ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003.

Slides:



Advertisements
Similar presentations
20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
Advertisements

Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon.
sTGC for ATLAS Small Wheel upgrade
ATLAS small wheels and muon trigger upgrade Osamu Sasaki High Energy Accelerator Research Organization (KEK) INPUTS from RPC : S.Veneziano and G.Aielli.
27 Oct. 2000TGC Simulation video meeting1 Trigger Simulation Hisaya Kurashige KOBE Univ.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
8th Workshop on Electronics for LHC Experiment, Colmar, France, 10 Sep R.Ichimiya, ATLAS Japan 1 Sector Logic Implementation for the ATLAS Endcap.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
CF 8/June/2003 ATLAS muon week in Gallipoli 1 The 1 st Beam Test of TGC electronics at H8 in May/June ‘03 Chikara Fukunaga on behalf of TGC electronics.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
TGC Electronics Status Osamu Sasaki 23 Dec 河口湖 SLB ASIC PS-Board H-pT Board Star Switch Sector Logic Other boards Procurement 2004 極み.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
14/6/2000 End Cap Muon Trigger Review at CERN 1 TGC LVL1 Trigger System Link C.Fukunaga/Tokyo Metropolitan University TGC electronics group System link.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Hi-pT Board Hi-pT ASIC Board Type Endcap-wire Endcap-Strip Forward Chikara Fukunaga (TMU)
FDR of the End-cap Muon Trigger Electronics 1/Mar./04
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
14/Sept./2004 LECC2004 Irradiation test of ASIC and FPGA for ATLAS TGC Level-1Trigger System 1 TID (  -ray) and SEE (proton) tests and results for ROHM.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Design Studies of the ATLAS Muon Level-1 Trigger based on the MDT Detector for the LHC Upgrade O.Sasaki, Y.Suzuki, K.Nagano, M.Ishino, M.Ikeno (KEK), K.Bendtz,
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
IB PRR PRR – IB System.
STGC Trigger Electronics sTGC Trigger Electronics ATLAS New Small Wheel Milestone Meeting January 2013 Lorne Levinson L. Levinson, sTGC Trigger Electronics1NSW.
TGC electronics meeting at CERN June/ Status of ASIC development for TGC electronics PP SLB Hi-pT JRC PPE SSW-rx VME protocol Chikara Fukunaga TGC.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
H-pT ASIC A.The logic of H-pT ASIC 1. overview 2. matrix, encoder, selector… B. Test result 1. verification 2. electrical characteristics C. Usage.
ATLAS small wheels and muon trigger upgrade Osamu Sasaki High Energy Accelerator Research Organization (KEK) INPUTS from RPC : S.Veneziano sTGC : N.Lupu.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Results with the RPC system of OPERA and perspectives
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS-MUON Trigger hardware developments
Sector logic firmware and G-link Merger board designs
Japan Participation in Phase-II TDAQ Upgrade
EMU Slice Test Run Plan a working document.
eXtremely Fast Tracker; An Overview
Current Status of CSC Trigger Elements – Quick Summary
The First-Level Trigger of ATLAS
CSC Trigger Primitives Test Beam Studies
Presentation transcript:

ATLAS Muon Week in Seattle 30/June/04 1 Test Beam of TGC electronics in 2004 Introduction Member List Electronics Setup TGC Setup Overlap problem in 2003 Preliminary Results in 2004 Plan for next beam test in Sept./Oct. this year Chikara Fukunaga (TMU)

ATLAS Muon Week in Seattle 30/June/04 2 Introduction In June 2004 TGC electronics has been also brought into H8 and made performance test with a 25ns bunch structured muon beam (we will do again in September). The same electronics set has been used as in The current test is to confirm the performance we have achieved last year, and test trial of the configuration database. We will bring new (almost final) electronics before September.

