1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
M.J. LeVine1STAR HFT meeting, Sept 27-28, 2011 STAR SSD readout upgrade M. LeVine, R. Scheetz -- BNL Ch. Renard, S. Bouvier -- Subatech J. Thomas -- LBNL.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
SSD Tasks and Costs Howard Matis October 14,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
SSD Ritter Review June 20, 2012 Conventional Systems: Cooling, Power Supplies, Cables, and all some of that stuff Jim Thomas Lawrence Berkeley National.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Status of NA62 straw electronics Webs Covers Services Readout.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Jim Thomas - LBL 1 SSD News and Integration Notes Jim Thomas Lawrence Berkeley National Laboratory September 11 th, 2007.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
ELENA installation progress F. Butin / ELENA collaboration.
Jim Fast Pacific Northwest National Laboratory
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Face to Face Meeting – March 2012 Sarah Morgan
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD

2 Jim Thomas - LBL News The contract between BNL and Armines (Subatech) has been signed. Work by Christophe on the Ladder Board and RDO boards has begun in earnest. The most significant issue to be addressed is the layout of the FPGA pins whose rows and columns were inverted on the prototype board. This will be complete by July 2 nd, 2012 We have completed a new schedule and overall, the LB and RDO board activities will be 1-2 months late in schedule still looks OK due to some remaining slack and inefficiencies in schedule

3 Jim Thomas - LBL Slow Controls Weihua has recovered the old SSD slow controls interface Adopted new orientation of ladders (  rotation by 9 degrees) and included in GUI HV interface re-engineere3d for Wiener crate and ISEG module We have ordered a Wiener crate and one ISEG Bias supply and one ISEG LV supply –14 week delivery time  Next step is to reverse engineer the JTAG to Corelis Board interface and update ala Micheal

4 Jim Thomas - LBL Survey and Cooling Survey Plan –A ladder is on its way to Berkeley for the purpose of developing a survey plan and designing equipment for use in the survey shop –This ladder will also be used at BNL for testing JTAG communications Cooling –Diagnostic equipment has been a boat load of fun and a distraction from other aches and pains TCP/IP Voltmeter and T probeMass Air Flow Sensor (Volvo)

5 Jim Thomas - LBL Mechanical Engineering: Under the Shroud A great deal of useful discussion about the shroud has taken place in the last 3 months. Desirable to make more space near ladder ends for cabling and optics Attractive options include enlarging the ID of the shroud and/or extending it in Z –need assembly plan for the shroud, may involve clamshell design, etc. –pending electrostatic calculations and other thoughtful work

6 Jim Thomas - LBL Milestone Progress PCB for Cable work waiting for Indiana contract SSD RDO Design will be delayed few weeks Mechanical Design is next major milestone All RDO and LB milestones delayed 1 to 2 months L2 - RDO design review late 1.5 mo (7/13 – 8/31/12) L2 - begin LB production likely to be one month late (11/6 – 12/3/12) WBSTask NameDate L2 CP - SSD Prototype Ladder Board Design Finished10/15/ L2 CP - SSD QRDO Board design finished7/19/ L3 CP - QRDO Complete8/23/ L3 CP - Ladder Board Prototype Phase I Complete10/31/ L3 CP - PCB for Ladder Board Cable Ready for Fabrication 11/2/ L3 CP - Production DAQ Design Review Completed11/28/ L3 CP - SSD RDO Design Finished1/27/ L3 CP - Mechanical Design of SSD components on OSC complete - HFT design Review to sign off 6/1/ L3 CP - Power Supply Design Review Complete6/29/ L2 CP - SSD Preproduction Design Review of RDO7/13/ L3 CP - Preproduction Ladder Board PCB Received8/10/ L3 CP - Production Ladder Board Internal Review Completed 10/8/ L2 CP - SSD Production of Ladder Boards Ready to Begin 11/6/ L3 CP - Production Ladder Board PCB Received1/22/ L3 CP - Slow controls ready for testing1/30/ L3 CP - Production RDO Board Received3/22/ L3 CP - Mechanical Components on OSC Installed4/1/ L3 CP - Electronics Complete6/14/ L3 CP - Survey Complete7/9/ L3 CP - Installation of cooling on STAR platform and Magnet Endcap complete 8/16/ L2 CP - SSD Assembled on OSC Ready for Installation8/28/2013 Complete Future Late

7 Jim Thomas - LBL Summary The contract with Subatech started on February 1 st –Most difficult activities will complete by July 2 nd –Almost back on schedule, only 1 to 2 months late … (keep your fingers crossed) Minor delays on RDO board, 1 to 2 months late –Full production of RDO comes later that Ladder Boards (that’s new) Currently rethinking delivery, shipping and survey schedule for ladders to try to make up this 1 to 2 month delays Mechanical Engineering and conventional systems need attention –Many small tasks slipped while we tended to more pressing matters We hope to accelerate the procurement of Ladder Board parts –Weiner crates and LV and HV modules, too –No reason to wait … can only cause us pain, later, if late on delivery –Need guidance from Sara on target date for next contract with LBL Yes, there is a good chance we can install the SSD in the summer of ‘13