PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.

Slides:



Advertisements
Similar presentations
Electric Strike Selection and Installation By: Michael D. Vorpahl, CRL Capital Lock, Inc Regent St. Madison, WI Phone: Fax:
Advertisements

Exterior Window and Door Frames
Structural Steel Construction
FVCC Fire Rescue Forcible Entry.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Cabinet and Countertop Installation
CASTING A CONCRETE WALL
Heavy Concrete Construction Formwork
Cairo Metro Line3 / Medinah Car Park II
“Sustainable Building Systems and Construction For Designers” Chapter 7: Walls.
Competency: Draw Wall Sections
Gravity Force Resisting Systems
PowerPoint ® Presentation Chapter 4 Flatwork Flatwork Applications Site Preparation Concrete Reinforcement Flatwork Procedures Joint Control Bleedwater.
ICRA Panel System Installation Instructions
QUINN TRUSS OPEN WEB JOIST SYSTEM TECHNICAL DETAILS.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red.
Chapter 20 Cladding with Masonry & Concrete
Foundation Systems.
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Chapter 7 Metals.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Rectangular framed structures
CONSTRUCTION AND DETAILING 1
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
Residential Construction Residential Doors *Source: (1) Carpentry & Building Construction Feirer & Freirer.
Week 9 Drafting Interior Elevations and Sections.
Chapter 4 Measuring Concrete Work
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
ASSIGNMENT Begin on page 197 “The Foundation”.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
Balloon Frame North-American invention, 1833
Plain & Reinforced Concrete-1 CE-313
Reading Structural Drawings
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Shear Walls Section 3.
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Roof and Ceiling Framing
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
‘Market Leaders in Rendered Building Products’ The Poly-Tek Cabin.
Traditional Fixtures & Fittings 1 J. Byrne Fixtures & Fittings J. Byrne
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
QuickWalls® strong. fast. simple. *Light Weight *Insulated
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Drafting 2 (Arch) Quiz Review #5
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Identifying Information: Building Exterior - 1 You observe damage to the frame on this exterior entry door. The door cannot be locked. LEVEL 3.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Framing Vocabulary Stud: upright beams in the framework of a building
APPLICATIONS OF TECHNOLOGY
Competency: Draw Wall Sections
Objective 6.02 part 1: Recognize components of construction
Competency: Draw wall sections and details.
Cast in Place 2 way Flat slabs Basically joists in both directions
Arch205 building construction wall systems- Steel
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Building section A vertical cut or slice through a structure that illustrates the type of foundation, wall, and roof construction to be used.
Wood Frame Construction
Installation Overview
Traditional Fixtures & Fittings
Wall and Ceiling Construction
Competency: Draw Wall Sections
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Neutron guide Shielding Concept
Presentation transcript:

PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS

PAVSYS EXT12CB24 PAVSYS PAVSYS ™ PAVSYS PAVSYS 450 CORE Slide each full length core section into the grooves cut in the flat panel surface Place the wall panel face down on a flat surface.....

PAVSYS EXT12CB24 PAVSYS PAVSYS ™ PAVSYS PAVSYS Form window opening by sliding each core section (in sequence) into the grooves cut in the flat panel surface CORE CORE CORE CORE CORE 450 CORE Place the next wall panel face down on a flat surface.....

PAVSYS EXT12CB24 PAVSYS PAVSYS ™ PAVSYS PAVSYS Place each panel upright on the edge of the concrete floor slab......

500 CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS EXT12CB24 PAVSYS PAVSYS ™ PAVSYS PAVSYS Place the adjoining panel with the window framing cores already fitted......

500 CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB24 PAVSYS PAVSYS ™ PAVSYS PAVSYS Continue to place each panel until you complete one section......

500 CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB24 PAVSYS PAVSYS ™ PAVSYS PAVSYS Insert the steel locking plates to span adjoining panels and fit under the window openings......

PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS PAVSYS ™ PAVSYS PAVSYS Mount the steel rebar in the gaps between the cores and tie the overlaps......

PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS PAVSYS ™ PAVSYS PAVSYS Complete all the wall sections, then spray shotcrete over the rebar to create interlocking columns and beams......

PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS PAVSYS ™ PAVSYS PAVSYS EITHER: Continue to apply shotcrete to form an exterior coating finishing flush with the cores that frame the openings......

PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS PAVSYS ™ PAVSYS PAVSYS After the shotcrete has cured, remove the full depth cores and install the window and door frames......

PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS PAVSYS ™ PAVSYS PAVSYS OR: Alternatively fasten the horizontal sheeting to the mounting strips fixed to the concrete columns......

PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE PAVSYS EXT12CB CORE CORE CORE PAVSYS PAVSYS ™ PAVSYS PAVSYS Remove the full depth cores framing the openings and install the window and door frames......

PAVSYS PAVSYS ™ PAVSYS PAVSYS NOTE: To ensure correct core depths, exterior cladding options are selected at time of order PAVSYS © COPYRIGHT – PAVILION SYSTEMS AUSTRALIA