Presentation is loading. Please wait.

Presentation is loading. Please wait.

Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR 01.11.2015.

Similar presentations


Presentation on theme: "Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR 01.11.2015."— Presentation transcript:

1 Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR

2 ESSIP Plan 2015 / Objective ITY-ACID
Explanation What is new or has changed since previous ESSIP edition Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2014 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts ESSIP Plan 2015 / Objective ITY-ACID

3 ESSIP Plan 2015 / Objective ITY-ACID
Explanation Objective derived from the SES Regulation on Aircraft Identification (EU) 1206/2011 Only addressing the planning actions related to the implementation of the 2nd milestone of the Regulation ( ) 1st milestone ( ) is completely outside the scope of the ESSIP objective (it is dealt with by EASA through the SES Report) Discrete SSR codes are still expected to be used in the foreseeable future, by to a lesser extent ESSIP Plan 2015 / Objective ITY-ACID

4 What is new or has changed since previous ESSIP edition
None ESSIP Plan 2015 / Objective ITY-ACID

5 Link to European ATM Master Plan
Enabler GGSURV01. ESSIP Plan 2015 / Objective ITY-ACID

6 Most important SLoA(s)
ASP01 addressing the capability of the surveillance chain to handle the downlinked aircraft identification ESSIP Plan 2015 / Objective ITY-ACID

7 Finalisation Criteria and Closed Questions
The relevant systems allowing the establishment of individual aircraft identification using the downlinked aircraft identification have been put into service All concerned personnel has been trained No closed questions ESSIP Plan 2015 / Objective ITY-ACID

8 ESSIP Plan 2015 / Objective ITY-ACID
Supporting Material As specified in SLoAs detailed descriptions ESSIP Plan 2015 / Objective ITY-ACID

9 ESSIP Plan 2015 / Objective ITY-ACID
ESSIP Report 2014 It is important to note that some States which are outside the applicability area have reported implementation plans or even completion of the objective. ESSIP Plan 2015 / Objective ITY-ACID

10 Objective Coordinator’s Analysis, recommendations, tips & tricks
The objective if focussing on the 2020 milestone Compliance with the 2020 milestone may imply major upgrades of systems (e.g. surveillance and communication systems, SDPD, FDPD, HMI, etc) Compliance with the 2012 milestone is not covered by the ESSIP objective. It has to be reported to EASA ESSIP Plan 2015 / Objective ITY-ACID

11 ESSIP Plan 2015 / Objective ITY-ACID
Conclusions N/A ESSIP Plan 2015 / Objective ITY-ACID

12 ESSIP Plan 2015 / Objective ITY-ACID
Conclusions Objective Coordinator: Octavian CIOARA; Objective Owner: Andrew DESMOND-KENNEDY; Andrew. ESSIP Plan 2015 / Objective ITY-ACID


Download ppt "Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR 01.11.2015."

Similar presentations


Ads by Google