ATLAS Muon Week in Seattle 30/June/04 3 TGC electronics Member List for June 2004 Beam Test Israel Y.Benhammou, E.Etzion, A.Harel, L.Levinson, D.Lellouch, R.Lifshitz, N.Lupu, G.Mikenberg, S.Schwarzmann, S.Tarem Japan O.Sasaki et al. (> 20 people participated)

ATLAS Muon Week in Seattle 30/June/04 4 TGC Test Beam Electronics Overview TTC/CCI Test ROD crate

ATLAS Muon Week in Seattle 30/June/04 5 Electronics Setup Chamber (Triplet 32(Strip) x 24(wire), Doublet both 32 chan.) ASD board (16ch.) x 2 PS pack PS board {8 PP (32 ch.) ASICs (Product.), 2 SLB ASICs (Proto. Version 2), 1 DCS-PS } x2 Hi-pT crate Forward Type Hi-pT board (4 Hi-pT ASIC (Proto. Version 3 ~ final) x1 Proto. Star Switch (SSW) module x2 HSC ROD crates Sector Logic for r-  coincidence RODs (ROD and Test-ROD simultaneously in different crates) TTC/CCI crate TTCvi - TTCvx CCI Cables AWT twisted pair cable with 10 from ASDs to PS boards Individually shielded TP Category-5 cable from PS board to Hi-pT crate 10m (ATLAS:15m) for LVDS Optical fiber from Hi-pT crate to Sector Logic/ROD in the hut 30m (ATLAS:150m) for G-link. DCS Final DCS-PS board with ELMB, mezzanine on a PS board Two DCS-PS boards The same set was used this time as one used in 2003

ATLAS Muon Week in Seattle 30/June/04 6 T8 type chambers were used for all M1(Triplet), M2(Middle) and M3(Pivot). In 2003 We used the same type chambers for both M2 and M3 – overlap problem This year correct chamber set for M2 is used. Trigger Electronics used was for forward type (PS-board, Hi-pT board) Channels M1 M2 M3 Wire Strip TGC Setup The chamber configuration has been slightly changed

ATLAS Muon Week in Seattle 30/June/04 7 Doublet Triplet Wire Support overlap problem in 2003 M1 Triplet M2 Middle M3 Pivot 10cm  wire~5cm  strip~4.5cm ~Layer6 ~Layer7 The beam was injected just on the wire support accidentally

ATLAS Muon Week in Seattle 30/June/04 8 Detection Efficiency distorted due to overlap in 2003 Chamber efficiency (Wire)Chamber efficiency (Strip) M1 M2 M3 Lower Efficiency due to Wire support

ATLAS Muon Week in Seattle 30/June/04 9 Trigger Efficiency distorted by overlap in 2003 Overlap of wire supports in 2 Identical chambers for M2 and M3 Triplet Low-pT logic : 2 out-of- 3, 1 out-of-2 worked fine. Doublet Low-pT logic: 3 out-of-4 did not work because 2 ineff. chambers.

ATLAS Muon Week in Seattle 30/June/ Preliminary Results (1) The trigger efficiency problem was cured this year using correct chamber setup for doublets High Trigger Efficiencies for both doublet strip and wire obtained in this year

ATLAS Muon Week in Seattle 30/June/04 11 Preliminary Results (2) HpT coincidence efficiency versus Chamber position Green: Trigger efficiency Red:Pt=6 Magenta:Pt=5 Blue:Pt=4 Cyan:Pt=3 Yellow:Pt=2 Black:Pt=1

ATLAS Muon Week in Seattle 30/June/04 12 Preliminary Results (3) Hi-pT and Sector Logic Trigger efficiencies versus PP ASIC Delay Hi-pT Sector Logic Previous Current Bunch Next

ATLAS Muon Week in Seattle 30/June/04 13 MDT-TGC Combined Test TGC has stable runs with MUCTPI and full readout chain, together with the MDT tracking chambers and their alignment. A trigger efficiency of 99.5% was obtained with respect to reconstructed MDT tracks.

ATLAS Muon Week in Seattle 30/June/04 14 VERY Preliminary Result Summary Low pT Trigger efficiency > 99.5% High pT Trigger efficiency > 98.0% (~ SL efficiency) SL output and MUCTPI input match perfectly > 99.99% Electronics components for both on- and off- detector worked reliably, no problem. Test trial of Integration of a Condition Database worked fine. Need some more time for results of Combined Test Beam Analysis.

ATLAS Muon Week in Seattle 30/June/04 15 Hardware Update Plan (July and Aug.) for the Next Test Beam in Autumn PS boards of nearly- production-version with updated SLB ASICs (proto. ver.2 to ver.4, which is final one but 1 known bug) Production-version Hi-pT boards with production version Hi-pT ASICs (so far proto. ver.3 has been used) + Anti-fuse FPGA Nearly-final-design SSW boards (but FPGA is conventional one, Anti-fuse one will be mounted in the final one)