B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.

Similar presentations


Presentation on theme: "B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1."— Presentation transcript:

1 B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1

2 BI equipment status.  Sources of information  Machines inspected  Component statistics  To be inspected  Stored reserves (B879, 954, 955)  Conclusion, global status. 27/05/2014 Javier SIMÓN 2

3 Introduction 27/05/2014 Javier SIMÓN 3

4 Introduction 19542014 27/05/2014 Javier SIMÓN 4

5 Sources of information 27/05/2014 Javier SIMÓN 5  Layout DB  Layout drawings  CDD  Websites: OP, Optics, BI experts.  DFS - Old drawings.  Visual inspection.

6 Inspected until now. 27/05/2014 Javier SIMÓN 6

7 Lines in the Layout DB 27/05/2014 Javier SIMÓN 7

8 PS Ring 27/05/2014 Javier SIMÓN 8

9 PS Booster 27/05/2014 Javier SIMÓN 9

10 Component statistics 27/05/2014 Javier SIMÓN 10  Instrumentation and types.  Layout DB discrepancies.  Amount of instrumentation in lines not yet including in the layout.  Total unregistered equipment.  Drawing status.

11 Component statistics 27/05/2014 Javier SIMÓN 11  Data registered in the layout.  LHC: just the ring.  SPS: ring TI2 TI8 TT10.  PX: LEIR, proton lines up to FT16.

12 Component statistics PS complex 27/05/2014 Javier SIMÓN 12

13 Component statistics 27/05/2014 Javier SIMÓN 13  Disconnected instrumentation.  Inside those 478, everything is working?

14 Component statistics 27/05/2014 Javier SIMÓN 14  Disconnected instrumentation.

15 Component statistics 27/05/2014 Javier SIMÓN 15  Equipment types  Drawing Status.

16 Component statistics 27/05/2014 Javier SIMÓN 16

17 Component statistics 27/05/2014 Javier SIMÓN 17  PX drawings in numbers.

18 To be inspected  Before LS1 end.  SPS  LHC  To be scheduled.  AD, Isolde, target areas. 27/05/2014 Javier SIMÓN 18

19 Stored reserves 27/05/2014 Javier SIMÓN 19

20 Reserves (B879, 954, 955) 27/05/2014 Javier SIMÓN 20

21 Global status. In one word, heterogeneous.  The documentation is stored in many formats, places and with different naming conventions.  Amount of information: From correct and accurate, to no information, or “excessive” duplicated…  Descriptions need to be improved 27/05/2014 Javier SIMÓN 21

22 27/05/2014 22  Thanks for your attention.  Question time. Javier SIMÓN Hope to se you in BOSS 2.0

23 Global status.  Examples.  2 names same equipment.  1 name different equipment's 27/05/2014 Javier SIMÓN 23

24 2 names same equipment. PX-UDCSPS-BPCL 27/05/2014 Javier SIMÓN 24

25 2 names same equipment. PX-UDCSPS-BPCL 27/05/2014 Javier SIMÓN 25

26 2 names same equipment. 27/05/2014 Javier SIMÓN 26

27 2 names same equipment. 27/05/2014 Javier SIMÓN 27

28 2 names same equipment. 27/05/2014 Javier SIMÓN 28

29 2 names same equipment. SPS8051001844SPSBPCLM0002 27/05/2014 Javier SIMÓN 29

30 Global status.  Examples.  Intro.  2 names same equipment.  1 name different equipment's. 27/05/2014 Javier SIMÓN 30

31 1 name different equipment's. BTV 27/05/2014 Javier SIMÓN 31

32 1 name different equipment's. BTV 27/05/2014 Javier SIMÓN 32

33 1 name different equipment's. BIMTVBTVMR 27/05/2014 Javier SIMÓN 33

34 Generating the list. Layout label Equipment code label 27/05/2014 Javier SIMÓN 34

35 Equipment code label 27/05/2014 Javier SIMÓN 35  Video.

36 Equipment code label 27/05/2014 Javier SIMÓN 36

37 Descriptions need to be improved. 27/05/2014 Javier SIMÓN 37