Presentation is loading. Please wait.

Presentation is loading. Please wait.

TBTS Test Program & Schedule G. Riddone 05.02.2008.

Similar presentations


Presentation on theme: "TBTS Test Program & Schedule G. Riddone 05.02.2008."— Presentation transcript:

1 TBTS Test Program & Schedule G. Riddone 05.02.2008

2 G. Riddone, 05.02.20082 Content Two-beam test phases Structures tests –Layout –Status of the procurement Module tests Schedule Conclusions

3 G. Riddone, 05.02.20083 CLEX layout TL2 TBL – decelerator reserved space two-beam exp. area CALIFES probe-beam linac Space reserved for ITB – Instrumentation Test Beam line

4 G. Riddone, 05.02.20084 Two-beam test phases Structure tests –Phase 1: test with PETS only  Power generation –Phase 2: test with PETS and accelerating structures  Two beam operation CLIC module –Phase 1: 8 accelerating structures with wakefield monitors –Phase 2: 6 accelerating structures and 1 quadrupole

5 G. Riddone, 05.02.20085 Structure test – Phase 1

6 G. Riddone, 05.02.20086 Structure test – Phase 1 Layout for first PETS which will be done with PETS with no damping material. Connection to cooling circuit and vacuum studied 4 holes at 45 degrees to allow for the implementation of the on-off mechanism Same tank for recirculation and PETS on-off

7 G. Riddone, 05.02.20087 Structure test – Phase 1 TL2 TBL PETS assembly ready to be inserted in the tank PETS in the tank with all infrastructure PETS on tank internal supports

8 G. Riddone, 05.02.20088 Tank for PETS and AS Mechanical calculations: EDMS#860573-861912 Technical specification: EDMS# 882216 Drawings for tank, internal components and flanges all finalized: available in CDD  CLIAVACU Handling system studied Alignment/positioning strategy agreed with TS/SU  +/- 150 m @ 1 Tanks under manufacturing in Pakistan (two units allowing for fast replacement): –1 unit: March 08 –2 unit: June 2008 Mechanical calculations: under way Tanks under manufacturing in Pakistan: –1 unit: Aug 2008 PETS AS

9 G. Riddone, 05.02.20089 PETS Assembly procedure studied in detailed: horizontal assembly method on dedicated assembly test Status of the procurement –Test sample: successfully manufactured –Couplers: under production  two firms selected to minimize risk of failure  expected at CERN in February 08 (first set from UNITEK already finished) –PETS bars: under production  also in this case two firms selected  expected at CERN in May 08 12 GHz, octant sample, length = 0.2 m, IMP First prototype rod bar finished  shipped on 11.02

10 G. Riddone, 05.02.200810 RF components Prototype x-band directional coupler received in Dec 2007

11 G. Riddone, 05.02.200811 Structure test – Phase 2 Accelerating structure PETS

12 G. Riddone, 05.02.200812 CLIC module Module with only acc. structures Module with main beam quadrupole and acc. structures

13 G. Riddone, 05.02.200813 CLIC module in CTF3

14 G. Riddone, 05.02.200814 Test program

15 G. Riddone, 05.02.200815 Conclusions Layout for phase 1 studied RF components ordered and so far procurement under schedule PETS tanks being manufactured in Pakistan: first unit completed in March 08 PETS couplers end bars ordered (two firms selected) Installation for phase 1 from May-June 2008


Download ppt "TBTS Test Program & Schedule G. Riddone 05.02.2008."

Similar presentations


Ads by Google