LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.

Similar presentations


Presentation on theme: "LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015."— Presentation transcript:

1 LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015

2 Objective AOP05 Comprehensive Explanation
Link to European ATM Master Plan Most important SLoA(s) Supporting Material ESSIP Report 2014 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts November 2015

3 Comprehensive Explanation
Implement Airport Collaborative Decision Making (CDM) This objective aims at implementing A-CDM to enhance the operational efficiency of airports and improve their integration into the Air Traffic Management Network (ATMN) while maintaining or improving the safety levels; The applicability area is presented in Table 8 of Part IV Annex B of the ESSIP 2012 document; Initial operational capability - 01/2004, Full operational capability - 01/2016 PCP Related November 2015

4 Link to European ATM Master Plan
[AO-0501]-Improved Operations in Adverse Conditions through Airport Collaborative Decision Making; [AO-0601]-Improved Turn-Round Process through Collaborative Decision Making; [AO-0602]-Collaborative Pre-departure Sequencing; [AO-0603]-Improved De-icing Operation through Collaborative Decision Making; Enablers: PRO-204a PRO-204b PRO-204c AIRPORT-31 PRO-213a PRO-213b PRO-214a PRO-073 November 2015

5 Most important SLoA(s)
APO01/ASP01/USE01- Define and agree performance objectives and KPIs at local level specific to airport operations in accordance with A-CDM Manual guidelines; APO02/ASP02/USE02 - Define and implement local airport operations procedures for information sharing through Letters of Agreement (LoAS) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines; APO03/ASP03/USE03 - Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines (baseline CDM); APO05 Define and implement the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between CFMU and the airport in accordance with A-CDM Manual guidelines; APO06/USE05 Define and implement procedures for CDM in adverse conditions including de-icing according to airport CDM Manual guidelines. November 2015

6 Supporting Material EUROCAE-ED-141-Minimum Technical Specifications for airport Collaborative Decision Making (Airport-CDM) Systems, dated October 2008; EUROCAE-ED-145-Airport-CDM Interface Specification, dated October 2008; EUROCAE-ED-146-Guidelines for Test and Validation Related to Airport CDM Interoperability, dated October 2008 Url: November 2015

7 Supporting Material EUROCONTROL-Airport CDM Functional Requirements Document, Edition 4.0, dated May 2009; EUROCONTROL-Airport CDM Implementation Manual, Edition 4,0, Dated Url : ETSI-EN , V Airport Collaborative Decision Making (A-CDM); Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004, dated , OJ 2010/C 168/04 Url : November 2015

8 ESSIP Report 2014 November 2015

9 Objective Coordinator’s Analysis, recommendations, tips & tricks
More elaborate explanation of chosen progress assessment is required. Objective aligned with Deployment Programme and PCP – postponed for 12 months November 2015

10 Links and contacts Objective Coordinator: Predrag Vranjkovic, Yi Xiong, DNM Objective Expert: Paul Adamson, November 2015