2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.

Slides:



Advertisements
Similar presentations
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Advertisements

SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
WG on Determination of Fluid Loss Screen Life API SC 10 Scott Jennings 25 June, Exploration and Production Standards Conference on Oilfield Equipment.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
GE Oil & Gas Drilling & Production API SUBCOMMITTEE 6 WORK GROUP ON API SPEC 6A May 2009 Westminster, Colorado.
Subcommittee On Pressure Relief Systems API CRE Update Clark Shepard Spring 2010.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
San Francisco, CA. SC8 Liaison Report
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
API SC 10, Work Group 3 Update:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
2017 Exploration & Production Winter Standards Meeting
Pine cove pit time lapse drone photos
Potential Milestones A timeline to finish in one year
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
doc.: IEEE <doc#>
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
TGaf San Francisco Closing Report
doc.: IEEE <doc#>
HMC-4 Meeting 15th May 2018 London
2016 Exploration & Production Summer Standards Conference
Specification on float equipment
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API SC 10 WG15 Stage Cementing Collars
Review plan of the nature reporting – update 6
Float Equipment API Spec 10F
CSOEM Materials Advisory Resource Group
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2015 January February March April May June July August September
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA

Subcommittee on Oil Well Cements (SC10)  Publication of API Specification 10A “Cements and Materials for Well Cementing” 24 th Edition, December 2010, is up for reaffirmation in December Auditor findings and comments are being logged, reviewed and discussed. “Special Work Session” on Thursday, June 25 th, 2015 Revision may include changes to Consistometer oil specification and a new specification on “Well Cementing Composites.”  Publication of API RP 10B-2 “Testing Well Cements” Publication of RP 10B-2, 2 nd Edition April Comments are being logged, reviewed and discussed with set path forward after “Special Work Session” on Thursday, June 25 th, 2015 Future revisions to include: Stirred Fluid Loss Testing, Fluid Loss Screens and elimination of inconsistencies between API Spec 10A and RP 10B-2 New WG was formed to revise/rewrite Sections 10, 11 & 12, specifically with regards to atmospheric vs HTHP slurry conditioning requirements.

 Rewrite of API RP 10B-3 “Testing of Deepwater Well Cement Formulations” 1 st Edition July 2004 Additional comments being resolved after its post-ballot and comment resolution.  Rewrite of API RP 10B-4 “Preparation and Testing of Foamed Cement Slurries at Atmospheric Pressure”, 1 st Edition July 2004 Going through internal clearance at API for publishing Technical Report (TR) on Foam Cement Behavior under Well Conditions is the second phase of this WG charge. Work progressing. Subcommittee on Oil Well Cements (SC10)

 API RP 10B-5, 1st Edition, “Determination of Shrinkage and Expansion of Well Cement Formulations at Atmospheric Pressure”, April 2005 Document reaffirmed in April  API RP 10B-6, 1st Edition, “Determining the Static Gel Strength of Cement Formulations”, August 2010 Document reaffirmed in April Document revision is underway by Work Group. Subcommittee on Oil Well Cements (SC10)

 Rewrite of API Spec 10D, 6 th Edition March 2002 “Bow Spring Casing Centralizers” Document reaffirmed April Review and update API Spec 10D to include performance testing requirements for centralizers that are to be used in applications where they are run through restrictions that are smaller than the hole size in which they are to be set.  API RP 10D-2, 1st Edition, “Recommended Practice for Centralizer Placement and Stop Collar Testing”, August 2004 Document reaffirmed in April  Rewrite of API RP 10F, 3 rd Edition April 2002 “Performance Testing of Cementing Float Equipment” WG will publish API Specification 10F, 1st Edition which will replace and make obsolete API RP 10F, 3th Edition. This document will include required specifications and the associated performance testing protocols for the manufacturing of Cement Float Equipment

 TR on “Mechanical Cementing Plugs used in Tubing, Casing and Drill Pipe” Final edit check with SC10 Publications Task Group and Formatting by API is in final stage. Expected publication Q as API 10TR6.  TR on “Mechanical Behavior of Cement” Document has been balloted. Ballot results and comments have been forwarded for resolution. Subcommittee on Oil Well Cements (SC10)

 API RP 65, 1st Edition, “Cementing Shallow Water Flow Zones in Deepwater Wells”, September 2002 Reaffirmed 2012, currently being revised by Work Group. Expected publishing date Q1, 2016 as API RP  API Standard 65-2, 2nd Edition, “Isolating Potential Flow Zones During Well Construction”, December 2010 Expected reaffirmation in December Subcommittee on Oil Well Cements (SC10)

 API Bulletin E3, 1st Edition, Environmental Guidance Document: “Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations”, January 1993 Reaffirmed 2000, the document will be revised and used as the basis for the newly formed Work Group on Well Abandonment. Subcommittee on Oil Well Cements (SC10)