Presentation is loading. Please wait.

Presentation is loading. Please wait.

SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.

Similar presentations


Presentation on theme: "SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am."— Presentation transcript:

1 SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am

2 TG 2 CHARGES Call to order and roll call TG charges June 2010 minutes June 2010 action items Status of standards Old business New business Next meeting and adjourne

3 TG2 MEMBERS / ROLE CALL Cheryl Stark – Chair Jim Berger Ryen Caeen David Ekas Stephen Polnaszek Paul Scott Johnna Smith Tim Wilkin Farewell and thanks – Del Son Welcome – Bernard Fraboulet

4 June 2010 Action Items Include comments to DIS vote for RP 13B-2 6 th ed. / ISO 10414-2. Forward for FDIS ballot. API will publish based on DIS. Publish ISO 13500, Amendment 1 following FDAM ballot Get 13C 3 rd ed. / 13501 printed Prepare DIS 13J/13503-3 with PCT? Complete RP 13K for ballot Encourage work on RP 13L Notify API of Mark Morgan departure

5 TG2 CHARGES Assist TGs and WGs in technical and editorial work on documents for publication Format the document to a publishable format Prepare all drawings in a publishable format Include CAS numbers, equations, and proper use of shall, should and may

6 TG2 CHARGES (CONT) Maintains a list of standards and publication status TG or WG chair is responsible for technical content and contacting TG2 when assistance is needed API TG2 assists ISO SC3/WG1 in preparing NWIs and documents for ISO Central Secretariat

7 REPORT – SPEC 13A/ISO 13500 API published 18 th edition – Feb 2010 including Clause 20 (Barite 4,10) ISO 13500 published Nov 08 – did not include Barite 4,10 ISO AM1 Barite 4,10:2010

8 API SPEC 13A API Monogram Program requested Spec 13A be color-coded for audit purposes Completed and reviewed by M-I, BHI, Newpark and Halliburton, Questions for Auditors constructed Work completed for API

9 REPORT RP 13B-1/ISO 10414-1 API RPP 13B-1 published Mar 09 ISO 10414-1 published in 2008 No work done on Annexes I and J – PPT – waiting on WG to submit new text NWI must be prepared for API and ISO to include PPT in Annexes I (and J deleted), as an Amendment (ceramic disks, procedure)

10 REPORT RP 13B-2 / ISO 10414-2 ISO FDIS accepted by ISO CS – Nov 10 Stage 50.00 Reworked with new equations (33), (34) and (35) of dual salt calculations (THANKS – PAUL SCOTT) ISO FDIS vote Feb 2011 (50.20) API will print following ISO vote NWI must be prepared for API and ISO to include PPT in Annexes K (and L deleted), as an Amendment (procedure)

11 REPORT RP 13C / ISO 13501 ISO NWI and DIS approved Accepted by ISO CS for FDIS – Nov 10 FDIS ballot (50.20) – March 2011 API will published following completion of FDIS ballot

12 REPORT RP 13D Published May 2010 P. Bern pointed out errors in equations (46) and (47) Mario Zamora has submitted several pages of corrections – need decision as how to proceed as not all are editorial

13 REPORT RP 13I / ISO 10416 API RP 13I, 8 th edition, published Mar 09 ISO published 2008 No work done on Clauses 27 and 28 – PPT – waiting on WG to submit new text NWI must be prepared for API and ISO to include PPT in Clauses 27 (and 28 deleted), as an Amendment (ceramic disks, procedure)

14 REPORT RP 13J / ISO 13503-3 Accepted for NWI ballot by ISO CS DIS stage (40.00) Ballot is out in some countries, should be in USA shortly Addition buffer capacity and corrosion included

15 REPORT RP 13K Approved by TG8 Submitted to SC13 for vote API Publications is editing and document should be available in Feb 2011

16 REPORT RP 13L Reaffirmed in Sep 2010 Publication date remains 02/03, edition 1 D. Ekas is reviewing need for additions or deletions

17 REPORT RP 13M / ISO 13503-1 RP 13M, edition 4, published 07/04 Time for three-year review Mahmoud Asadi will report during SC13 meetings this week Need to change API numbering to reflect this is part of series 13M-xxx (this will be API RP 13M-1)

18 REPORT RP 13M-4 / ISO 13503-4 API 1 st edition, published 12/06 ISO 1 st edition, published in 2006 Time for three-year review

19 NUMBERTITLEAPIISO 13A 13500 Drilling Fluid Materials P&ngi – Drilling fluid materials – Specification and tests 2010Nov 1, 2008 AM:2010 13B-1 10414-1 Recommended Practice for Field Testing of Water-based Drilling Fluids P&ngi – Field testing of drilling fluids – Part 1: Water-based fluids Mar 09March 08 13B-2 10414-2 Recommended Practice for Field Testing of Oil-based Drilling Fluids P&ngi – Field testing of drilling fluids – Part 2: Oil-based fluids (API 13B-2 is not an ISO adoption) Mar 05 Reaff: Oct 10 50.00 – Nov 10 50.20 – Dec 10 IS – May 11 ? 13C 13501 Drilling Fluids Processing Systems Evaluation P&ngi – Drilling fluids – Processing systems evaluation Apr 05 Reaff: Dec 10 50.00-Nov 10 50.20 – Feb 11 ? IS – Jun 11 ? 13DRheology and Hydraulics of Oil-well Drilling FluidsMay 10 13I 10416 Recommended Practice Standard Procedure for Laboratory Testing Drilling Fluids P&ngi – Drilling fluids – Laboratory testing Mar 09Mar 08 13J 13503-3 Testing of Heavy Brines P&ngi – Completion fluids and materials – Part 3: Testing of heavy brines May 062005 NWI – Oct 10 13KChemical Analysis of BariteNov 01 Reaff: Aug 06 Voted: Sep 10 13LRecommended Practice for Training and Qualification of Drilling Fluid TechnologistsFeb 03 Reaff: Oct 10 13M-1 13503-1 Recommended Practice for the Measurement of Viscous Properties of Completion Fluids P&ngi – Completion fluids and materials – Part 1:Measurement of viscous properties of completion fluids (Cover is 13M not 13M-1, we can change this at the next printing) Jul 04 Reaff: Oct 10 2003 13M-4 13503-4 Recommended Practice for Measuring Stimulation and Gravel-pack Fluid Leakoff Under Static Conditions P&ngi – Completion fluids and materials – Part 4: Measuring stimulation and gravel-pack fluid leakoff under static conditions Dec 20062006 15 Jan 2011

20 Old Business Combining 13B-1, 13B-2, and 13I into single document – Paul S., Jim B., and Marvin P. will address prior to Jan 2011 New Business M. Zamora’s comments to RP 13D K. Morton procedure for HTHP viscometer L. Mitchell PPT procedure for three standards

21 Next Scheduled Meeting TG does not meet, all work done electronically Next report to SC13 – June 2011 Report is for information only San Francisco – Grand Hyatt


Download ppt "SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am."

Similar presentations


Ads by Google