Presentation is loading. Please wait.

Presentation is loading. Please wait.

PIP Update Feb 20 th 2013. Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:

Similar presentations


Presentation on theme: "PIP Update Feb 20 th 2013. Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:"— Presentation transcript:

1 PIP Update Feb 20 th 2013

2 Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks: Salah Chaurize - Booster Notcher Installation Ken Domann – RLS/Updates Kiyomi Seiya – Aperture scans & magnet moves

3 Update General Info – Booster SS: Up and operating SS Spares still in production – waiting for ANU to finish using anode supply – Booster Absorber (Talk Today – for sure this time) – Booster Aperture Scans and magnet moves (Kiyomi Talk) – Booster RF cavity rework – Cavity 3 being installed today and RF15 removal – Cavity 1 work - tuner work has begun (two tuners off – no surprises) – Booster Ferrites – Dennis has started physical measurements (tester back) Physical Measurements, Low Power Testing, High Power Testing (Pat S. will help) – RFQ – Running (still sparking) – waiting on trim magnet/building source B Modifications to source magnetics, Changed Buncher tube (8kw) – HLRF –mostly still waiting (putting together new PR) soon will place order – Linac Modulator – work continues – No news? – Linac Notch - Safety permission to operate seed source and fiber amplifiers preliminary work on beam shaping optics – Cogging – Software work continues – but waiting for Kiyomi time – Booster Shielding –detectors placed, connected to VME, Scans on Thursday! – Booster Cavity modeling – Mohamed is using new ferrite curves – MI Startup: Word is May – not sure why not official yet? Startup comments (Fernanda, Todd, Mary) Studies forthcoming?

4 RFQ Injector Changed sources (added magnets) sparking Bucher power up to 8kw LINAC 7835 replacement for 5 today Retuning Linac – to match Injector BOOSTER Disconnect corrector leads at L24 Install re-furbished cavity that was originally removed from L15 (a.k.a. BRF3) Align L24 long straight, all elements Repair several BLMs in MI8 line not showing losses, document locations LM802A,LM803B,LM803C,LM803D,LM804 Repair MW804 Hose replacement for V803 ps Investigate IP13-1 on half ion pump Replace VB21 VV HTQ4 replace regulator PG20 and PG21 replace penning gauges Building 3 rd Notcher Preparing Transverse Pickup for installation Insatall RF3

5 Proton Improvement Plan Projection NOvA Shutdown g-2 Mu2e 8 GeV 120 GeV LBNE

6 Upcoming Talks Future Meetings: Feb/Mar Dave Augustine - Vacuum Installations Finished and in Planning Jean-Paul Carneiro - TraceWin 3D Simulations of the Fermilab Linac Dave Johnson - Progress with Linac Notcher Amplifiers Elliot McCrory - Linac BPM Upgrades Pellico – Shielding Testing John Reid - Solid State Installation - Final Report Pat Sheahan - Tuner Bias Supplies Leonid Vorobiev - ORBIT Simulations on Booster Injection and Acceleration

7 Upcoming Reports (upcoming) – Update of PIP Design Report – Yearly update work PIP talks/Special Meetings Budget Issues – – Working to address cost of spares – Additional Overhead Cost – impact still being looked at - Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task


Download ppt "PIP Update Feb 20 th 2013. Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:"

Similar presentations


Ads by Google