Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
1 Welcome Safety Regulatory Function Handbook April 2006.
Advertisements

Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Reference Document Management 1 European Railway Agency (ERA) Cross-Acceptance Unit P. Mihm 17/11/2010.
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
EASA Verification Milen Dentchev ANS Standardisation Section Manager.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
The European Organisation for the Safety of Air Navigation LSSIP Year 2011 KOM LSSIP changes September 2011.
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 10d : Proposed Way Forward Associating EMAC.
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision CERTIFICATION PROCESS  Peter Stastny,
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision OVERVIEW OF THE SINGLE EUROPEAN SKY Roderick.
ANSP certification and designation Roles, responsibilities, processes Bogdan BRAGUTA June 2016.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision SAFETY ASPECTS SAFETY ASPECTS  Juan Vázquez,
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
Juan Vázquez Sanz EUROCONTROL SRU
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
PRESENTATION OF MONTENEGRO
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Aerodrome Certification Workshop
Presentation transcript:

Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR

ESSIP Plan 2013 / Objective SRC-RLMK2 Comprehensive Explanation Scope/Applicability:  Applicable to civil & military REG, incl. NSAs → only REG/ MIL SLoAs  Encompasses ANS plus the related ATFM and ASM functions (full ATM/ANS)  Applicable Areas: 4 States: AM, AZ, TR, UA

ESSIP Plan 2013 / Objective SRC-RLMK3 Comprehensive Explanation REG01: Assess existing applicable regulations against ESARRs & address the differences identified – see list of reference regulations & supporting material in ESSIP Plan – Edition 2013; For ALL EU States (EC regulations apply directly):  ESARR1 and 6 are fully transposed through (EU) 1034/2011 and (EC) 482/2008 respectively; But States may also have national IRs in place (references needed);  National regulations transposing Directives 2003/42/EC and 94/56/EC are sufficient to address the ESARR 2 areas covered in the 2 Directives;  (EU) 1033/2011 satisfactorily covers ESARRs 3 & 4 as regards providers of ATS/CNS primarily to GAT; ASM & ATFM, as well as the missing Risk Classification Scheme must be addressed through national regulations (CP to ask);  National regulations transposing Directive 2006/23/EC are sufficient to address ESARR 5 areas covered in that Directive; Those areas of Sections 5.1 and 5.2 not covered in the Directive should also be addressed through national regulations;  (EU) 1033/2011 satisfactorily covers a basic legislation for engineers & technical personnel undertaking operational safety related tasks; further national rules are necessary to cover at least Article 8 of (EC) 2096/2005 (Saf Reg of Eng & Tech Personnel) and Section of ESARR5. For ALL non-EU States (CH, NO, ECAA etc):  FP to provide list of relevant national regulations and their references

ESSIP Plan 2013 / Objective SRC-RLMK4 Comprehensive Explanation 2.REG02: Develop/publish regulation compliant with the amended ESARR1 (For ALL non-EU States LAs must give info on the relevant national law & regulation(s) transposing ESARR1, their references & language in which they are available) amended ESARR2 3.REG03: Develop/publish regulation compliant with the amended ESARR2 (For all States, LAs to address references of new or modified regulations) 4.REG04: Develop/publish regulation compliant with ESARR3 (LAs to address evidences ref. application to ASM, ATFM) 4.REG05: Develop/publish regulation compliant with ESARR4 (LAs to address evidences ref. application to ASM, ATFM and ref. Risk Classification Scheme applied) 5.REG06: Develop/publish regulation compliant with ESARR5 for ATCOs 6.REG07: Develop/publish regulation compliant with ESARR5 for engineering & tech personnel undertaking ops safety-related tasks 7.REG08: Develop/publish regulation compliant with ESARR6; 8.REG09: Notify ICAO of any differences between applicable safety regulations & ICAO SARPs; LAs to address mapping between ICAO SARPs and applicable regulations transposing the ESARRs; and of formal notifications to ICAO

ESSIP Plan 2013 / Objective SRC-CHNG5 What is new or has changed since LSSIP 2012  Minor changes in ESSIP Plan Edition 2013 (only modification of the numbers of Regulations applicable)  No link with European ATM Master Plan

ESSIP Plan 2013 / Objective SRC-RLMK6 Supporting Material  All ESARRs and related Guidance Material  All applicable EC legislation transposing ESARRs in accordance with Article 4 of the Regulation No 550/2004

ESSIP Plan 2013 / Objective SRC-RLMK7 ESSIP Report 2012  Two out of fours States reported Objective SRC-RLMK as Completed.  The remaining two States reported delays in implementation caused mainly by partial implementation of ESARRs.  Since last year’s report there has been no progress in the implementation of this Objective.

ESSIP Plan 2013 / Objective SRC-RLMK8 Objective Coordinator’s Analysis, recommendations, tips & tricks  SRC-RLMK is about having the regulations & corresponding institutional arrangements in place, and NOT about if they are effectively implemented/ applied by the ATM/ANS providers;  CPs/FPs to be reminded that the completion of each SLoA is to be judged exclusively on the basis of promulgation of the relevant regulations and implementation of the necessary legal/institutional arrangements;  SRC-RLMK does not verify if the respective regulations are effectively implemented & applied at the level of the ANSPs (where applicable) or if there is corresponding oversight exercised by the NSA (that is done in the other 4 SRC objectives and in the SES Annual Report;  Request that REG/NSA specifies the legal references to the national implementing rules and other acts documenting their local arrangements which implement the ESARRs from the REG perspective.

ESSIP Plan 2013 / Objective SRC-CHNG9 Links and contacts  Objective Coordinator: Dybowska A.,  DSS Objective Expert(s): Deboeck, M.,