Page 1 Finished Goods Purchase Order Inquiry RLM System.

Slides:



Advertisements
Similar presentations
Page 1 Cost Entry for Owned (Related) Factories By MIS Department.
Advertisements

Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
New RF Gun Login By MIS Department. What is the New RF Gun Login? The RLM System has the ability to have multiple companies, each of which has its own.
CARTONIZE CUT & PRINT BOX END LABELS RLM System. Page 2 Glossary of Training Terms The following terms will be used throughout this training program:
Page 1 Inter-Company Cash Application By MIS Department.
Page 1 Pay Inter-Company Vouchers by Hand Check By MIS Department.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (In Transits) are posted to the system to apprise the.
Page 1 Accounts Payable Voucher Entry By MIS Department.
Work Orders Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
Creating and Submitting Orders Remy Order Management System.
Online Ordering System
Page 1 Manual Finished Goods Receiving By MIS Department.
FAMIS TRAINING The Basics. Basic FAMIS Training (Logging on & off, & basic screens.)  Before beginning this training you must request your user id and.
Page 1 Reprint Invoice By MIS Department. Page 2 When to use Reprint Invoice The Reprint Invoice function can be used to re- create invoices that have.
Call Log Database by Jay Schwausch Call Log Database by Jay Schwausch.
How to use a scanner Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic.
Purchasing Goods and Services. Overview In this session you will learn how to utilize the eProcurement Module to create requisitions for purchasing goods.
Page 1 EDI Drop Ship Packing By MIS Department. Page 2 EDI Drop Ship Flowchart Factory Produces Units from FGPO Scan cartons to (virtual) container Add.
1 Modified_ CIRCUIT PROTECTION SOLUTIONS Confidential and Proprietary to Littelfuse, Inc. ® Littelfuse, Inc All rights reserved. February,
Web Purchasing Demo Version Web Purchasing Demo WELCOME Presenter.
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
Page 1 Returns Receivings By MIS Department. Page 2 The Returns Process When a store or customer wants to return goods, they are supposed to contact the.
Page 1 Cost Approval RLM System. Page 2 Costing of Finished Goods Purchase Orders Finished Goods Purchase Orders (FGPOs) are the orders Jordache places.
Page 1 Packing Open Stock for UCC128 By MIS Department.
Washington Campus Compact New Time Log Database Note to users: You should use Internet Explorer to use this database. In other programs (i.e. Firefox)
UPC CROSS-REFERENCE SETUP FOR FACTORIES RLM System.
Page 1 Customer UPC Cross-Reference RLM System. Page 2 Customer UPC Cross-Reference Customers (i.e., stores who purchase our goods) often have their own.
Cost Entry by MG for Directions Studio Cypress Creek System.
Page 1 Daily Receiving Inquiry By MIS Department.
Shipment / Container Tracking Inquiry By MIS Department.
Invoice Pick Entry - Menu Location Use this function to invoice orders from your location shipped via UPS.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
The link to the Custom Point Login is:
RLM System Actual Cut Entry. Page 2 Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
Page 1 Billing Drop Shipments RLM System. Page 2 Drop Ship Billing Drop Ship billing is very similar to Outside Contractor Billing, except that billing.
ARMS Advanced Risk Management System User Documentation.
Page 1 Cash Application By MIS Department. Page 2 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will.
PRINT BOX END LABELS FOR ODDS (LEFTOVERS) RLM System.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (“In Transits”) are posted to the system to apprise the.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Finished Goods Purchase Order Entry RLM System. Finished Goods Purchase Orders FGPOs are the orders Jordache places to the factories that produce the.
Page 1 Manual Finished Goods Receiving By MIS Department.
Outside Contractor Billing Ron Lynn Management System.
Contract Invoice Guide
Cost Entry for Non-Owned Factories By MIS Department.
Cost Entry for Non-Owned Factories Cypress Creek System.
Page 1 UPC (Universal Product Code) Inquiry By MIS Department.
Prepared by CMSD Office of the Chief Financial Officer - October, OnBase E-Procure - Purchase Order Entry, Update Unapproved Purchase Order and.
Page 1 Global Sourcing By MIS Department. Page 2 What is Global Sourcing? The Global Sourcing application allows you to see the production in units and.
Order Inquiry by Style RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using.
Page 1 Cash Application By MIS Department. Page 2 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will.
Complete Ordering System for Promotional Literature and Samples Quick Reference and Training Guide.
Order Inquiry RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using the Order.
Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Child Care Subsidy Program Online Billing Provider Training Spring 2016.
Domestic Cost Entry and Approval RLM System. Costing of Finished Goods Purchase Orders Domestic FGPOs are orders Directions placed directly to the factories.
Page 1 GAP Force Pick Ticket By MIS Department. Page 2 Forcing Pick Tickets The Gap process requires that pick tickets be created before the goods are.
Order Inquiry by Entry Date RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed.
Page 1 One-Line Costing By MIS Department. Page 2 One-line Cost Sheet for Style In the event that styles in stock are transferred from PPK to Open Stock.
Page 1 GAP Container Loading By MIS Department. Page 2 Gap Distribution Center Process The Factory does not ship the units to the Distribution Center.
Module 3 – Create a Non-Catalog Requisition
Reviewing Parts Orders
PO INVOICE ENTRY Creating a PO Invoice Let’s Get Started
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
Requisition Entry Guide
Fantastic Graphics Inc. 2017
Creating a Requisition in Atrieve Web
Presentation transcript:

