Presentation is loading. Please wait.

Presentation is loading. Please wait.

Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.

Similar presentations


Presentation on theme: "Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013."— Presentation transcript:

1 Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

2 Objective AOM20 ESSIP Plan 2013 / Overview LSSIP 20122 Comprehensive Explanation What is new or has changed since LSSIP 2012 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2012 Objective Coordinators Analysis, recommendations, tips & tricks Links and contacts

3 ESSIP Plan 2013 / Objective AOM 213 Comprehensive Explanation Area of applicability: All ECAC States except Armenia, Azerbaijan, Georgia Initial Operational Capability (IOC): 09/2013 Full Operational Capability (FOC): 12/2017 The objective will ensure the progressive deployment of free route airspace. It covers the Interim Deployment Programme part of the free route implementation Aligned with the European Route Network Improvement Plan (ERNIP) Part 1

4 What is new or has changed since LSSIP 2012 ESSIP Plan 2013 / Overview LSSIP 20124 Not the case. New objective.

5 Link to European ATM Master Plan ESSIP Plan 2013 / Overview LSSIP 20125 Objective AOM21 covers the following SESAR OI steps: OI step - [AOM-0401] - Multiple Route Options & Airspace Organisation Scenarios OI step - [AOM-0402] - Further Improvements to Route Network and Airspace incl. Cross-Border Sectorisation and Further Routeing Options

6 Most important SLoA(s) ESSIP Plan 2013 / Overview LSSIP 20126 AOM21-ASP02 - Implement system improvements (finalisation date 12/2017). AOM20-ASP03 – Implement procedures and processed in support of the local dimension (finalisation date 12/2017). Each SLoA should be fulfilled in accordance with the relevant provisions of the European Route Network Improvement Plan (ERNIP) Part 1

7 Finalisation Criteria and Closed Questions ESSIP Plan 2013 / Overview LSSIP 20127 Finalisation criteria: Contact your subject matter expert to determine the deployment Status for each SloA Closed questions: Closed Questions have been introduced for this Objective Statements on Deployment Status should provide answers to Closed Questions

8 ESSIP Report 2012 ESSIP Plan 2013 / Overview LSSIP 20128 Not the case. New objective.

9 Objective Coordinators Analysis, recommendations, tips & tricks ESSIP Plan 2013 / Overview LSSIP 20129 Ensure that your subject matter expert is involvement once you make your statement. Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material. Attention to the applicability to the Military stakeholders as airspace users (pilots and flight planning).

10 Links and contacts ESSIP Plan 2013 / Overview LSSIP 201210 Objective Coordinator: Octavian CIOARA +32 2 729 3282 octavian.cioara@eurocontrol.int NMD Objective Expert: RazvanBUCUROIU +32 2 729 3648 razvan.bucuroiu@eurocontrol.int


Download ppt "Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013."

Similar presentations


Ads by Google