Next Steps, Priorities, Strategy for Spares Ray Veness.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
SPS New Wire Scanner Mechanics Review
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
TS, Length of YETS EYETS LIU & CONS Project
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
BI Activities for LS2 Ray Veness for BE-BI.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
Spare Parts strategy, methodology and work plan Introduction
News and hot topics Impedance meeting 14/04/2014.
TBTS Test Program & Schedule G. Riddone
Introdcution to Workpackage/Activity Reflection D. Schulte.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
News and Introduction from CERN June 15th, 2005
LIU Wire Scanner Project
Update on the Critical Path of the PS Booster Schedule for the EYETS
BE-BI Activities and Status: LHC and Injectors
Brief Status SPS Prototype PSB Prototype Installed in LS1
Wire Scanner / A.Demougeot
LIU Wire Scanner Milestones June 2017
AD consolidation activities in LS2
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Upgrade Strategy for the Experimental Vacuum Systems
YETS PS + PS SWY + TT2 Facility Coordinator:
LIU Wire Scanner Series Costs
Update on the PSB Transfer Lines
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

Next Steps, Priorities, Strategy for Spares Ray Veness

Contents 2 Introduction Status and next steps – Identify installed instruments and their spares – Logistics – Consolidation Consolidation budget and Priorities – Ongoing procurement – Risk score ‘Top 5’ Summary and Conclusions

Introduction 3 BI has around 2200 instruments on the beamlines of the LHC and injector chain There are a number of issues that impact on their availability for operations: – lack of documentation, – obsolescence, – changing CERN environment and use (eg, vacuum, LHC wire scanner use) – Average time in storage is ~19 years These can all be resolved, but we are limited by: – Budget, typically from the CERN consolidation project – People with the skills and availability to commit to this project

Identify Installed Instruments and their Spares 4 Inventory documents in EDMS – PS injector chain – SPS injector chain – LHC All non-LHC lines Identification of instruments and their spare parts – Find or produce drawings for every instrument A huge task – will need prioritisation – Transfer non-BI instruments to their owners – MTF label on all instruments in the machine – Identify spares for their instruments STARTED TBD STARTED

Logistics 5 Refurbish spares storage areas – B.867 radioactive transit storage – B.865 non-radioactive components storage – B.955,954 long-term radioactive storage: objective and status – B.879 long-term instrument storage: objective and status Stock control of parts – VSC validation of all instruments in long-term storage – Stock control system (in/out) TBD STARTED

Consolidation 6 Prioritise what to buy – Complete the risk analysis of LHC-chain instruments Missing impact data for the LHC – Agree priority list based on this analysis – Agree with VSC and other stakeholders who keeps what Procurement process – Request budgets from consolidation – Procure and store spares TODAY! TBD STARTED NEARLY THERE

Consolidation Budget and Plans 7 Initial requests from consolidation budget for ‘Critical Mechanical Spares’ for PS and SPS have been made and approved for the period The following was already procured in 2014: – PSB BWS spare tank (corrosion issue) – PSB BWS replacement chamber (machine continuity) – PS FBCT spare ceramic chamber – Renovation of logistics and storage areas in B.865 The following is currently scheduled for : – PSB 2x spare wire scanner instrument assemblies (active spares to minimise intervention times) – BTP line: BTV10 (replacement of unmaintainable instrument) – PS SEM grids for PR.MSG48, PR.MSG52, PR.MSG54 (leaks in LS1 – unmaintainable) – SPS SEM SMG52 – SPS spare wire scanners, rotary and linear, numbers TBD (active spares to minimise intervention times) – Sorting and re-validation of spares in radioactive storage Further requests will be made for consolidation budgets in the future, limited as much by available manpower in BI as budget Following recent LHC BWS issues, a consolidation budget will be requested for the LHC

Risk Point ‘Top 5’ for SPS, PS and PSB 8 BWS(BWSA)beam wire scanner, rotative, longinstalled2244 BWS(BWSB)beam wire scanner, rotative, shortinstalled1244 BWS(BWSD)beam wire scanner, linear, second generationinstalled2256 BSGBeam SEM grid horzontal, linearinstalled2108 BBSBeam beam monitorsinstalled1474 BWSBeam wire scanner - horizontalinstalled5305 BSFBeam SEM filinstalled1220 BTVBeam TV observation monitorsinstalled590 BCTBeam current transformersinstalled590 BSGBeam SEM gridinstalled356 BWSBeam wire scannerinstalled8164 BTVBeam TV observation monitorsinstalled340 BQKtune,chromaticity and coupling measurmentsinstalled420 BPMBeam position Monitorsinstalled688 to 42 BCWBeam wall current monitorintalled410 InstrumentDescriptionstatusquantityRisk points SPS PS PSB

Summary and Conclusions 9 We now have a good picture of the instruments installed in the injector chain – But we are missing many drawings, knowledge of spares and implementation of the logistics – This represents many man/years of work – The non-LHC chain is a significant new project, not currently resourced We have a budget line and have started with the highest priorities from the risk list – Further input from OP and BI experts welcome to optimise this list – We will continue on this path to the limits of our resources for the coming period – … but this means that new spares or drawings will not be produced for instruments with a medium/low risk point score for some years

10 Backup material

Risk Matrix 10/06/2015 Nikoloz SHARMAZANASHVILI 11 Impact on machine performance Instrument Failure Risk 1- Low importance - instrument failure has no significant impact on machine 2 – Setup –3 – Redundant – some redundancy or performance loss below 1% 4 – Nominal operation of Machine - Loss in performance 50%<X<1%) 5 – Critical for operation – Machine interlock or loss of performance >50% High ( ) BWS(BWSD) BWS(BWSB) Medium ( ) BWS(BWRE) BTVBSG Low (0 -20) BGI BBCBCT,BPM Strategy according to the instrument importance in the machine Replacement vacuum chamber available Sub components/parts availableReserve instrument on shelf