Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Electrical and thermal testing at Glasgow and Liverpool.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 CPC2-CPR2 Assemblies Testing Status Charge Amplifiers –Attempts to make them work Best voltage single channel 2MHz Cluster finding first.
Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification –Visual Inspection and conformation.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
Glasgow Report W. H. Bell, A. Cheplakov, F. Doherty, M. Horn, J. Melone, V. O’Shea UK-V Meeting 03/03/04 -Glasgow.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Short update from Glasgow R. Bates, A. Blue, T. McMullen.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
1 End-cap Module Electrical Specs. And Performance C. Lacasta + J. Pater, R. Bates, J. Bernabeu, P. Dervan, A. Greenall, C. Ketterer, J.E. Garcia, G. Moorhead,
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Markus Friedl (HEPHY Vienna)
MODULE QUALIFICATION STATUS AT LIVERPOOL
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
ATLAS ITK WP3 WP3 Bi-weekly meeting
Update of US Testing Status
US Module Production Quality
On behalf of the US TOB testing group
Hybrid & Module Electrical Testing
RPC Electronics Overall system diagram Current status At detector
Tests of Endcap capillary & Heat exchangers at CERN
Presentation transcript:

Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty, M. Horn SCT Meeting –22 nd September 2003

22nd Sept Richard Bates2 Overview  Pre-qualification  5 qualification modules  S-curves  Wirebonding  Multi-module testing  Conclusions

22nd Sept Richard Bates3  Glasgow pre-qualified start of July 2 Modules: M-O-040_ – 3 un-bonded channels M-O-044_  Problems with fan-in  Glue on fan-in during construction  Three groups of un-bondable channels ( => 191 defects!)  Remove these => 19 defects, 5 un-bonded (12 bad to start with) Pre-qualification

22nd Sept Richard Bates4 5 qualification modules  4 Finished all Glasgow steps and in spec!  One requires rework of VDC chip wire bond Output of VDC bond wire touching VDC chip Then final electrical tests to be performed  Glasgow steps Wirebonding Thermal cycling Long term test Electrical Characterisation

22nd Sept Richard Bates5 Modules       All in spec bar high noise on # extra electrons Work in progress on VDC bonding  S-curve problems has delayed qualification request!

22nd Sept Richard Bates6 Summary of  IV – good – see plot  13 bad channels (started with 10 defects)  0 un-bonded  T=9 o C  Gain = 55.4  Noise: link0=1432ele, link1=1428ele  No: module = 7.53x10 -6, link0=6.97x10 -6, link1=6.81x10 -6  TW: link0 = 10.3ns, link1 =10.2ns

22nd Sept Richard Bates7 Summary of  T=20 o C  RH<10%  502nA  656nA

22nd Sept Richard Bates8 TW of  TW: link0 = 10.3ns link1 =10.2ns

22nd Sept Richard Bates9 Summary of  IV – good – see plot  8 bad channels (started with 0 defects)  7 un-bonded  T=11 o C  Gain = 56.0  Noise: link0=1408ele, link1=1421ele  No: module = 5.4x10 -5, link0=5.6x10 -5, link1=5.5x10 -5  TW: link0 = 10.1ns, link1 =10.4ns

22nd Sept Richard Bates10 Summary of  T=20 o C  RH<10%  266nA  420nA

22nd Sept Richard Bates11 TW of  TW: link0 = 10.1ns link1 =10.4ns

22nd Sept Richard Bates12 Summary of  IV – good – see plot  18 bad channels (started with 12 defects)  6 un-bonded  T=10 o C  Gain = 54.7  Noise: link0=1478ele, link1=1499ele  No: module = , link0=8.46x10 -6, link1=1.12x10 -5  TW: link0 = 10.4ns, link1 =10.9ns

22nd Sept Richard Bates13 Summary of  T=20 o C  RH<10%  430nA  594nA

22nd Sept Richard Bates14 NO of

22nd Sept Richard Bates15 TW of  TW: link0 = 10.4ns link1 =10.9ns

22nd Sept Richard Bates16 LongTerm test of

22nd Sept Richard Bates17 Summary of  IV – good – see plot  25 bad channels (started with 10 defects) (just in spec!)  11 un-bonded, 1 part-bonded  T=11 o C  Gain = 54.4  Noise: link0=1503ele, link1=1506ele  No: module = 2.90x10 -5, link0=3.35x10 -5, link1=3.13x10 -5  TW: link0 = 10.8ns, link1 =11.6ns

22nd Sept Richard Bates18 Summary of  T=20 o C  RH<10%  318nA  523nA

22nd Sept Richard Bates19 TW of  TW: link0 = 10.8ns link1 =11.6ns

22nd Sept Richard Bates20 LongTerm Test of

22nd Sept Richard Bates21 Summary of  IV – good – see plot  1 bad channels (started with 1 defect)  0 un-bonded  T=8 o C  Gain = 51.2  Noise: link0=1640ele, link1=1655ele  No: module = 7.53x10 -6, link0=6.97x10 -6, link1=6.81x10 -6  TW: link0 = 10.0ns, link1 =10.3ns

22nd Sept Richard Bates22 Summary of  T=20 o C  RH<10%  215nA  338nA

22nd Sept Richard Bates23 TW of  TW: link0 = 10.0ns link1 =10.3ns

22nd Sept Richard Bates24 S-curves  Measurements made In Valencia test box Inside metal enclosure AERO r/o Shielded twisted pair power cables with KEK style chokes Shielded TP signal cables + ferrite chokes near patch card  Tried many grounding schemes Unable to remove discontinuity  Problem due to degradation of electrical contact between module and cooling block during cooling? To try spring washer

22nd Sept Richard Bates25 Example of S-curves  Discontinuity at 50mV and ~60mV  Not effected by Vled value

22nd Sept Richard Bates26 Wirebonding Summary  Some lost bonds : average = part-bonded  All chip to fan-in bonds  Lost bonds due to jig Only holds hybrid on edges – slight bounce Improved jig by holding module at mounting point No support on fan-in as this is of unknown height  Used for #44 0 un-bonded

22nd Sept Richard Bates27 Multi-module testing  All measurements to date done in single enclosure with capability for two modules  Second DAQ for multi-module testing present  All hardware present – waiting for final grounding scheme

22nd Sept Richard Bates28 Conclusions  Not quite there yet!  Need to understand s-curve problem  Transfer grounding to multi-module set-up  Hope to make progress during this week on s-curves