International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
Site report GSI Darmstadt FAIR project Overview IT at GSI
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
EHEROES EC Grant Agreement Negotiations June 1, 2011 K.U.Leuven Research & Development Myriam Witvrouw.
FAIR GmbH and FAIR Project History, Status and Outlook
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
EPOCA – 11. June EPOCAConsortiumOrganisation.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
AIDA negotiation process AIDA NCP Meeting,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Financial reporting – design study 7 December 2006 F. Weissbach, GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Welcome to FAIR RF Review for TAC Meeting in June 2007.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 3rd Annual Report meeting January 29, 2008 J. Eschke,
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR CNI 2nd Annual Report meeting October 11, 2007 J. Eschke, GSI DIRAC-Phase-1.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study Project financial status R. Battistella, PSI June 2006.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
O. Kester, NuSTAR annual meeting, 27/02/2013
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
AMICI WP1 – Management, coordination and dissemination
Status of HESR 18th March Gießen Dieter Prasuhn.
Gunnar Buckau, Forschungszentrum Karlsruhe, Germany
as of today 123 registered participants
From a project idea to the kick-off meeting
FAIR – the Universe in the labororatory
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Presentation transcript:

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI 1.Introduction  Submission of Proposal  EU contract 2.Scientific and technical scope of Design Study (DS) 3.Participating institutes / distribution of work and financial resources 4.Management of DS 5.Signing of documents and next steps 6.Agenda of the meeting

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Calls: , Budget 70 Mio € (122 applications, 5 times overbooked) Call 2005 canceled (budget transferred to 1. Call), Call 2006 ? FAIR applications: Design Study "DIRACsecondary-Beams": (Feb Jan. 2008) application to EU: 10 Mio€ ( 9 Mio€ approved, total budget ~ 22 Mio€ ) Construction of new infrastructure "DIRAC-PHASE-1": (mid 2005 – mid 2009) application to EU: 14,8 Mio€ ( 10,4 Mio€ approved) EU funding 100% for Construction (up to 10% of total construction cost) EU Support for Research Infrastructures in FP6 "Design Studies" and "Construction of new infrastructures"

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR History of the Design Study Proposal: mid 2003: Start preparation of proposal : Submission of proposal : Start of contract negotiations Feb. 2005: completion of contract negotiations : signing of EU contract by Coordinator GSI  Start of contract 1. February 2005 (duration 36 month)

Primary Beams /s; GeV/u; 238 U 28+ Factor over present intensity 4(2)x10 13 /s 30 GeV protons /s 238 U 73+ up to 35 GeV/u Secondary Beams Broad range of radioactive beams up to GeV/u; up to a factor in intensity over present Antiprotons 3(0) - 30 GeV Storage and Cooler Rings Radioactive beams e – A(RIB) collider stored and cooled 3(0) – 15 GeV antiprotons Cooled beams Rapidly cycling superconducting magnets Key Technical Features UNILAC ESR GSI Accelerator Facilities Future Accelerator Facilities SIS100 /SIS300 Plasma Physics CBM HESR NESR Super- FRS CR Atomic Physics PANDA FAIR NUSTAR Scope of Design Study:  secondary beams (RIB and Antiprotons)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Tasks

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Tasks

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Participants 33 participating institute (31 contractors)

Total eligible costs (Total budget and EC contribution for each task)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR

Management Structure Design Study "DIRACsecondary-Beams" EC Design Study Coordinator Management Office Steering Committee (Design Study Coordinator, FAIR Project Leader, GSI Director, Representatives of the 5 Design Projects) Design Project PANDA 1 Coordinator / 4 Task Leaders / 16 Participating Institutes Design Project NUSTAR 1 Coordinator / 5 Task Leaders / 10 Participating Institutes Design Project HESR 1 Coordinator / 4 Task Leaders / 3 Participating Institutes Design Project COOLSB 1 Coordinator / 2 Task Leaders / 2 Participating Institutes Design Project SIS100 1 Coordinator / 6 Task Leaders / 12 Participating Institutes Governing Board (representatives of 33 Institutes/Institutions) Advisory Boards  existing PACs and TAC of FAIR project Design Study Technical Group ( Design Study Coordinator, 5 Design Project Coordinators and 21 Task Leaders )

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Management Design Study: Design Study Coordinator: Jürgen Eschke, GSI Head Management Office: Thomas Beier, GSI Management Office: NN, GSI Consortium Agreement: Katharina Berghöfer

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Design Project Leader: 1. PANDA: James Ritman (FZJ) 2. NUSTAR: Martin Winkler (GSI) 3. HESR: Raimund Tölle (FZJ) 4. COOLSB: Markus Steck (GSI) 5. SIS100: Peter Spiller (GSI)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Steering Committee Tasks of the Steering Committee The Steering Committee assists the Design Study Coordinator and is responsible for the operation of the whole Project as a homogenous body.... The Steering Committee’s tasks are: Review of resource status and Project progress Preparation on major changes in the implementation plan including re-distribution of the budget, to be approved by the Governing Board Monitoring of scientific and technical progress (improve quality of reports) Composition of the Steering Committee The Steering Committee is composed of: -The Design Study Coordinator as the Chairperson -The FAIR Project Leader -The GSI Director -One representative of each of the five Design Projects J. Eschke (Chair), H. Gutbrod, W. Henning, PANDA (Paola Gianotti, Frascati), NUSTAR (R. Krücken, München), HESR (R. Maier, FZJ), COOLSB (B. Franzke, GSI), SIS100 (H. Eickhoff, GSI)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Signing of documents At the meeting of the Governing Board the representatives of the participating institutes will receive: a.) a copy of the EU contract b.) 3 signed accession froms (to the contract) c.) a signature page for the consortium agreement. These documents should be signed within 2 weeks and returned to the coordinator until the end of April! The Description of Work (Annex I to the contract) and the final version of the consortium agreement will be distributed by !

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR  Start of contract 1. February 2005 (duration 36 months) EC financial contribution for all contractors will be transferred to the coordinator GSI (Article 8). The pre-financing for the first 18 months of the contract will be 3.96 Mio € (44% of 9 Mio €).  GSI will transfer the 44% of the EC contribution to each contractor.