www.btwholesale.com STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT 13.30 CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.

Slides:



Advertisements
Similar presentations
INTERCONNECT PRODUCT FORUM Thursday 3 rd February
Advertisements

Wholesale Line Rental Consumer Issues Task Group 5 August 2002.
Frank Stuart-Brown OCT/NOV 2001 OPF MNP FG Monthly Update.
Standard Contract Forum 6 July Customer Suite, BT Centre, London.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
©Ofcom Voice – the need to take a long term view on sector evolution Chris Rowsell 18 October 2007.
Standard Contract Forum 24 April Customer Suite, BT Centre, London.
Standard Contract Forum 04 December Customer Suite, BT Centre, London.
Standard Contract Forum 31 January Customer Suite, BT Centre, London.
Issue 3.2 (1 st June 2012)Author: Zack Thompson1 NCC Carrier Price List (CPL) Guidance Slides CONVEYANCE TELEPHONY These slides are provided as a ‘rough.
© Copyright 2007 Arbinet-thexchange, Inc. All Rights Reserved. VoIP Peering Pilot Using the Internet2 Backbone.
Audit Advisory Committee Public health transition update 22 January 2013.
PPC Industry Forum 2 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Standard Contract Forum 24 January Customer Suite, BT Centre, London.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Standard Contract Forum 26 March am Customer Suite, BT Centre, London.
FAQs about the new regulatory framework Lucy Rhodes
Standard Contract Forum 12 February Customer Suite, BT Centre, London.
OFTEL Operator Policy Forum October 2000 Update on Pay for Product Adam Maxted Chairman of PfP Committee.
Standard Contract Forum 22 July Customer Suite, BT Centre, London.
Interconnect Policy & Contract
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
1 EBC Workshop Introduction and Welcome.
Kingston Communications SMP obligations and their implications for “NTS calls originating in Hull” Huw Saunders Group Regulatory Affairs and Technology.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Standard Contract Forum 2 September 2004 Charles Walker 2 September 04.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 FRIACO OFTEL INTERNET FORUM - 11 December 2000 Geoff Brighton JanWillem van den Bos.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.
Legal and Business Services Legal and Business Services Standard Contract Forum 29th January 2004 John Ewbank.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
ICPS 1 Two triallists have been selected: Energis and WorldCom Energis and WorldCom are currently sharing the chairperson role. The ICPS Implementation.
BT Wholesale Services and Solutions Voice & Access Market Solutions In-direct Access Transit Product SMP Mobile BT IDA Operator £ £ £ Key: Call Flow Money.
Agency Charging Statement Overview of Consultation 11 th February 2008.
CPS LOCAL EXCHANGE CALLS BT WHOLESALE UPDATE 2 SEPTEMBER 2004 TIM HOWSON PRODUCT DEVELOPMENT MANAGER The information in this presentation.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
STANDARD CONTRACT FORUM SESSION 2 February 2010 Keith Mitchinson.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Standard Contract Forum 24 May am Customer Suite, BT Centre, London.
European Developments Transmission Workgroup 3 rd May 2012.
Finance Department Environmental Services City of Superior Superior Water Light & Power Wastewater Billing.
Finance Department Environmental Services
Update from the Local Authority
Transmission Planning Code – Draft Document
Key Value Indicators (KVIs) ‘Accepted’ Version 1.0
Geographic Porting Process : UK
Eagle Programme : 4 Box Summary
MBIE arrangements for finalising remaining technical regulatory settings in the Telecommunications (New Regulatory Framework) Amendment Act, 2018 Presentation.
Amendment Invoice Task Force Progress Report
Key Value Indicators (KVIs) Version 1.1 (amendments from V1.0 in red)
Approach to Market Cutover - Draft for Discussion
Exit Capacity Substitution and Revision
Key Value Indicators (KVIs)
Transmission Planning Code Review
Amendment Invoice Task Force Progress Report
Modification 501 slides for Workgroup
Planning and Zoning Board – October 14, 2004
Key Value Indicators (KVIs) Version 3.0
Review of the 1958 Agreement
NCC Carrier Price List (CPL) Guidance Slides
DSC ChMC Switching Programme Update 10th July 2019
Presentation transcript:

