Presentation is loading. Please wait.

Presentation is loading. Please wait.

Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.

Similar presentations


Presentation on theme: "Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI."— Presentation transcript:

1 Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI

2 Facility for Antiproton and Ion Research 14 Partner Countries so far: Observers: Austria China Finland France Germany Greece India Italy Poland Romania Russia Spain Sweden UK EU USA Hungary Slovenia

3 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR ESR Construction in three phases until 2016 Total cost 1.2 B Scientific users: 2500 - 3000 per year Construction Period, Cost, Users 65 % Federal Government of Germany 10 % State of Hessen 25 % Partner Countries FAIR GmbH with International Shareholders Financing Layout of the FAIR Facility GSI today FAIR facility Beam intensities up by factors of 100 - 10000 Beam energies up by a factor 20 Production of antimatter beams Factor 10 000 up in beam brilliance via cooling Efficient parallel operation of programs Gain Factors

4 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR ESR FLAIR Rare-Isotope Production Target Antiproton Production Target CBM PP / AP Primary Beams 40 Ar 18+ 2x10 12 /s @ 1 – 2 AGeV 238 U 28+: 5x10 11 /s @ 1 – 2 AGeV 40 Ar 18+ 2x10 10 /s @ 1 – 45 AGeV 238 U 92+: 1x10 10 /s @ 1 – 35 AGeV 100 - 1000 times present intensity Protons: 2 – 5 x10 13 /s @ 30 GeV Primary Beams 40 Ar 18+ 2x10 12 /s @ 1 – 2 AGeV 238 U 28+: 5x10 11 /s @ 1 – 2 AGeV 40 Ar 18+ 2x10 10 /s @ 1 – 45 AGeV 238 U 92+: 1x10 10 /s @ 1 – 35 AGeV 100 - 1000 times present intensity Protons: 2 – 5 x10 13 /s @ 30 GeV Secondary Beams Broad range of radioactive beams up to 1 – 2 AGeV RI- Intensities up 10 000 - fold Antiprotons Secondary Beams Broad range of radioactive beams up to 1 – 2 AGeV RI- Intensities up 10 000 - fold Antiprotons Storage and Cooling of Beams R adioactive beams anti-proton – A + e - – A collider Antiprotons: > 10 11 at 0.8 – 15 GeV/c Future: Polarized antiprotons Storage and Cooling of Beams R adioactive beams anti-proton – A + e - – A collider Antiprotons: > 10 11 at 0.8 – 15 GeV/c Future: Polarized antiprotons Key Technical Features Phase-space optimization cooled beams, low-q ion beams Rapidly-cycling super-conducting magnets Efficient parallel operation of up to 4 programs Key Technical Features Phase-space optimization cooled beams, low-q ion beams Rapidly-cycling super-conducting magnets Efficient parallel operation of up to 4 programs A FAIR Performance !

5 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR GSI today Future facility ESR FLAIR Rare-Isotope Production Target Antiproton Production Target CBM PP / AP Hadron Structure, QCD-Vacuum and Medium Stored and cooled Anti-protons up to 15 GeV/c, 500 users Hadron Structure, QCD-Vacuum and Medium Stored and cooled Anti-protons up to 15 GeV/c, 500 users Nuclear Structure & Nuclear Astrophysics RI Beams from high-energy fragmentation; 600 users Nuclear Structure & Nuclear Astrophysics RI Beams from high-energy fragmentation; 600 users Physics of Dense Bulk Plasmas Ion-beam bunch compression + high-energy petawatt-laser; 250 users Physics of Dense Bulk Plasmas Ion-beam bunch compression + high-energy petawatt-laser; 250 users QCD-Phase Diagram: Nuclear & QGP Matter HI Beams 2 to 45 GeV/u; 400 users QCD-Phase Diagram: Nuclear & QGP Matter HI Beams 2 to 45 GeV/u; 400 users Materials Science, Radiation Biology (Ion & antiproton beams; 350 users Materials Science, Radiation Biology (Ion & antiproton beams; 350 users Fundamental Symmetries & Ultra- High EM Fields Antiprotons and highly stripped ions; 150 users Fundamental Symmetries & Ultra- High EM Fields Antiprotons and highly stripped ions; 150 users Accelerators: Linac, Double SC Synchrotrons, Storage Rings, Cooler Rings Fields of Research at FAIR

6 2000200220042006 Workshops / White Papers: exploration of science opportunities Wissenschaftsrat-Evaluation& RecommendationBMBF Press Release:'Green Light' contingentupon 25 % intern. contrib. CDR Submission Preparation of the CDR (Concepual Design Report) in close collab. with intern. user community International SteeringCommittees established International MoUfor preparatory phase 7 Nov 2007: FAIR Start Event BTR Submiss. incl. Cost BookLegal & Governance StructureConsent by Intern. Steering C. Preparation of the BTR ( Baseline Technical Report) and of the Legal & Governance Structure 2007... Milestones... Brief History of the FAIR Project... NuPECC LRP:'highest priority' On ESFRI List fornew researchinfrastructures German NationalKHuK-Commitee:'highest priorit y'

7 PAC QCD E. Chiavassa PAC NUSTAR R. Casten PAC APPA D. Schwalm TAC R. Garoby FAIR H. Gutbrod, D. Kraemer JCT CORE Cost Review Groups D. Plane, W. Bartel FCI Full Cost Issues B. Brandt AFI Working Group Administrative + Funding Issues Ö. Skeppstedt LFI Legal Framework Issues U.B. Jahn STI Working Group Scientific + Technical Issues H. Wenninger ISC International Steering Committee H. Schunck / J. T. Gierlinsky Mini-TACs Cryogenics Warm magnets Cold magnets Power Supplies Beam Instrumentation p-Linac International Committee Structure during the FAIR Preparatory Phase

8 Resolutions from the Recent ISC Meeting (October 17, 2007)... ISC approves the 7/11 FAIR start version recommended by STI…... ISC urges all interested partners to provide further resources in duetime in order to realize the full version according to the BaselineTechnical Report as soon as possible....... ISC approves the modified convention and the final act. ISC urges itsmembers to finalize the necessary legal steps regarding thesedocuments...... From the FAIR Start Event (Nov. 7, 2007) until the incorporation of theFAIR GmbH, the ISC will continue its work and will apply its Rules ofProcedure according to the 'Rules of Procedure for the (future) FAIRCouncil'.... The ISC authorizes the ISC Chair to set up Search Committees for thetwo Managing Directors of the future FAIR GmbH. ISC members areasked to make proposals for the members of the Search Committees byNovember 10, 2007.

9 You are cordially invited to attend the....

10 Invitation

11 Thank You! FAIR in 2016...


Download ppt "Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI."

Similar presentations


Ads by Google