Global Design Effort - CFS 12-15-11 SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Interaction Region Studies for a Linear Collider at CERN - Detector ‘push-pull’ slab design - Cavern assessment Matt Sykes.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 J.Osborne (CERN)
CLIC Experimental Area Layout Design Considerations & ARUP Study A. Gaddi, H. Gerwig, M. Herdzina, H. Hervé, N. Siegrist, F. D. Ramos.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Change Management Board Meeting V Kuchler 23 January, 2015.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Report from ARUP meeting Andrea Gaddi, CERN Physics Department.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
5 December 2011 Task 2 Cavern Study Ground model and 3D cavern layout Matt Sykes Eden Almog Alison Barmas Yung Loo Agnieszka Mazurkiewicz Franky Waldron.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
FCC Underground Infrastructure
SiD Collaboration Meeting SLAC, December 2011
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Conventional Facilities and Siting Global Group (ARCFS)
Updated Design of Detector Hall
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
CLIC Civil Engineering Update
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Tom Lackowski Revised 10/12/2011
Presentation transcript:

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING V. Kuchler

Global Design Effort - CFS SiD Collaboration Meeting - SLAC Overview SiD/ILD Engineering and Detector Interface Working Meeting SiD/ILD Engineering and Detector Interface Working Meeting Description of Americas/European Regions Detector Hall Configuration for ILC TDR Description of Americas/European Regions Detector Hall Configuration for ILC TDR Supporting Consultant Work Supporting Consultant Work Efforts to Collect and Document Criteria Efforts to Collect and Document Criteria Summary Summary 2

Global Design Effort - CFS SiD Collaboration Meeting - SLAC CFS and Detector Interface Working Meeting Part of a Pre-Meeting to the SiD Collaboration Meeting Held on Tuesday, December 13 Part of a Pre-Meeting to the SiD Collaboration Meeting Held on Tuesday, December 13 A Focused Meeting Specifically to Review Work to Date to Develop the ILC IR Hall Design and Finalize Layout A Focused Meeting Specifically to Review Work to Date to Develop the ILC IR Hall Design and Finalize Layout  SiD and ILD Representatives  MDI Representatives  Asian, Americas and European CFS Representatives  ILC Project Management Summary of A/E Consultant (ARUP UK) Support Work Summary of A/E Consultant (ARUP UK) Support Work Status of Asian Region Design for IR Hall in a Mountain Site Status of Asian Region Design for IR Hall in a Mountain Site SiD and ILD Installation Models for the Asian Region Mountain Site SiD and ILD Installation Models for the Asian Region Mountain Site Status of Americas/European Design for IR Hall Status of Americas/European Design for IR Hall 3

Global Design Effort - CFS SiD Collaboration Meeting - SLAC Americas/European Region IR Hall Design Fundamentally Different from the Asian Region Approach Fundamentally Different from the Asian Region Approach Vertical Shafts Provide Access to the Interaction Hall in the Americas and European Sites Vertical Shafts Provide Access to the Interaction Hall in the Americas and European Sites Requires Substantial Surface Presence for Detector Assembly Building, Gantry Crane and Ancillary Buildings Requires Substantial Surface Presence for Detector Assembly Building, Gantry Crane and Ancillary Buildings Detector Assembly Methods will be Different from the Asian Region Approach Detector Assembly Methods will be Different from the Asian Region Approach The Goal for the CFS/ MDI/Detector Meeting was to Finalize the Last Open Criteria for the IR Hall Design for the Americas/European Regions The Goal for the CFS/ MDI/Detector Meeting was to Finalize the Last Open Criteria for the IR Hall Design for the Americas/European Regions  Final IR Hall Dimension Consensus  Final Shaft Size and Configuration  Resolution of Crane Capacities  Responsibility Pac-Man Design and Costing 4

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 5 TDR Design for Americas and European ILC IR Hall Design

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 6 Cross Section Through IR Hall

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 7

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 8

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 9

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 10 Cranes and Platforms ILD and SID Platforms in IR Hall ILD and SID Platforms in IR Hall ILD and SID Platforms in Surface Building ILD and SID Platforms in Surface Building Additional Cranes in Hall Additional Cranes in Hall  One 40 Ton Crane in Each (SiD/ILD) Garage Area  One 100 Ton Crane Over Interaction Region Additional Cranes at Surface BuildingsAdditional Cranes at Surface Buildings  4000 Ton Main Hoist  One 250 Ton Crane Over Each (SiD/ILD) Assembly Area  Plus 40 Ton Crane Over Each (SiD/ILD) Garage Area Shaft Pac-Man Design and Costing will Continue to be Developed by the MDI/Detector GroupsDesign and Costing will Continue to be Developed by the MDI/Detector Groups Assignment of Costs - TBDAssignment of Costs - TBD

