International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
Site report GSI Darmstadt FAIR project Overview IT at GSI
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project TRD workshop, Romania, September 24-28, 2005.
J. Marton, ÖPG-FAKT, Weyer, September 27, FAIR at GSI and the Future of Hadron Physics J. Marton Institute for Medium Energy Physics Austrian Academy.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
CBM Constitution (By-law) Mihai Petrovici, CBM-Meeting, GSI-Darmstadt, October 5-7, Short history - Why do we need a Constitution ? - Present draft.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
Claudia Höhne GSI Darmstadt
The FAIR Chance for Nuclear Astrophysics Elemental Abundances Core-collapse Supernovae The neutrino process The r-process nuclei in -Wind Neutron Stars.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Helmholtz International Center for Opportunities for NuSTAR and Accelerator R&D Norbert Pietralla Technical University Darmstadt (TUD) (Institute for Nuclear.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The FAIR Project Walter F.J. Müller, GSI, Darmstadt CBM Technical Coordinator FAIR Joint Core Team 2 nd CBM India Meeting, VECC, Kolkata, July 2007.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke,
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Facility for Antiproton and Ion Research – Research Program and a Status Report Walter F. Henning – GSI Darmstadt & University of Frankfurt Hadronic Physics,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR CNI 2nd Annual Report meeting October 11, 2007 J. Eschke, GSI DIRAC-Phase-1.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
International Conference on Science and Technology for FAIR in Europe 2014 APPA Cave Instrumentation for Plasma Physics Vincent Bagnoud, GSI and Helmholtz.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
ESR Slow highly charged ions and antiprotons
Perspectives for Heavy-Ion Collisions at Future Facilities
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
FAIR – the Universe in the labororatory
and collaboration with France
Presentation transcript:

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI An International Facility for Antiproton and Ion Research Status of FAIR project (Juergen Eschke) FAIR physics program (Peter Senger) CBM physics program (Claudia Hoehne) Detector concept and simulations (Volker Friese) Technical challenges (Walter Müller) GSI, Darmstadt, Germany

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI Primary Beams /s; GeV/u; 238 U 28+ Factor over present intensity 2(4)x10 13 /s 30 GeV protons /s 238 U 92+ up to 35 GeV/u up to 90 GeV protons Secondary Beams Broad range of radioactive beams up to GeV/u; up to factor in intensity over present Antiprotons GeV Cooled beams Rapidly cycling superconducting magnets Key Technical Features Storage and Cooler Rings Radioactive beams e - – A (or Antiproton-A) collider stored and cooled GeV antiprotons Polarized antiprotons(?) International FAIR Project:  Intensity Frontiers SIS FRS ESR SIS 100/300 HESR Super FRS NESR CR RESR CBM HADES FLAIR FAIR GSI

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI Research Areas: Nuclear structure and nuclear astro- physics with beams of short-lived nuclei Hadron physics and QCD with cooled antiproton beams Physics of high-density nuclear matter and the quark-gluon phase transition Physics of dense plasmas Atomic physics, fundamental symmetries and material science (and polarisation) (antimatter) Five Scientific Pillars

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI "Final" Layout

Volume 1 Executive Summary Volume 2 Accelerator and Scientific Infrastructure Volume 3A Experiment Proposals on QCD Physics 3.1 CBM Volume 3B Experiment Proposals on QCD Physics 3.2 PANDA 3.3 PAX 3.4 ASSIA Volume 4 Experiment Proposals on Nuclear Structure & Astro Physics (NUSTAR) 4.1 LEB-SuperFRS 4.2 HISPEC/DESPEC 4.3 MATS 4.4 LASPEC 4.5 R3B 4.6 ILIMA 4.7 AIC 4.8 ELISe 4.9 EXL Volume 5 Experiment Proposals on Atomic, Plasma & Applied Physics (APPA) 5.1 SPARC 5.2 HEDgeHOB 5.3 WDM 5.4 FLAIR 5.5 BIOMAT Volume 6 Civil Construction and Safety FAIR BTR FAIR Baseline Technical Report Official FAIR project description 6 Volumes with more than 3500 pages and more than 2600 authors CN DE ES FI FR GB GR IN IT PL RO RU SE For down load of the report:

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI FAIR Baseline Cost CORE Evaluation and TAC recommendation (M€) Accelerators 533 Baseline Experiments ** 180 Buildings & Supply Systems Total Investments 1002 Manpower (2400 MY) Total Project Construction Cost % of construction cost from Germany, 25% from member states Operation costs shared among member states ** additional funding expected from 30 non-member states already involved in FAIR experiments

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI Recommendations on FAIR Experiments ExperimentPAC Core Facility Comments R3BNUSTARyes HISPEC/DESPECNUSTARyes ILIMANUSTARyes LASPECNUSTARyes MATSNUSTARyes AICNUSTARnoopen scientific & techn. issues ELISeNUSTARyes EXLNUSTARyes NCAPNUSTARnorequest beam-time EXO-pbarNUSTARno PANDAQCDyes CBMQCDyes PAXQCDno Strong scientific merit  prove feasibility ASSIAQCDnoConsider joining PAX LAPLACE/HIHEX/WDMAPPAyesshould merge under one umbrella FLAIRAPPAyesnot part of the initial CDR SPARCAPPAyes BIOMATAPPAyes 2500 scientists involved

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI PAC QCD PAC NUSTAR PAC APPA TAC Observers: FAIR Project CORE Cost Review Groups FCI Full Cost Issues AFI Working Group Administrative + Funding Issues LFI Legal Framework Issues STI Working Group Scientific + Technical Issues ISC International Steering Committee Present Committee Structure of the International Project FAIR Mini-TACs Cryogenics Warm magnets Cold magnets Power Supplies Beam Instrumentation p-Linac 13 potential ‘M e m b e r s t a t e s’ CN DE ES FI FR GB GR IN IT PL RO RU SE

Proposed FAIR – Roadmap: Establishment of FAIR GmbH Contracting Parties Share- holders (SH) Bylaw Subgroup AFI ISC STI IKAB Joint Core- Team 07/ / Nomination of Shareholders + Completion of negotiations Completion of draft Bylaws Signature of Convention and Final Act Signature AoA STI AFI joint meeting ISC/SH ISC Bylaws, draft FAIR GmbH structure and kick-off staffing Convention, Final Act, AoA; Joint Core Team Technical evaluation of potential in-kind contributions (ongoing process up to the formation of FAIR GmbH) Mandate for IKAB Monitoring of technical planning and project costs (ongoing process up to the formation of FAIR GmbH) Elaboration of the Bylaws (ongoing) Convention Final Act AoA First meeting: start senior staffing Constitutive Meeting of the Council Convention, Final Act, AoA; Bylaws (first draft) Bylaws, draft FAIR structure Technical project decisions (follow up design changes) / FAIR preparation tasks (ongoing process up to the foundation of FAIR GmbH) Formation FAIR GmbH Negotiations (ongoing, 'till end of 2006) meetings

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J. Eschke, GSI Next steps: 1. Appointment of shareholders 2. Completion of negotiations on financial / in-kind contributions with FAIR member countries 3. Final checks of legal documents 4. Signing of Convention 5. Establishment of FAIR GmbH (Mid 2007) 6. Start Civil Construction (End 2007 / Beginning 2008) Project Status and next steps:

FAIR – Facility for Antiproton and Ion Research CN DE ES FI FR GB GR IN IT PL RO RU SE in 2015 after 8 year of construction Observers