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT AGENDA 1.INTRODUCTION AND NOTES OF PREVIOUS MEETING 2.UPDATE ON 2004 GCR, CREDIT VET AND SCHEDULE 11 3.PPP 4.NTS 3 RD PARTY HANDOVER 5.SIA CREDIT VET PROGRESS/OTHER BILLING UPDATES 6.ANY OTHER BUSINESS

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT SIA – PLANNED CONTRACT SCHEDULE Update to Schedule 143 (Carrier Pre-Selection) being discussed with CPS SAD Implementation Working Group

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT GENERAL CONTRACT REVIEW BT Review Notice end June 2004 Six industry Review Notices Those six invited to initial scoping meeting held in mid Sept Five areas identified: Finance – Pricing – Networks – Products - Contracts Initial meetings held on all but Pricing area Further meetings planned Separate sessions planned for (i) System Alterations and (ii) IA/CPS Operator Assistance First industry briefing shortly

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT SIA CREDIT VET TIMETABLE - ONE Review Notice -> Industry Discussions Offer to industry May 02 Oftel Direction February 03 Revised proposal to industry group May 03 Industry discussions June-August New Oftel Directions November 03 “Storyboard” to industry group early March 04

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT SIA CREDIT VET TIMETABLE - TWO March-August Industry Discussions 1 SeptemberLaunch of BT SIA Credit Policy Revised Reference Offer 10 SeptemberOffer of revised text to existing operators 19 September Reminder letter to existing operators October Commercial Managers chase existing operators NovemberReference to Ofcom?

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT SCHEDULE 11 REVIEW PROGRESS (Para 8 of Schedule 11) October 2003 Review Notice Discussion programme – November 2003 to July(?) 2004  Progress/agreement on many areas  Issues re Directory Entry Classification  Progress on change management process BT considers sensible to relaunch - industry briefing 25 October 2004 October 2004 Review Notice this week  Consolidate progress over last year  Resolve Directory Entry Classifications/Change Management issues  New – BT Contact Database; IP guarantees; move to standalone? Interconnect notification shortly Discussion programme 19 November onwards

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT AIT (ARTIFICIAL INFLATION OF TRAFFIC) Discussions stem from 2002 General Contract Review Extensive industry discussion through to June 2003, leaving BT to action As agreed, BT pursued proposals with external legal support Meeting with industry 20 September 2004 BT actioned to prepare draft text 1 November meeting now cancelled 26 November meeting ongoing

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT PPP Determination & Implementation 28 th October 2004 Mick Sharpe BT Wholesale Product Management

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Definition of PPP 2.Products affected. 3.Summary of Ofcom Determination 4. Implementation phases  Interim – credit notes  Strategic – systems development 5.Summary

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Definition of PPP Product Management, Policy and Planning (PPP) is a term given to the administrative costs incurred by BT as a result of providing narrowband services. Charges for narrowband interconnection services, therefore, have two components:  a network based charge for the interconnection service provided over BT's network; and  a PPP charge designed to recover BT's administrative costs of providing the narrowband interconnection service. There are two types of PPP charge:  pence per minute ("ppm") - a fixed PPP charge for each interconnection minute; and  FRIACO - a PPP charge per FRIACO port.

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Products Affected The products affected are:  Transit  Interconnect calls  BT – BT calls  Friaco

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Summary of The Determination on Product Management, Policy and Planning OFCOM Determination on 30 th July 0.012ppm (from ppm) applicable from 01/07/04 to 30/09/04 PPP to be charged across all calls incl. BT Retail All calls to be charged only one element of PPP. Non-product specific bad debt, one off charges excluded from PPP Interconnect Specific Basket (ISB) restructured post Oct 04:  RPI-8.25% overall cap retained  But RPI-0% sub caps respectively on Circuits and PPP Service Centre charges transferred from calls to circuits FRIACO PPP £18.91 per circuit. OFCOM has asked BT to consult with industry over Multi PPP leg calls excluding CPS & IA (as these are already covered)

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT PPP Implementation Overview Phase 1 – Interim actions Credit notes (two types PPP rate reduction & Multi PPP rebate CPS/IA) CPL Changes & Industry briefings Phase 2 –Strategic actions Systems development for Multi PPP leg calls CPS & IA Industry consultation on Multi PPP leg calls other

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT PPP Implementation – Phase 1 Interim Actions Price changes 1 st July 04 – 30 th Sept 04: New PPP Prices published in CPL on 1 st Oct 04 ACCN notification and Industry Briefing issued Credit notes for July and Aug issued 10/09/04 for Multi leg PPP CPS & IA calls and will arise monthly thereafter.

