EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
LCWS2002 R. Frey1 Silicon/Tungsten ECal for the SD Detector M. Breidenbach, D. Freytag, G. Haller, M. Huffer, J.J Russell Stanford Linear Accelerator Center.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
KEK meeting – September 2006 J.-C. Brient (LLR) 1 Jean-Claude BRIENT LLR – Ecole Polytechnique LLR – Ecole Polytechnique CALICE status and Plans.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
ECAL EUDET MODULE progress & perspective EUDET annual meeting, oct, 18 st, Munich.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay on behalf of the CALICE and EUDET collaborations
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
Rutherford Appleton Laboratory Particle Physics Department G. Villani CALICE MAPS Siena October th Topical Seminar on Innovative Particle and.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Front-End electronics for Future Linear Collider calorimeters C. de La Taille IN2P3/LAL Orsay On behalf of the CALICE collaboration
Front-End electronics for Future Linear Collider W-Si calorimeter physics prototype B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Electronics for Si-W calorimeter LCWS06 Bangalore – March, 10 th Gérard Bohner, Pascal Gay, Jacques Lecoq Samuel Manen, Laurent Royer Michel Bouchel, Bernard.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Final CALICE OsC meeting: Status and summary of project
ECAL EUDET MODULE Summary talk
SiD Calorimeter R&D Collaboration
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Granular calorimeters Infrastructure
C. de La Taille IN2P3/LAL Orsay
Electronics for Si-W calorimeter
CALICE/EUDET Electronics in 2007
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Joint Research Activity 3: Calorimetry
prototype PCB for on detector chip integration
AIDA KICK OFF MEETING WP9
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006

EUDET : ECAL emodule Electromagnetic calorimeter Prototype of a (~ 1/6) module 0 : one line & one column 150 cm long, 12 cm wide 30 layers channels Test full scale mechanics + PCB Can go in test beam Test full integration + edge communications Similar in #channels as physics prototype ©M. Anduze (LLR)

EUDET meeting – J.C Brient 3 Mechanical R&D ( ) Long Type H structures : –Choice of radiator (W, alloys, Pb ?) –Design and fabrication of the long mould (adaptation of prototype mould) –Fabrication of validation model (1-3 samples) Half module EUDET : m long ; ≈ 500 Kg - real radiator sampling (2 or 3 thickness) –Design (mechanical simulations) of the module –Optimization of composite sheets : studies of main parameters (thickness, shape...) –Fastening system on HCAL : design and destructive tests too –Design and fabrication of the mould –Transport tools –Fabrication of the structure (end 2007) –Mechanical support for beam test in 2008

EUDET meeting – J.C Brient 4 The goal is ~ 4  Number of mask ~ 4 ~ 80% ??  Industrial yield ~ 80% ??  Use of large wafer 8” ? < 2 $/cm 2 DETECTORS MATRIX Relatively crude object when compared to a microstrip Matrix for a tracker A not exhaustive silicon R&D list ( largely not yet covered by enough people and institute) Granularity … as low as possible, pixels not larger than 5x5 mm² Wafers design with/o guard ring cost vs wafers size AC or not on the wafers (R,C) impact on cost Alternative approach MAPS for digital readout (UK) Assembling Connection with glue, aging of glue/wafers, study of alternative, etc… R&D for mass production all design of the delivery tests all design of the wafers calibration device

17 jan 2006C. de La Taille CALICE ECAL meeting 5 ECAL design progress Mechanical studies Support structure : composite alveolae Thermal studies Detector optimization : multiple constraints (physics performance, electronics, cooling, overall detector layout) 1 postdoc at CNRS/EP (Allister Levi-Sanchez) Silicon wafers : many issues to be studied Granularity AC/DC coupling Fabrication costs Mostly simulation and labour cost for 2006-mid 07

17 jan 2006C. de La Taille CALICE ECAL meeting 6 Developments by CNRS Ecole Polytechnique and Prague CNRS/EP : Mechanical studies of module Technical consulting : 28,5 k€ CNRS/EP : Silicon wafers for Eudet module Set of masks for production in korea : 10k€ Production of wafers in Brasil : 20 k€ IPASCR Prague : Silicon wafers for Eudet module Development of prototypes at ON Semiconductor Roznov Cost : 10.3 k€ Financial summary estimate by end 06 CNRS/EP 60k€ spent/ 9k€ requested IPASCR : 1Ok€ spent/ 6k€ requested

17 jan 2006C. de La Taille CALICE ECAL meeting 7 Front End Electronics Power Cycling Auto-trigger on ½ MIP Internal ADC Prototypes towards final front end ASICs integrated in detector test power cycling (ON 2ms OFF 200 ms) Test data handling

17 jan 2006C. de La Taille CALICE ECAL meeting 8 Front-End electronics (DESY, LAL, LPC, + LLR, LPSC) Complete readout ASIC with power cycling and integrated ADC ASIC for SiPMs and digital HAdronic calorimeter Elementary stitchable motherboards Data concentrator at module end Schedule ECAL and DHCAL ASIC prototypes : mid 06 Second ECAL prototype mid 07 AHCAL ASIC prototype : mid 07 Small productions to equip modules : mid 08 JRA3 FEE responsibilities and schedule

17 jan 2006C. de La Taille CALICE ECAL meeting 9 Developments in front-end electronics till sep 06 Definition of read-out scheme for 1.5m module Collaboration CNRS/UK : 1 postdoc at CNRS/EP (Clement Jauffrey) Minimize power dissipation : Token ring scheme EUDET note in preparation Implementation in DHCAL Eudet ASIC Chip submitted 11 sept 06 ! : CNRS/LAL 18k€ Prototype of readout boards to follow 1 postdoc to arrive at LAL in nov06 ECAL ASIC to follow in nov 06 CNRS/LAL : 18k€ Financial summary estimate end (or 36) k€ spent / 21 k requested

17 jan 2006C. de La Taille CALICE ECAL meeting 10 Backup slides

17 jan 2006C. de La Taille CALICE ECAL meeting 11 Milestones and Deliverables Not very detailed – but somewhat more rigid than we are used to test facilities DAQ systems Test facilities DAQ ASICS

17 jan 2006C. de La Taille CALICE ECAL meeting 12 Towards ECAL DAQ : data volume and rate Assuming TESLA like bunch structure Bunch crossing period within bunch train = 176ns ~ 200ns Number of crossings per bunch train = 4886 ~ 5000 Bunch train length = 860  s ~ 1ms Bunch train period =250ms ~ 200ms Raw Data volume 2 bytes Energy data/Channel, 20 Million channels Raw data per bunch train ~ 20M  5000  2 ~ 200GBytes ECAL No way to digitize inside the ~ ms train 10 kbytes/channel/train ~ 50 kbytes/ch/s Physics data rate : 90 Mbytes/train = ~20 bytes/ch/s Zero suppression mandatory 10 3 rate reduction -> drastic for power dissipation Digitize only signals over 1/2MIP with noise < MIP/10 Allow storage in front-end ASIC ~10 3