Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR 06.10.2014.

Similar presentations


Presentation on theme: "Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR 06.10.2014."— Presentation transcript:

1 Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR 06.10.2014

2 ESSIP Plan 2014 / Objective ITY-ADQ2 Objective ITY-ADQ  Introduction  Explanation and scope  Link to European ATM Master Plan  Most important SLoA(s)  Finalisation Criteria and Closed Questions  Supporting Material  Implementation Support  Objective Coordinator’s Analysis & Conclusions  Links and contacts

3 Why an ITY – ADQ ESSIP objective? ESSIP Plan 2014 / Overview LSSIP 20143

4 Explanation and scope  ITY ADQ was derived from Regulation (EU) No 73/2010 of 26 January 2010 laying down requirements on the quality of aeronautical data and aeronautical information (Official Journal L23/6, dated 27.01.2010);  A new Regulation (EU) No 1029/2014 was approved in 26 September 2014 amending Regulation (EU) No 73/2010. Some definitions were clarified and changed (in accordance with the most recent amendment to ICAO Annex 15) but it has no impact in the content of the ESSIP objective.  The aim is to improve the quality of aeronautical data/information in terms of accuracy, resolution and integrity;  In accordance with [Article 2(3)] it applies up to the moment when the aeronautical data and/or aeronautical information are made available by the aeronautical information service provider to the next intended user. ESSIP Plan 2014 / Overview LSSIP 20144

5 Explanation and scope  It applies to EATMN systems, their constituents and associated procedures involved in the origination, production, storage, handling, processing, transfer and distribution of aeronautical data/information [Article 2(1)]  Following aeronautical products made available by Member States are included [Article 2(1)]:  Integrated Aeronautical Information Package (IAIP), with the exception of aeronautical information circulars;  Electronic obstacle and electronic terrain data or elements thereof;  Aerodrome mapping data. ESSIP Plan 2014 / Overview LSSIP 20145

6 Explanation and scope  In accordance with [Article 2(2)] it applies to:  ANSPs and AIS Providers;  Operators of those aerodromes and heliports for which IFR or Special-VFR procedures have been published in national aeronautical information publications;  Public or private entities providing:  Services for the origination and provision of survey data;  Procedure design services;  Electronic terrain data;  Electronic obstacle data. ESSIP Plan 2014 / Overview LSSIP 20146

7 ITY-ADQ ESSIP & IR 73/2010 ESSIP Plan 2014 / Overview LSSIP 20147 ADQ IR 73/2010 Chapter I General Provisions Chapter II Interoperability & Performance Chapter III Quality, Safety Security Req. Chapter IV Conformity & Additional Req. Chapter V Final Provisions Annexes Affected Parties Translated into ITY-ADQ ESSIP Key obligations Stakeholder Lines of Action What? Ensure Compliance… How? Supporting material Measurable finalisation criteria NSA ANSP/AISP APO Public & Private entities Implement data quality and process requirements Establish formal arrangements Establish consistency mechanisms and implement timeliness requirements Implement personnel performance requirements Implement common dataset digital exchange Implement a QMS fulfill safety & security objectives Implement all data requirements

8 Link to European ATM Master Plan ESSIP Plan 2014 / Overview LSSIP 20148 Improved Supply Chain for Aeronautical Data through Common Quality Measures IS 0202 Facilitated Aeronautical Data Exchanges through Digitalised Information IS 0204

9 SLoAs ESSIP Plan 2014 / Overview LSSIP 20149 Group necessary actions per Stakeholder Link them with IR Articles, Annexes and Timing Allocate obligations per Stakeholder group Decompose IR into main legal obligations ITY-ADQ

10 Most important SLoA(s)  ASP06 - Implement the common dataset and digital exchange format  ASP01 - Implement data quality and process requirements  APO04 - Implement the common dataset and digital exchange format requirements  APO01 - Implement data quality and process requirements  IND04 - Implement the common dataset and digital exchange format requirements  IND01 - Implement data quality and process requirements  REG01 - Verify the compliance with data quality requirements and supervise safety assessments ESSIP Plan 2014 / Overview LSSIP 201410

11 Finalisation criteria ESSIP Plan 2014 / Overview LSSIP 201411 Data quality requirements implemented and documented Certificates (QMS) issued by third parties Formal arrangements between parties EC Declarations & Technical file Safety assessment ITY-ADQ

12 Closed Questions/Finalisation Criteria  Closed questions included in the database are coming from the finalization criteria in the form of a direct question ESSIP Plan 2014 / Overview LSSIP 201412

13 Supporting Material ESSIP Plan 2014 / Overview LSSIP 201413 Non-Mandatory: EUROCONTROL Guidelines Non-Mandatory: Material i.e. ISO Standards Non-Mandatory: EUROCONTROL Specifications ITY-ADQ

14 IMPLEMENTATION SUPPORT  The EUROCONTROL ADQ Implementation Support Cell was set up to assist the States with the implementation of the Aeronautical Data and Information Quality (ADQ) implementing rule in the following keys areas:  Support to the establishment and provision of means of compliance;  Support to the implementation of the provisions of the implementing rule;  Support to the National Supervisory Authorities;  Support to the overall implementation and compliance monitoring process. Any question with regard to the ADQ IR can be addressed to the Implementation Support Cell at: adq@eurocontrol.intadq@eurocontrol.int or Tel: +32 2 729 9818 ESSIP Plan 2014 / Overview LSSIP 201414

15 Objective Coordinator’s Analysis & Conclusions ESSIP Plan 2014 / Overview LSSIP 201415 New objective based on a complicated regulation to address/solve a data quality problem Challenging for implementation due to the large spectrum of data/information May imply significant investments and/or adaptations of existing systems Involves a large group of stakeholders including industry/manufacturers Too much regulation and many administrative tasks (overregulation?) required

16 Links and contacts  Objective Coordinator: Frangolho A-P., +32 2 729 4702 ana-paula.frangolho@eurocontrol.int Alfaro Oscar, +32 2 729 4665 oscar.alfaro@eurocontrol.int  DSS Objective Expert(s):Unterreiner M., +32 2 729 3038 manfred.unterreiner@eurocontrol.intmanfred.unterreiner@eurocontrol.int  Implementation Support Cell:Tel: +32 2 729 9818 adq@eurocontrol.int ESSIP Plan 2014 / Overview LSSIP 201416