Page 1 Finished Goods Purchase Order Inquiry RLM System

Page 2 Finished Goods Purchase Orders FGPOs are the orders Jordache places to the factories that produce the garments FGPOs to all Factories are entered by Jordache NY Because accessing an FGPO requires a balance action, most of the time using the Inquiry to see FGPO information is preferable NOTE: Some of the following slides will have different screen colors (browns and blues), but the screens you will see will all have the blue colors. (Skip to Main Menu)Skip to Main Menu

Page 3 Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the screen into which you enter information –Value: The information (data) being entered in the field. Example: Division number, FGPO number –Icon: An image you may click to perform a function such as select, submit or exit –(Single-)Click: Also “Select.” Hitting the left mouse button once. This will activate an icon or select a row in a list of values –Double-click: Hitting the left mouse button twice o the same part of the screen. Used only to select and return a value from a list.

Page 4 Using the RLM System These are the primary RLM icons you will use: – Search: Located next to entry fields. Clicking this icon brings up a pop-up window with a list of all possible values for the field (for example, the next to the Division field will show a list of all divisions) (Shift-F9 keys or F21 key) – Select: Located on the Search pop-up windows. You may click on a line and click Select to return its value to the main screen – OK (Submit): Located in the bottom right corner of each screen. Processes the information on screen and brings you to the next screen – Return (Back): Located at the top of each screen. Click this icon to go back one screen (F2 key) – Exit: Located at the top of each screen. Click this icon to return to the menu or close a pop-up (F3 key)

Page 5 Enter your User ID and Password here Note: User ID and Password are assigned by MIS. The password field IS case-sensitive. Sign On

Page 6 Click the check (or hit the Enter key) to proceed Welcome

Page 7 Enter the Company Number If you don’t enter a Company or enter the wrong number, you will receive this error: Click OK Select Application Enter the application number for the menu or click the correct button in the menu at left Enter the application number for the PO menu or click the correct button in the menu at left

Page 8 Click “Inquiries” FGPO Menu Note: FGPO inquiry may also be found on the Production Inquiry Menu, option 1

Page 9 Click “Purchase Order Inquiry” FGPO Inquiries Menu

Page 10 Enter the User PO # here To Select a User PO # click this icon: Select by User PO Number Double-Click the User PO, enter the number or click the line and click There are two ways to find FGPOs: by User PO Number (this screen) and by Style (next screen)next screen Click OK

Page 11 Click “Select PO by Item #” to search by style Select FGPO by Style (Item) Number If you searched by User PO #, skip to Enter Security IDEnter Security ID

Page 12 Search for FGPO by Style Enter the division number (use to select) Enter the Season and Year (use to select)

Page 13 Search for FGPO by Style (continued) Double-click a Style to select it, or single-click and hit the button Enter the Style, FabWsh and Color (use to select)

Page 14 FGPO by Style – Inseam/Prepack (optional) Optional: Enter the Inseam or Prepack code. Click to search from a list of valid codes for the style Click OK

Page 15 List FGPOs for Selected Style If the style is on FGPOs they will be listed on this screen Double-click a line to view the FGPO If there are multiple Inseams/Prepacks on the list you may enter an Inseam or PPK to filter out the rest Click OK

Page 16 Program Security Enter the security ID assigned to you by MIS (usually your initials) Note: If you do not have a security ID or it does not work, please contact MIS. Click OK

Page 17 FGPO Header The FGPO header screen has a few sections: Division, Plant, Vendor, Maker, Ship. Mode, PO Type Dates and Quality Units (Ordered, Shipped, Received), Cost Special Instructions, Other

Page 18 FGPO Header Click OK to view details by style details by style To print OPAs click this button (cost must be approved)print OPAs If the cost has been approved it will be noted here

Page 19 Print OPA and PCCR You may change the number of copies of each document that will print Click the printer icon to submit

Page 20 FGPO Details: Additional Information Click “Toggle Details” to see more information (Season, Inseam description, Warehouse, Cost)

Page 21 FGPO Details For more options right- click on a line Select “Review Line” to view details (such as size breakdown for 00As) view details Select “Review Costs” to view the cost sheetcost sheet

Page 22 Review Detail Line ETDETA Notice Ordered (PO qty) vs. Shipped vs. Received. Blank means not yet done in RLM

Page 23 Review Cost Sheet Click the Print button to send this cost sheet to your outq (printer)

Page 24 Additional Inquiries Shipment Inquiry (F6) Receiving Inquiry (F7) Note: PO Completed

Page 25 Shipment Inquiry (from F6) Select “Detail Shipment Inquiry” to view the shipment details Right click on a line Once a line of the PO has been shipped, the shipment and any balance for the line are visible by pressing F6. Unshipped lines do NOT appear. The “Balance Qty” column for each shipment is not cumulative. It is what is left on the PO, regardless of whether the quantity was shipped on another shipment.

Page 26 Detail Shipment Inquiry Click Return to go back This screen shows all the shipment information (warehouse, dates, comments) in the top two sections FGPO details for the shipment are in the bottom two sections (container, style, quantities by size)

Page 27 Received Inquiry (from F7) Receivings by date appear here (from F7 on PO inquiry) Click ”Details” to view by size (00A only)

Page 28 NOTE: PO Completed If the note “THIS P/O IS COMPLETED” appears it means that in transit or WIP will no longer be shown for this PO It is the responsibility of the Production Coordinators to determine when no more of a PO will be shipped and to inform PO Entry to complete that PO. complete that PO