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 11 Supporting Consultant Work for IR Hall Design Contracts were Developed with ARUP UK to Supplement Americas and European IR Hall Design for Both ILC and CLIC Contracts were Developed with ARUP UK to Supplement Americas and European IR Hall Design for Both ILC and CLIC  Geotechnical Ground Model Using the CLIC IR Hall Design and CERN Geology  Platform Design for Detector Movement in IR Hall with Options for Movement Systems (Applicable to Both ILC and CLIC Detectors) J Osborne Provided a Summary of the Work Completed to DateJ Osborne Provided a Summary of the Work Completed to Date Final Reports will be Submitted in Early 2012 Final Reports will be Submitted in Early 2012

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 12 Mobilised Strength (overstressed when < 1) Geometry GGeometry G + 10m Contours of Overstress

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 13 Example – Top Heading Excavation Ground Deformations -Invert deformations are in accordance with measured displacements at CMS. -Maximum tunnel convergence = 0.2% which is acceptable

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 14 Caverns Moved CloserRevision G Concrete Pillar, separation governed by detector proximity ~20m separation High Stress around IR

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 15 Potential Advantages: Reduces lining stress around caverns Slab foundations likely to be extremely stiff Vertical walls at IP, machine/detector interface can be optimised Slab size potentially independent of detector width Minimum travel time and umbilical lengths

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 16

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 17

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 18

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 19

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 20

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 21

Global Design Effort - CFS SiD Collaboration Meeting - SLAC Consultant Summary CERN Geology was the Basis of the Analysis CERN Geology was the Basis of the Analysis Floor and Platform Design (Using CERN Geology) can Meet the Deflection Limits Required by ILC/CLIC Detector Groups Floor and Platform Design (Using CERN Geology) can Meet the Deflection Limits Required by ILC/CLIC Detector Groups CLIC IR Hall Configuration can Benefit by a Central Pillar Design at the Interaction Point CLIC IR Hall Configuration can Benefit by a Central Pillar Design at the Interaction Point Rock Strength for the Americas (Limestone) and Asian Region (Granite) Geology is Stronger than the CERN Mollasse Rock Strength for the Americas (Limestone) and Asian Region (Granite) Geology is Stronger than the CERN Mollasse Platform Design has been Completed and is Applicable for Both ILC and CLIC Detectors Platform Design has been Completed and is Applicable for Both ILC and CLIC Detectors Additional Contracts will be Established with ARUP UK Additional Contracts will be Established with ARUP UK  Survey of Air Pad and Hillman Roller Installations Moving Loads Equivalent to ILC/CLIC Detector Loads  Geotechnical Analysis of ILC IR Hall Configuration in the Americas Region Limestone Geology 22

Global Design Effort - CFS SiD Collaboration Meeting - SLAC Criteria Documentation F Asiri Described the Interface Control Document Used to Document Criteria for the Thirty Meter Telescope (TMT) Currently Being Designed for a Site in Hawaii F Asiri Described the Interface Control Document Used to Document Criteria for the Thirty Meter Telescope (TMT) Currently Being Designed for a Site in Hawaii This Format can be Used During the Preliminary Design Stage as well This Format can be Used During the Preliminary Design Stage as well Information for both the SiD and ILD Detectors will be Documented Using this Format Information for both the SiD and ILD Detectors will be Documented Using this Format  F Asiri will Work with the SiD Detector Group  T Lackowski will Work with the ILD Detector Group After Review and Consensus by both the Detector Groups and CFS, Criteria will be Entered into the ILC EDMS SystemAfter Review and Consensus by both the Detector Groups and CFS, Criteria will be Entered into the ILC EDMS System 23

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 24

Global Design Effort - CFS SiD Collaboration Meeting - SLAC 25 1.I NTRODUCTION This is the SiD Structure (STR) to IR detector Hall Interface Control Document. The intended audience for this document are:  The SiD Structure design team  The CFS design team This document is a living document and will be updated to account for changes and upgrades to the IR Detector Hall and the SiD structure designs.

Global Design Effort - CFS SiD Collaboration Meeting - SLAC Summary Interaction and Exchange Between the MDI/Detector Groups and the CFS Group has been Extremely Productive Interaction and Exchange Between the MDI/Detector Groups and the CFS Group has been Extremely Productive The CFS Group Now has the Fundamental Criteria Required to Produce the ILC TDR The CFS Group Now has the Fundamental Criteria Required to Produce the ILC TDR  Americas, European and Asian Dimensional Requirements for IR Hall Design  Crane Coverage Requirements have been Established  Detector Assembly Schemes for Both Asian Mountain Region w/Horizontal Access and Americas and European Region w/Vertical Shaft Access have been Considered and are Understood The CFS Group Now has the Information Needed to Proceed with the ILC TDRThe CFS Group Now has the Information Needed to Proceed with the ILC TDR 26