“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.

Slides:



Advertisements
Similar presentations
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Advertisements

1 M-150 / Botts Rd Interchange MoDOT Project No. J4P2251 Pre-Bid Meeting June 24 th, 2010.
© 2014 HDR, all rights reserved. I5-Broadway Weilder – Safety Analysis Jon Makler, ODOT Miranda Wells, HDR OR ITE Winter Workshop February 26 th, 2015.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
West Contra Costa Unified School District
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
MISSISSIPPI CONTRAFLOW OPERATIONS Providing the State of Louisiana Assistance during the Hurricane Emergency Evacuation of New Orleans Bob Chapman Emergency.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Poplar Street Conversion Open House August 7, 2012.
May 7 th, Purpose and Scope of Project Project History Project Elements Next Steps.
Mecca Roundabout Project Mecca, CA September 28, 2011.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
Ramp Metering Pilot Project May 11th, 2010 E. Jason Sims, P.E. Kansas City Scout TMC Manager.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
SR A1A / SR 200 Reconstruction Project
Module 5 Displaced Left Turn (DLT) Intersections
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
The Basics of CFI ABMB CFI.avi  At-Grade Intersection  Left-turns happen in advance of the main intersection  Movements occur simultaneously  This.
November 5, 2010 ITSO Trans Talk Vern Swing, P.E. & Steve Manhart, P.E., PTOE, PTP November 5, University of Minnesota DIVERGING DIAMOND INTERCHANGE.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
 Links the optimized settings to VISSIM, the operational analysis results is: Synchronization of Intersections This study employs the core logic of MAXBAND.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Action 2020 Training Local Context August 15, 2012.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Evaluation of Automated Camera Enforcement on Red Light Running Violations by Time into the Red Phase Nicole Oneyear and Shauna Hallmark.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Project Highway: Ramp Metering Isaac Quaye Junior Jared Sagaga Junior Emma Hand Sophomore.
I-465 at I-65 Interchange Modification Public Meeting 6 p.m., Thursday, August 14 South Grove Intermediate School, Beech Grove, IN.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Secor Road Reconstruction Project Public Meeting #2
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Fordham at Columbia as a Grade-Separated Intersection
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
Work Zone Safety Review – District 1 - Duluth
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
ROUNDABOUTS Improving Safety and Efficiency
Transportation Improvement Program and Air Quality Conformity Analysis
Double Crossover Diamond Interchange
HHS Freshman Academy Update
Using CMFs in Planning for Virginia’s Project Funding Prioritization
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Contract 60X10 Informational Meeting Weber I-55
Comprehensive Transportation Plan
Bus. Hwy. 13 and Hawthorne Blvd. roundabout project March 28, 2019
Harbour Island Force Main Replacement
Fordham at Columbia as a Grade-Separated Intersection
Brunswick Maine Street Bridge Feasibility Study Preliminary Alternative Evaluation September 12, 2019.
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield Region

Kansas & I-44, 2008

Norton Rd. 681 ft’ Evergreen 296 ft’

Basic Interchange Problems  Congestion 15-30% left turns 10-15% HGV Closely spaced signals  Crashes  Pedestrian Accommodations

Congestion

Concept Design of the DDI

VISSIM Model

inVISION Studios Simulation

Opening Day – June 21 st, 2009

Opening Day Signal Timing  Interchange still under construction  Norton Rd Autoscope System failed  No Evergreen Rd signals due to construction  Time Travels run each plan throughout the day

Signal Timing  First in the nation  1 controller, dual ring configuration  Semi-compatible with Synchro  Offsets produced from travel times and VISSIM  Mostly seen as a 2 phase interchange  Timing set as a 4 phase operation Phase 2 Phase 4 Phase 6 Phase 8 Phase 6

Phase 1 - Northbound Phase 2 Phase 4 Phase 6 Phase 8 Phase

Phase 2 - Clear Phase 2 Phase 4 Phase 6 Phase 8 Phase

Phase 3 - Southbound Phase 2 Phase 4 Phase 6 Phase 8 Phase

Phase 4 - Clear Phase 2 Phase 4 Phase 6 Phase 8 Phase

Finishing the DDI  Islands installed  Pedestrian buttons added  Temporary signals moved from gores  Permanent advanced signals added in islands

July 7 th, 2009

Pedestrian Access

Project Timeline  Construction began: January 16 th, 2009  Lane restrictions on bridge: March 4 th, 2009  Traffic moved to DDI: June 21 st, 2009  Construction completed: July 7 th, 2009  Last modification: August 25 th, 2009  Final cost: $3.2 million

Operational Effects Superload on March 3, 2010

Operational Effects  Accidents Total Reduction 24% (50% between ramps) Injury Reduction 50%  Congestion removed on the bridge  Consultant Performance Evaluation (HDR)

Future Designs  Already planned for future interchanges Springfield, MO Kansas City, MO St. Louis, MO American Fork, Utah  Not the right choice for every problem High left turn volumes Modeling failed for Campbell & JRF Modeling is highly recommended

Public Perception  MoDOT survey of 8 zip codes  400 sent, 75 returned The Right Solution – 89.4% More Convenient – 95.1% Less Congested – 95.2% Safer – 96.7%

National Media “Looks pretty strange, but if it improves traffic flow, and safety, how can anyone complain?” “Kudos to MODOT for such a simple and elegant solution”

Questions? Joseph C Rickman, PE, ACTAR District Traffic Engineer