V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March 9 2004 Electrical PP1 Basic features Electrical.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
April 05 Jason Tarrant CCLRC1 PRR of SCT off-detector cooling system l Cooling System »Design - Off-cylinder & On-cylinder »Installation – Off-cylinder.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
Electronics II Lab. Two Weeks. power connections Solderless Prototyping Board jacks for power connections.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Printed Circuit Board Design
Walls crates cables gas chambers electronics CERN adb.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
Michał Dwużnik, for the SCT collaboration
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
CLAS12 Drift Chamber Prototyping
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Mauro Citterio - Mi meeting
End-cap Mechanics FDR Overview of the Project
Basic Electronic Assembly and Test
Mechanics: (Tim).
Services Layout – Update
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Pierluigi Paolucci - I.N.F.N. Naples
ATL-IC-ES new version available - approval starts
Presentation transcript:

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical schematic Mechanical layout Prototyping Tests before production QC

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Basic features: Accept Low Mass Tape on the module side and type II cable on the power supply side. It provides pads for soldering of the low mass tapes to the printed circuit. Two connectors are used for one type II cable to minimize the space requirement It provides filtering of noise on the electrical lines Radiation hardness CO 2 environment Forward and barrel have different mechanical constraints. 2.5 mm rule (IPC spec) for 500 V on opened areas obeyed (pins on connectors will be pulled out)

Barrel schematic: control lines are AC coupled to the shield V cc, V dd and HV lines are AC coupled to their return lines DGND is DC connected to the shield AGND and HVGND are AC connected to the shield ILEDa and ILEDb lines are shorted

Forward schematic: Same as PPB1 except: DGND is AC connected to the shield ILEDb line on module side and Temp2 line on PS side are treated as a spare line V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March

Barrel PPB1 has 8 conductor layers and accepts 6 modules

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Forward PPF1 has 4 conductor layers and has 2 and 3 module versions. On discs 1- 8

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Forward PPF1 on disc 9: There should be a drawing with just two modules

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Prototyping: Prototypes of PPB1 have been used in the system test before production, noise performance of system was measured Prototype harnesses have been assembled and tested with PPB1 Electrical prototypes of PPF1 have been used in the system test Thermode soldering of tapes has been developed at RAL on protypes, procedure improved with hot plate soldering at Taiwan during production → less cold solder joints

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Tests before production Radiation hardness was checked up to 10 MRad (resistances, capacitances measured) – no change of C and leakage currents was measured Accelerated aging at 100 o C in CO 2 was checked Duration of aging: 72 hours (1st step) + 48 hours (2nd step) Acceleration factor (20 o → 100 o ) : 110 (Ea = 0.5 eV), 8000 (Ea = 1.0 eV) Interline resistance, HV leakage current and line + solder joint resistance were measured before and after aging Bias: 500 V at HV line during aging

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March

QC during production : After the assembly with components, the boards should be tested by the producer. Following tests shall be performed: 1. Connectivity and Capacitance test a.) Connection from the connector to the capacitance required b.) Resistance up to 2 MΩ Between any two lines or ground - rejected c.) Capacitance value agrees within 20 percent with nominal 2. Trace resistance test: measurement of the resistance between the connector and LMT solder pad with 20 Ω range and 10mΩ resolution. Resistance of each line should agree within 30 percent with the average value (average measured for that line within the production batch). 3.High voltage test: 500 V test for 10 s on the HV bias line. Leakage current between HV bias line and HV return line and between HV bias line and Ground shall be less than 100 nA.

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Production: 440 (all) PPB1 have been already produced, B3 harnesses already mounted First batch of 620 PPF12 and 450 PPF13 in production, shipping to Taiwan within two weeks

V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Related documents: Explanation of LMT harness routing from PPF0 to PPF1 ATL-IS-EN-0026 PPB1 For Fibres and Low Mass Tapes ATL-IS-ES SCT End-cap LM tape mapping table - module to PPF1 ATL-IS-EN-0024 End-cap Module and Services Position Numbering Scheme ATL-IS-EN Spreadsheet of Low Mass Tape Length from PPF0 to PPF1 on SCT end- cap ATLAS-IS-ES-0095 Technical specification for the manufacture and supply of low-mass tapes for the ATLAS SCT detector ATL-IS-CS-0014 SCT Low-mass Power Tapes ATL-IS-AT-0013 PPF1, LMT and PP0 assemblies for the forward part of the SCT (in preparation, draft on