FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague, 17.6.111.

Similar presentations


Presentation on theme: "FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague, 17.6.111."— Presentation transcript:

1 FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague, 17.6.111

2 PANDA FAIR Guenther RosnerNuPECC, Prague, 17.6.112 Nuclear Structure & Astrophysics (Rare-isotope beams) Nuclear Structure & Astrophysics (Rare-isotope beams) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) Hadron Physics (Stored and cooled anti-protons) Hadron Physics (Stored and cooled anti-protons) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Materials Science & Radiation Biology (Ion & antiproton beams) Materials Science & Radiation Biology (Ion & antiproton beams) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Accelerator Physics

3 Parallel Operation Guenther RosnerNuPECC, Prague, 17.6.113

4 Experiments Guenther RosnerNuPECC, Prague, 17.6.114 NuSTAR PANDA APPA CBM

5 Guenther RosnerNuPECC, Prague, 17.6.115

6 Hadron Spectrocopy Guenther RosnerNuPECC, Prague, 17.6.116 PANDA @ FAIR

7 Phases of Strongly Interacting Matter Guenther RosnerNuPECC, Prague, 17.6.117 ALICE @ LHC CBM @ FAIR

8 Staging Guenther RosnerNuPECC, Prague, 17.6.118 Start Version Phase A (SIS100) Phase B (SIS300) Modularised Start Version Module 0Module 1Module 2Module 3Module 4Module 5 SIS100Exp. halls for CBM & APPA Super-FRS for NuSTAR Antiproton Facility for PANDA & options for NuSTAR LEB, NESR, FLAIR for NuSTAR or APPA RESR for PANDA, NuSTAR & APPA

9 Modularised Start Version Guenther RosnerNuPECC, Prague, 17.6.119 APPA CBM/HADES NuSTAR PANDA Experiments M1: APPA M1: CBM/HADES M2: NuSTAR M3: PANDA M0 M1 M2 M3

10 MSV Timelines Guenther RosnerNuPECC, Prague, 17.6.1110 2009 2012201120102013 201620152014 1234 5 6 Submission of pre-planning documents to HBM Clarification of user requirements Modularised Start Version (MSV) Start revised pre-planning for MSV Expected approval of revised planning for MSV Preparation of documents for building permit Expected approval for (partial) building permit Start site preparation (clearing trees) Award contracts on civil construction work lot 1-4 Completion of civil construction work lot 1-4 Start installation of accelerators and detectors 7 910 1 2 3 4 5 6 7 8 9 8 2017

11 MSV Costs Guenther RosnerNuPECC, Prague, 17.6.1111 Total accelerator and personnel Modules 0 - 3502 M€ Total civil construction Modules 0 - 3400 M€ FAIR contribution to MSV experiments costs*78 M€ FAIR GmbH personnel and running costs47 M€ Grand Total Modules 0 - 31027 M€ in 2005 € * Total MSV experiments costs ca. 170 M€ in 2011 €

12 Funding of FAIR Modules 0-3 Guenther RosnerNuPECC, Prague, 17.6.1112 Spain expected to join soon (11.87 M€) China and UK will contribute to experiments (6.6 M€)

13 FAIR Organigram Guenther RosnerNuPECC, Prague, 17.6.1113 Council Managing Directors B. Sharkov (Chairman), S. Richter Directors‘ Office Council Matters Office Legal Advisor 3 rd Party Funding Officer Technical Division Director: D. Kraemer Project Office Acc. Liaison Technical Follow-up In-kind Coordination Research Division Director: G. Rosner Exp. Coordination APPA CBM NuSTAR PANDA Site & Buildings Division (D. Kraemer, G. Rosner) Administrative Division Director: S. Richter Controlling & Resource Planning Finances

14 FAIR MSV Experiments APPA SPARC HEDgeHOBWDMBIOMAT CBMNuSTAR LEB Super- FRS HISPEC/ DESPEC MATSLASPECR3BR3BILIMA PANDA Guenther RosnerNuPECC, Prague, 17.6.1114

15 Timelines Experiments Finish R&D phase2011 – Deliver prototypes of all essential parts Submit complete sets of TDRs2011 – Take decisions on alternative technical solutions Co-ordinate with2011 – Civil construction requirements – Accelerator setup schedule Identify critical pathways2011 – Milestones, timelines, deliverables Submit risk management plan2011 Secure funding2011/12 Negotiate MoU with FAIR2011/12 (Europe-wide) tendering2012 Build detector2013-16 Commission detector2017 Initial period of data taking2018-20 Guenther RosnerNuPECC, Prague, 17.6.1115

16 Commissioning & Operation Commissioning MSV, Modules 0-3 – Top priority: Module 0 – SIS100 – Sequence of experiments depends on Civil construction Progress in – Prototyping & building of accelerators (storage rings) – Prototyping & building of production targets (RIB & anti-proton targets) – Prototyping & setting up of large-scale experimental equipment Funding (majority from outwith FAIR MSV budget) Operation MSV, Modules 0-3 – Signing of agreement on financing the FAIR operation budget three years after project has started Development of model for fair share of costs for operating FAIR Explore – Contributions from countries that are not shareholders, but participate in exploiting the facility scientifically – Set up common collaboration funds for running the experiments (cf. DESY & CERN) Modules 4 & 5, Phase B – Secure funding for civil construction, accelerators and experiments of Modules 4 & 5 – Continue R&D, in particular for SIS300, HESR Electron Cooler and NESR Electron Ring Guenther RosnerNuPECC, Prague, 17.6.1116

17 Thank you very much Guenther RosnerNuPECC, Prague, 17.6.11 17