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT PPP Implementation – Phase 1 Interim Actions Price changes from 1 st Oct 04 until 31 st March 05: IX ccts prices changed to recover Service Centre costs as per determination - PPP remains at 0.012ppm. Prices have been published in CPL on 1 st Oct 04 to apply from 1 st Jan 05 ACCN notification on 1 st Oct 04 Invoices with new prices for PPP rate reduction will be issued in early November for October traffic (no more credit notes after this for PPP rate reduction)

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT PPP Implementation – Phase 2 Longer Term Strategic Actions Billing systems development – Planning to implement a system development to eliminate credit notes for Multi PPP CPS & IA calls. Consultation with OLOs over Multi PPP calls excluding CPS & IA – 5 th November at BT City Place Gatwick (invitations issued).

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Summary Communications Industry Briefing on PPP single leg and PPP rate reduction 1 st July 04 – 30 th Sept 04 issued 21 st Sept. Industry Briefing on NCC prices issued. This presentation to SCF Credit notes/Pricing Single PPP element for CPS & IA backdating to 1 st July 04 completed via credit notes Sep 04 onwards. PPP rate reduction backdating to be discharged via the November credit note Friaco price change implemented. Ongoing work areas Systems development for Multi PPP leg calls BT hosted industry consultation arranged for 5 th Nov to resolve Multi PPP leg call identification issues.

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT NTS Third Party Handover 28 th October 2004 Mick Sharpe BT Wholesale Product Management

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Product overview 2.Schedules. 3.Pre-requisites 4.Summary of ordering process

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Product Overview - NTS Third Party Handover

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Product Overview - NTS Third Party Handover The service will apply both to BT originated and Communication Provider originated calls (transit calls). The product will be implemented by reassigning “whole” codes which currently point to the NTS code owner (if existing) to a Third Party Operator as specified in their routing plan. Product features are: Commercial arrangements between the third party operator and the NTS code owner will need to be agreed separately. BT’s commercial arrangements (apart from those for number portability) will be with the Third Party Operator only. The NTS code owner will retain their own porting obligations and porting relationship with BT.

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Schedules The schedules applicable are:  Schedule 311 Operator Free phone calls  Schedule 312 Operator Local Call Fee Access  Schedule 313 Operator Premium Rate Service Calls  Schedule 315 Operator National Calls  Schedule 410 Operator 0871 NTS calls  Schedule 411 Operator 0844 NTS calls  Schedule 102 Transit

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Pre-requisites BT will require that the TPO provides a letter of authority from the code owner to implement the relevant number range(s) on the interconnection between the TPO and BT. The NTS code owner must retain responsibility for their own porting obligations and porting relationship with BT. Interconnection will need to be maintained between the NTS Code owner and BT to meet number portability obligations. Any alterations to ported traffic interconnect routeings between BT and the NTS Code owner will need to be separately agreed. Available only to NTS code owners with established interconnect with BT or to new operators once they have established interconnect with BT (in order to meet portability obligations).

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT Summary of Ordering Process The following give a brief description of how the Communications Provider can place an order for NTS Third Party Handover service: 1.Letter of Authority is required from the code owner. This should be sent to BT via the TPO. 2.Third party operator agrees routing plan with their technical account manager (TAM). 3.Data management amendment (DMA) and routing plan sent to commercial manager (CM) from TPO as well as letter of authority from the NTS code owner as above. 4.CM for TPO arranges contract for service provision and sends to customer for authorising.

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT PPC Credit Vetting Update Charles Walker

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CURRENT STATUS : Version 6.0 of the policy document was released on 13 th September and included updates of agreed changes from the Industry consultation meeting of the 21 st July and incorporation of some of the comments received from Operators subsequent to that meeting. Over the last few months we have been through a full and thorough consultation process with industry representatives, culminating in that Issue 1.0 of the process documentation which will be issued shortly. BT will be responding in the next few days to the outstanding queries received from a limited number of Operators. Some of their requested changes have been made others have not, and we will document in our response to those Operators why certain changes have not been made.

STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT A contract amendment is not required before implementation as there is contract provision already in the PPC contract – clause 10.5 refers. Therefore, BT will not be seeking to gain contract amendment signature before implementation. Notification will be provided of implementation 90 days hence.