BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI 28.08.2014.

Similar presentations


Presentation on theme: "BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI 28.08.2014."— Presentation transcript:

1 BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI 28.08.2014

2 Content test bench and acquisition system, Carlos Pereira presentation on possible break designs, Colin Grosjean consideration on the schedule, Bernd status of mechanical equipment, William 28.08.2014 BWSRE, B.Dehning 2

3 General Planning for the replacement of scanners in PSB, PS; SPS 28.08.2014 BWSRE, B.Dehning 3

4 Planning considerations Equipment BWSRE proto type 1 Consisting of vacuum tank and drum Vacuum installed in the SPS 51719 Drum to be installed in the SPS in January 2015 Missing designs RF shielding Brake (talk today by Colin Grosjean) Detailed planning needed Priority 1 BWSRE proto type 2 Consisting of vacuum tank and drum To be located in the LAB for Status, William Priority 3 Motor test set up Consisting of motor, shaft, fork To be installed in LAB, Priority 2 Pre- series (1 or 2 units) Changes to be included after redesign of existing prototype design Optimisation of inertia, fork, handling options, wire exchange procedure, motor options, brake options, thermal optimisation, RF optimisations,... Review of production cost and optimisation Priority 4 28.08.2014 BWSRE, B.Dehning 4

5 RF measurements on prototype 28/08 MORNING: Joseph and myself have finished to prepare the setup to start the measurements. We can now connect the hybrid to the carbon wire 28/08 @ 14h00: Measurements (Christine, Nicolo, Joseph, Emiliano) 29/08 MORNING: Measurements (Christine, Nicolo, Joseph, Emiliano) 01/09: “Fritz tungsten wire” installation (Emiliano, BE- BI-ML) 02/09: Measurements (Christine, Nicolo, Joseph, Emiliano) 03/09 MORNING: Measurements (Christine, Nicolo, Joseph, Emiliano) 03/09 AFTERNOON: Short meeting in order to define the best location where we could put ferrite (ALL) 04/09 : Removing of tungsten wire + ferrite installation (Emiliano, BE-BI-ML) 05/09: Measurements (Christine, Nicolo, Joseph, Emiliano) 08/09: Meeting to discuss the results and to decide any further measurements (ALL) 28.08.2014 BWSRE, B.Dehning 5