SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.

Slides:



Advertisements
Similar presentations
ISO ESP Systems Task Group Leader, Shauna Noonan
Advertisements

Petroleum technology Pressure Sensor © 2012, all rights reserved Gauges Deployment.
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Completion Object Overview June 2013 WITSML/PRODML Standards.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
OGP STANDARDS COMMITTEE MEETING Berlin, Germany Presentation of TC 23: current events and the agenda of the coming years V.V.Vernikovsky, executive.
API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test 1 Design Methodology has been in review and development for 5+ years and.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.
NSF 61 - Purkiss December 1, Diluted Surface Area- Section 3 Current Requirements of Section 3.2 require 100% complete formulation information for.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
Use of API 6A vs ISO in marking 6A equipment
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
1 Design Materials QC Validation HPHT Approach Why Needed? HPHT & Critical Applications – Defined by CFR for Surface Equipment as:  SITP at Wellhead of.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
19th January 2012 Don Wells (Hess)
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Introduction to Well Completions
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Well Control Rule Lakeisha Harrison, Chief, Regulations and Standards Branch, Office of Offshore Regulatory Programs, BSEE July 2016 “To promote safety,
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
Oil-Field Hydraulics Chapter 2 Production Equipment
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
CEN/TC 12 and ISO TC67 SC4 Plenary meeting
TG Chair: Mark Brinsden Shell
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
Impact on SC 6 Documents by Kenneth Young
Completion Object Overview
Status Update on API 16Q / 16R / 16F
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
2016 Exploration & Production Standards Conference Subcommittee 10
ISO TC64/SC4/WG2 May 2011 status
Use of API 6A vs ISO in marking 6A equipment
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
Development of a specification
Impact on SC 6 Documents by Kenneth Young
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Gas Lift Workshop – 2003 ISO Update
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Jim Raney, Director Engineering & Technology
Presentation transcript:

SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013

SC19 Subcommittee on Completion Equipment Completion Equipment includes: Perforators, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screens, Gas Lift, Barrier Valves, Completion accessories, Liner Hangers  TG on Sand Screen equipment has 1 specification (API 19S1) based on ISO 17824; TG is addressing quality inspection (wire wrap slot inspection) and validation testing (Burst and Collapse) of Wire Wrapped Screen and High Pressure leak off test. The goal is to ballot ISO for adopt-back as API 19S1 in 1Q14.  TG on Perforating equipment has one RP 19B which has 6 sections covering evaluation of perforators under surface, stress, elevated temperature, simulated downhole, debris evaluation and measurement of gun swell. Work is ongoing on first 5 sections. Key updates are: creation of a witness data sheet to compare relative performance between equipment Ongoing work to create cement targets that better mimic the properties of rock with respect to porosity and Ultimate Compressive Strength  API 19V1 Sub Surface barrier valves will be published as an adopt back from ISO Some comments were received which will be addressed using a Regional Annex.

SC19 Subcommittee on Completion Equipment  API 19TT1 is in development to address Downhole Well Test Tools. Scope of document covers valves, gauges, jars, service packers and connections to monitoring conduits. In addition to product specifications, the standard: Will contain technical and quality requirements for the service centers Will address electrical equipment  TG on gas lift equipment has 3 specifications and 10 recommended practices documents. Suite of documents covers equipment and operations: Side Pocket Mandrels, Flow Control Devices, Running Tools and, Design, Operation, Maintenance and Surveillance Key updates are: API RP19G9 Design, Operation & Troubleshooting of Dual Gas-lift Wells passed 2 nd ed. Ballot. Adding prescriptive design calculations and more stringent validation grades for HPHT equipment  TG on SSFC has 2 specifications and 1 recommended practices document. Suite of documents covers SSSV, Locks and Landing Nipple design and manufacturing and Installation, Operation and Redress of SSSV Key updates are: API 14A, specification for SSSV is almost ready for ballot by end of 1Q2013. It contains requirements for HPHT equipment. The industry will have to start informing the supply chain of the differences between API 14A and ISO API RP 14B, Design, Installation, Repair and Operation of Subsurface Safety Valve Systems will start being edited this year. TG is open to participants.

SC19 Subcommittee on Completion Equipment  TG on Packers has started editing API 11D1 Key updates are: The document will be updated via a Regional Annex. Goal is to add requirements for HPHT equipment. The scope will exclude Drill Stem Test Tools and DST Packers  TG on Liner Hangers held the first meeting in January The specification in process will include both conventional and expandable Liner Hangers as well as Tie Back seal stem, second trip packer, plugs, landing collar, and running/setting tools. The document will be written with an awareness of RP 96 (to evaluate which of the equipment may be barriers at some point in their installation)  The standard on Completion Accessories was sent to OGP for use in the interim solution. It is ready for an FDIS ballot in ISO. Once complete, it will be back-adopted by API.