09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Status of the ATLAS MM project
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
Walls crates cables gas chambers electronics CERN adb.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
T.Schneider/LHCb Muon EDR
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
G. Carboni for the Muon Group
MicroMegas Mechanical Meeting --- Cern April 2014
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status and plans –Wiring machine –Glueing station –Wire pitch measurement –Wire tension measurement –Soldering station Production areas at CERN and PNPI are in a well advanced state

09/07/20022Muon Meeting M3R1 chamber Status: Design finished (Thomas Schneider) Material preparation (PCBs) ongoing Construction planned for August Testing begin September (?) or October ->Unfortunately chamber is not really a module 0 due to pending problems, in particular on chamber closing. ->As we want to be able to reopen, there is no simple alternative to the O-ring, due to many connectors and the small gaps (otherwise we might have switched already to an alterntive solution... ) -> Chamber will be still made with honeycomb panels (of 10mm total thickness), due to alignment issues to be sorted out, a tight schedule and difficulties to get foam panels done in Italy in August. ->We are considering to put the loading resistors into the gas gap (suggestion of Seva).

09/07/20023Muon Meeting M3R1 chamber

09/07/20024Muon Meeting M3R1 chamber

09/07/20025Muon Meeting M3 R2 and R4 chambers Status M3 R2: Design of M3R2 chamber planned for August Material preparation and construction in September Test in October Status M3 R4 (tbc by Alexei): Design done by A.Saputi / B.Botchine Material preparation done by LNF group Construction planned at CERN in September (Tooling for PNPI -in preparation at CERN- should be used) Test in October ->Schedule for both chambers is tough, we have to push

09/07/20026Muon Meeting Status of Tooling Preparation Wiring machine: Wiring machine for PNPI under construction at CERN (Raphael+PNPI technicians), following closely the design of the CERN wiring machine.

09/07/20027Muon Meeting Wiring Machine (ctd) Modifications: Have both belts on the same side (simpler transmission) Introduce electromagnetic clutch to facilitate start of the wiring process To be decided still: Implement tension measurement? Torque motor has still to be ordered -> Be ready end of August

09/07/20028Muon Meeting Glueing Tables Status: First glueing table has been finalized Need to decide on exact positions of spacers for glueing frames of Module 0

09/07/20029Muon Meeting

09/07/200210Muon Meeting Wire pitch measurement Status: Hardware for first station ready (Michał, Raphael) Software (LabView) well advanced, should be ready this week (Rebeca (SS)).

09/07/200211Muon Meeting Wire tension measurement Acknowledgement: Visit of A. Nedosekin in May was very useful to understand hardware and software of the KLOE/ATLAS WTM-system ! Status: 16-channel system could be purchased via LNF, but contains obsolete components (long delivery time) and it is rather expensive (~10kCHF). We investigated about adaptation of the system to up-to-date hardware (NI-DAQ 6602). ->First tests show that it is feasible (Michał and Anatoli) DAQ-card TTL-disc.LC-generatorHV-modulator HV-PSWire Chamber

09/07/200212Muon Meeting Wire tension measurement Plan: Use 2 NI-DAQ 6602 cards (8 channels each). –1 channel will be pulse generator (to scan frequencies around resonance) –1 channel will be used for gate generation (to define measurement cycle) ->14 channels left for measurement Each DAQ-card will have adapter card with TTL discriminators and switch A mother board with HV-modulator and LC-Generators (from LNF) will be prepared ->Prototypes and schematics done by Anatoli, layout will be done this week by Giacomo Chiodi Use external HV power supply (400 V) -> Software adaptation done by Michał and Rebeca ->6 (14) channel system is hopefully functional by mid August

09/07/200213Muon Meeting Soldering Station Plan: Follow as closely as possible LNF station, and adapt it to the multipurpose scanning table 2 heads are planned for PNPI table, 1 for CERN table (small chambers) ->Setting up planned for September/October