Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.

Slides:



Advertisements
Similar presentations
National manuals Hanna Tolonen EGHI subgroup on HES, 2 nd March 2011, Luxembourg.
Advertisements

Phil Jones Data Retention Capita One Software Update Seminars 2014.
Update to RMS February 3,  2015 AMWG Leadership ◦ Esther Kent (CNP) and John Schatz (TXU), by affirmation, return as co-chairs  2015 AMWG Goals.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
© 2007 COPLAN AND COMPANY. All Rights Reserved. Permission granted for use by HIMSS membership. 1 Procurement Management Scott R. Coplan, PMP Educational.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Help Manual for Tender Download on DAE portal.. Open the Internet Explorer and type the URL of the portal. In this case we are considering the example.
Yaoundé, November Presented by: Mamata Teindrebeogo, Amadou Doudou Seck World Bank.
Project Management (seminar)
David Warne Independent Manufacturing Consultant.
Project Management HNC Computing 2000 Unit 8 Quality Management Prepared by S Hargrave.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.
End Of Day Scheduling Features Overview. ________________________________________________________________________________ Technical Features: It has the.
Progress report on the test facility project design and construction P. Schnizer and L. Serio on behalf of bldg. 180 test facility project team members.
AccessAMS – Laserfiche FAQ’s September 24 th, 2014.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Professional Intern Program Level I Oral Presentation Preparing for Integrated Financial Management Project (IFMP) Michelle Delaney Administrative Systems.
DEV234 Project Management For.NET Developers Marc Gusmano Director of Emerging Technologies The Information Management Group.
OASYS Teacher Evaluation
CONSUMPTION PLAN [client] [project name] [usage lead]
Project Management Methodology Development Stage.
CALLS FOR TENDER AND MARKET SURVEYS - ROLES AND PROCEDURES L.ANNILA, K.FORAZ PART 2. ROLE OF THE COMITE DE LECTURE.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Status of Activities WP1 – Case Leuven Johan Van Assel, Aquafin November 17, 2011.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
Deploy MRP Presented by: Bryan Dehler Implementation Consultant November 9 th, 2015.
Welcome to the Minnesota SharePoint User Group August 13 th, 2008 Open Panel Discussion Wes Preston, Todd Klindt, Neil Iversen,
MRP Deep Dive Presented by: Bryan Dehler Implementation Consultant November 10 th, 2015.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Customer type Complaint name Component name Component company Component figure Details of component.
MCP Status Magnet Control Project - MCP Common systems: MCS – Magnet Control System – S. Ravat MDS – Magnet Diagnostics System – S. Ravat MSS – Magnet.
/ Reijo Prokkola Procurement of real-time travel times in Finnra.
Working Hours Utilities. An easy to use tool that helps maintain your company resources (setup working hours for users, update when facilities and equipment.
Introduction to Project Management Darren Trofimczuk.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
Decision required Home Complete Start Action 2014 Edition BLUEPRINT MAP KEY A start node that indicates where to begin the map Indicates the direction.
Planning & Scheduling a Production Activity BRITA LYONS HEGARTY, MARKET KNOWHOW 16 TH NOVEMBER 2015 TRADEIT: SMART USE OF ITWORKSHOP.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 25/07/12 Project #4R. Fortin PH-DT-DI1 Status of procurement:
Update on Local Development Operational Plans (LDOPs)
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
Procurement of the 10TBq 137Cs Source, Irradiator and Filters GIF 137Cs at start: 740 GBq Other characteristics of 137 Cs remain: Half-life: y Beta.
© 2013 IBM Corporation 1 Welcome to SUA/ILMT design validation session.
PPC Dose Consulting Private Limited is a PPC Services Provider Company for Tech Support industries. We designed our campaign as per client market goals.
Windows 7 Ultimate
The Next Generation of a Gamma Irradiation Facility GIF++
The Chest Supplier Guide December 2015.
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
Microsoft 365 powered device offers Execution Guidance
(Hardware & Infrastructure)
Our Change Management Approach
سياحة 449 (إدارة وتنظيم المنشآت السياحية)
User instrument policy
 Smart technics to solve Netgear router problem.  Troubleshot of all kind of Netgear issue.  Round the clock Services.
GDPR Steering Group Dashboard June 2018
Best Social Media Marketing Company
Wrap-Up and Q&A: Prepare for a New Semester
Magnet, Support and Infrastructure
PANDA Cryostat and Yoke
For More Details:
Presentation transcript:

Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting

R. Guida PH-DT-DI2 Outlook  Update on schedule and project status  Design specification document  Source procurement document ready for purchase  Update on infrastructure  Update on users’ setups  Discussions/Update for the definitions of few points

R. Guida PH-DT-DI3 FINISHED: Result of market survey: list with 3 companies ONGOING: Meeting with users to discuss last details on November 14th ONGOING: AMS magnet removed, definite confirmation that all AMS stuff will be gone end of November ONGOING: Preparation of technical specification for Tender Project schedule and status