G.Barber Mice Tracker Mechanical Ral June 2007 1 Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.

Similar presentations


Presentation on theme: "G.Barber Mice Tracker Mechanical Ral June 2007 1 Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to."— Presentation transcript:

1 G.Barber Mice Tracker Mechanical Ral June 2007 1 Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to be designed

2 G.Barber Mice Tracker Mechanical Ral June 2007 2 Carbon Fibre Stations We have all the carbon fibre stations required for two complete trackers fabricated thanks to Peter Cooke at Liverpool. They have been machined at the Ral workshop and are being ‘clad’ with fibres at Imperial.

3 G.Barber Mice Tracker Mechanical Ral June 2007 3 Space Frame The components that are used to construct the space frame are now at Imperial. We need to machine the feet from the plates that Liverpool have supplied. New Foot Design Gluing Fillet Design

4 G.Barber Mice Tracker Mechanical Ral June 2007 4 Space Frame Tooling The jigs that align the space frames have been modified/re-designed. This will not only accommodate the new foot design but will also allow us to match the new station to station pitch. This work has been carried out by Peter Ford at RAL and he is now checking that the jig falls into the required tolerances.

5 G.Barber Mice Tracker Mechanical Ral June 2007 5 Station Layout/Pitch The final pitch has still to be decided but the baseline is 20cm, 25cm, 30cm and 35cm

6 G.Barber Mice Tracker Mechanical Ral June 2007 6 Connectors All of the fibre connectors are now in Japan and have either been integrated into waveguides or are waiting to be.

7 G.Barber Mice Tracker Mechanical Ral June 2007 7 The Patch Panel Production Drawings have been finished and after a tendering exercise The Patch panels are out to manufacture and we hope to have the first one by end of June.

8 G.Barber Mice Tracker Mechanical Ral June 2007 8 The Patch Panel/Diffuser Support The diffuser is supported from the outer cover of the patch panel. As this cover is only 5mm thick it needs to be braced. We are producing a crown which transfers the load back through the back plate of the patch panel to the Solenoid end plate.

9 G.Barber Mice Tracker Mechanical Ral June 2007 9 The Patch Panel/Diffuser Support The diffuser is supported from the outer cover of the patch panel. As this cover is only 5mm thick it needs to be braced. We are producing a crown which transfers the load back through the back plate of the patch panel to the Solenoid end plate.

10 G.Barber Mice Tracker Mechanical Ral June 2007 10 Still To Be Designed/Manufactured Tracker support/alignment feet location clamp Wave guide support frame (used for installation in the solenoid) External waveguide support between patch panel and VLPC cassettes Installation support equipment Supports for the cosmic ray tests Gas panel for the helium volume Etc…………