Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.

Slides:



Advertisements
Similar presentations
An Axtrusion Based Lathe
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Production Summary Tony Smith (Production Coordinator)
LHCb Velo Electronics PRR
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS EDR LIVERPOOL APRIL 05 Tony Smith.
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Mechanical/Thermal Measurements T. Bowcock, J. Carroll.
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Module Production T. Bowcock. Substrates Twist problem –Further understanding of the warp/weft and layup problem Chirality of the twist –Looks like it.
VELO Status at Liverpool T. Bowcock. Prototype Module(1) Mechanical Design Several different options Reduce complexity Dead reckoning.
LHCb Velo Construction Authorisation steps Tony Smith.
VELO Module Mid-Term Review T. Bowcock 11 October, 2006.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
SPACE PRODUCT ASSURANCE
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS- construction CONSTRUCTION of composite SUBSTRATE - many lay-ups tried – best flatness obtained.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
© Institute for International Research, Inc All rights reserved. Module 6: Manufacturing Throughput.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Sensor Testing Phil Turner. LHCb PRR - P. Turner Contents Reception Inspection Metrology Mounting Electrical tests Storage Changes since EDR Results Throughput.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
VELO Replacement Girish Patel University of Liverpool.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
S A Griffiths CM42 June 2015 Electrical & Control.
ATLAS pixel module assembly flow
Detector building Notes of our discussion
T. Bowcock University of Liverpool
UK RFD Pre-Series cryomodule
ATLAS ITK WP3 WP3 Bi-weekly meeting
Results from module testing
Presentation transcript:

Module Production T. Bowcock

News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components –Assembly Procedures –Quality Assurance –Burnin and Testing –Process Control –Towards production readiness

At time of EDR April 2005 –Received a pre-production batch of hybrids (K-04) laminated onto substrates Actually an additional run added for safety Stevenage had already produced hybrids to spec. –Metrology Twist in the hybrid Maintain close tolerances for the r.f. foil

Other known problems Pitch adaptors –Very low yield ~ 10% which would bring the assembly to its knees

EDR Issues with the twisted hybrids –Avenues to solve problem Find problem with last production and fix it Cold lamination Mechanical Constraint (if both others failed) Pitch adaptor yield * Cable Stress on Module

Twist post EDR Major part of programme to discover why the twist happened –Log books at Stevenage and Liverpool –Visit to examine handling

Twisted Substrates First difference was –The use of larger CF frame for ease of handling This introduced extra warp so was removed No such thing as a minor change. (no problem!) Processing repeated –Flatter but still not flat Stress relief –Single heating at 180 improved matters –Thermal cycling (ATLAS cycle ~-30 to ~ times over 3 days) to check stability –Additional problem with partial frame found (now fixed) that led to delamination

Flat Substrates Only other differences were –New TPG from Advanced Ceramics –New CF from original source Note this is heavily QC and is aerospace grade. TPG samples appeared identical CF had a subtle difference –The original CF was pre-preg and was at the tail end of its lifetime (1 year) –New CF was new i.e. at the beginning of its shelf life

Flat Substrates (May 2005) Process retuned for new material –Extended platen heating (1 hour to 2 hours) Much improved –Twist now at ~100 micron level Artificial ageing of CF –Partial polymerization? –Perfect floating substrates (3) –Best surface finish observed

Current Status Substrates Cold Lamination –Total in-house production including gluing circuits has produced perfectly flat hybrids Air not adequately removed from under circuit Fall back would require a little more R&D Normal production –Flatness of substrates solved(?) –New kits including frames sent to Stevenage –Lamination today

Pitch Adaptors Over last month over 100 PA tested Yield now ~ 90% –Needs to be > 80% for production purposes 5-6 PAs per day tested with a team of 6 trained physicists and engineers on a shift basis Order being placed with CERN for main production –40kCHF! We have enough for 10 prototype modules

Cable Stress Stiff kapton cables can exert substantial forces (and torques) on the module Movement critical to tolerances Issues of creep/long term tests

Cable Loading The VELO module design as reviwed at the EDR is distorts under cable pressure. The tip of the module, closest to the rf foil, will move by approximately 60 microns if a pushing force of about 1N is applied to each of the two cables one side of the module. If the cables are pulled away from the r.f. foil there is evidence for the paddle buckling under these force. This is not a recommended mode of operation.

Cable Stress Movements measured To date (one month) no evidence of creep Design for stress relief –Clamp to base Working in limited volume Fixed cable lengths with tolerances –Cable removal tool under design

Also since EDR Mechanics for sensor gluing assembly complete (complex) Major Laser Rig mechanics complete Design for handling and storage jig –Al Prototype made –Plastic lightweight version ordered Double sided bonding jig improved –3 new vacuum systems installed to improve suction on all equipment (high volume scroll pumps) external to clean room Stevenage agreed to glue PAs

Other issues K&S 8090 repair status –Final negotiation with K&S for coverage during period of production. (2) H&K710 now switched to LHCb production (backend bonding) Additional TPG ordered (no delay) Consultant at Micron –Good reports –Vacuum tests underway –Request for more 8 jigs (from Liverpool) to meet production needs. This could be a problem…emergency meeting called

Biggest remaining Issue IF twist is solved-hybrid at level we wish –Final paddle hybrid jig can be built – final design If hybrid is twisted microns then paddle production has to be modified slightly to allow for a face to be ground If hybrid is more twisted and fails stability tests then we have to use our addon constraint –Works(!) but requires different assembly jig In any scenario we are about 1 month away from being able to build this in.

Current Schedule If all goes well with todays production then we predict –5 prototype K-05 modules should be built by end of July –Start of production by 3 week August Additional delay of the twist ~ 2 months

News on Staff Torkjell Huse (Oslo) has joined Liverpool –Extensive experience from ATLAS modules

Production Readiness Pitch adaptor yield to be raised to above 80% Curvature of the hybrids to be reduced to <200 microns ( ) Pitch adaptor attachment to gluing to be proven by Stevenage Circuits or their sub-contractor Completion and programming of the Assembly robot to allow rapid alignment of the sensors to the hybrids Completion and programming of the Glue robot to allow rapid dispensing of structural adhesive Completion of ageing tests on the glue joint between paddle and hybrid Programming of backend bonding programmes on HK710 for K-05 Programming of frontend bonding progammes on KS-8090 for K-05 Design of the assembly jig for hybrid-paddle assembly Commissioning or extension of 2 DAQ systems (hybrid, laser, burnin). Completion of db for production QC and process control Commissioning of laser system Design and commission of burnin system

Process Being Finalized

Hybrid Assembly Produce list of db entries, how there are used etc. Welcome comments!

Summary Lots of work to do before PRR R&D phase complete and gearing up for poduction By the end of week should have final confirmation of twist problem Risks –Delivery of sensors –K&S 8090