HINS 6-Cavity Test 3 Month Plan Jan 12, 2012. Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Anders Sunesson RF Group ESS Accelerator Division
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Report Technical Director Storage-Ring-Installation Completed
Report Technical Director Storage-Ring-Installation Completed
Experience with beam instrumentation at Linac4
CLEX* Status and Plans CTF3 complex CLEX
352MHz Klystron Control for the 3MeV Linac test stand
LINAC4 commissioning plans etc.
Upgraded Injector Test Facility
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Advanced Research Electron Accelerator Laboratory
J. Seeman Assistant Director for PPA/LCLS
Linac/BC1 Commissioning P
commissioning and measurements
A. Freyberg Aug 2016 ECT’16 =>
Injector / Linac Installation Current Status
Upgraded Injector Test Facility
UITF Conduct of Operations Review
Presentation transcript:

HINS 6-Cavity Test 3 Month Plan Jan 12, 2012

Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall slits and fast Faraday cup. Shutdown for H- upgrade scheduled to start Feb 6 (Monday). Estimate 3-4 weeks to finish all upgrade mechanical work. Lab shutdown still scheduled to start March 1. Main injector quads may be reclaimed at the end of March. New klystron scheduled to arrive in early spring.

BPM Upgrade Shutdown Install buttons on all blanked off BPM ports. Replace cavity wire scanner with a BPM. Install new can for slit scanner and fast Faraday cup. New BPM Location New can Location

Pre-upgrade Studies Perform cavity phase scans using new BPM. Tune cavities to specified amplitude and phases, and measure beam emittance using quadrupoles and slits. Document final settings before H- shutdown.

5 More realistic (?) schedule  Feb 1 st, H - source to alignment  Depends on how much time needed for alignment  Simply need to be early enough  Feb 3 rd, last H + run  Feb 6 th, start removing H + source  Mostly electrical first (cables and such), then mechanical (source and stand out)  Feb 16 th, new stand installed  Feb 24 th, H- source installed  Includes vacuum connected (may be not pumped down)  Includes all electrical connections  Feb 27 th, alignment  Feb 28 th, start commissioning  HV => Plasma => Beam 3 weeks

Other HINS Shutdown Activities Waveguide distribution from klystron to test area will be removed. Klystron will only power beam line. Modify klystron interlocks, to remove monitoring of RF test areas. Complete documentation necessary for remote operation of facility. LLRF work on vector modulator feed-forward.

H- Startup Will start (hopefully) sometime in early March, contingent upon good vacuum, working power supplies, controls, and safety approval. May need a week to optimize LEBT for best RFQ transmission. Retune cavities for transmission to diagnostic line. Measure emittance of new beam with slit scanner.

Loss of MI Quadrupoles NOVA project will want the spare MI quads when they are ready to construct magnet girders. Present commitment date is end of March. This will render diagnostic line and Buncher 2 useless, but RF work and beam through Cavity 4 can continue. These quads go away.

Other Items During AD Shutdown Complete 6-cavity test with vector modulator controls. New klystron due to arrive in spring. Current plan is to swap out klystrons (will this require mech. support?). Complete beam line design for 2.1MeV chopper test.