB # 4 Peter Granseuer3 ESA ODFCB Charter ESA ODFCB members common responsibilities The ESA ODFCB members define their role and responsibilities as a team within the ESA ODFCB. The ESA ODFCB is chartered by the ISS Program. The work envelope is the ESA ODFCB charter. The authorised tools are the Multilateral ODF MP, STD and Op Nom. Definition of scope, content, organisational responsibilities for each ODF Product Implementation of the Multilateral Documents (STD, Op Nom, MP), certification requirements for the development, management and production of the ESA ODF.

ESA ODFCB # 4 Peter Granseuer4 ESA ODFCB Charter We (the ESA ODFCB) establish: ESA ODF procedures configuration management process. Development Schedule. Process for the review and approval of the ESA ODF. A forum for evaluation and disposition of ESA ODF procedures and process changes.

ESA ODFCB # 4 Peter Granseuer5 ESA ODFCB Charter We have the task to: Provide a forum for acceptance of ESA ODF procedures. Provide a forum for evaluation and disposition of ESA ODF procedure changes. Certify the ESA ODF for use and report status to Multilateral ODFCB. Review procedure validation records for ESA ODF. Ensure that the technical content of the ESA ODF is correct and in compliance with safety regulations. Define ESA ODF Milestones, publication template, and provide schedule status to the Multilateral ODFCB. Ensure program-wide visibility and access to the ESA ODF products. Ensure delivery of the ESA ODF to support Operations (and Training).

ESA ODFCB # 4 Peter Granseuer6 ESA ODFCB Charter