PIP Update June 25 th 2014. Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:

Similar presentations


Presentation on theme: "PIP Update June 25 th 2014. Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:"— Presentation transcript:

1 PIP Update June 25 th 2014

2 Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan: Perpendicular Cavity Update

3 Update – Linac SBK: Working towards CDR (in June, July) – Linac LN: Working with PriTel on a solution – Linac Modulator: Build up of 25 cell – (still communicating with SLAC – finishing up some details) – Linac Beam Physics: No news – Injector: Planning on installing dimpled cathode on source A this week for testing – Booster Beam: Cogging software work continues – low intensity studies continue Booster optics software – New tune control works – still working on ACNET software/control Booster Longitudinal dampers - Did some transfer studies/ Still working on firmware – Booster RF Booster RF5 has had downstream window cut off – new ceramic window may be put on toady Perpendicular Cavities – talk today RF13 being prepared for testing ( alignment fixtures being installed today) by weekend should be running (Install in mid-July) Cavity 20 – on mill Booster Anode Supplies – update talk today Booster Bias supplies – Third supply delivered to MI-60 and starting dis-assembly work (Monday), Bias 1 in test stand, Bias 2 waiting TS – Booster Shielding – Safety Going over data…. – Booster BPM work – talk today – Booster Absorber/Kicker – Pulsing continues in gallery with three loads, short kickers being built Design of insert sleeve is under investigation, New offset S12 bellows being designed

4 Cavities Refurbishment – 10 of 19 cavities have been refurbished Cavity RF 2 being prepared for testing Cavity RF 5 ready for new window - today RF 5 removed for repair Estimated Install date

5 Recent PIP Budget/News Budget Issues: – Budget meeting today with Ann Nestander General: P5 report out – PIP II is still the plan – Meetings to discuss transition PIP to PIP II underway PMG – Next Tuesday Lots of shutdown talk – No word Update of RLS – Some Booster items remain Post-Doc position for PIP – Preparing visit

6 Upcoming Talks Future Meetings to be Scheduled: Matt/John – New Tuner Kiyomi Seiya - Cogging Tom Kubicki – New Booster Cavity Plan Bill Pellico - Loss Scans and Shielding Assessment John Reid - Solid State Installation - Final Report