July 1, 2009CFS-GBL meeting 1 PM report July 1, 2009: Meetings –FALC Quebec, July 12 – 13, 2009 –ILCSC Hamburg, August 19, 2009 –ALCPG09 Albuquerque, Sept.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Advertisements

SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
- Asian Single Tunnel Design Review – A Review on Design Study of the ILC Conventional Facility in Mountain Region Review Organization and Requirements.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
SCRF Monthly WebEx Meeting Agenda 1.Report from PMs 2.Report from Group Leaders 3.Topics 1.Cavity Gradient and Yield re-evaluation 2.Update of.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
BAW Prep S1 Global Status Pilot Plant Status
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Presentation transcript:

July 1, 2009CFS-GBL meeting 1 PM report July 1, 2009: Meetings –FALC Quebec, July 12 – 13, 2009 –ILCSC Hamburg, August 19, 2009 –ALCPG09 Albuquerque, Sept 29 – Oct 3, 2009 –CLIC 09 CERN Oct 12-16, 2009 –Applications of High Intensity Proton Beams Fermilab Oct 19-21, 2009 –Accelerator Design and Integration meeting Sometime in November –TDP1 AAP Review –January 6-8, 2010

This presentation: R & D Plan AD I meeting –Single tunnel CERN / CLIC JINR / GSPI –Publication of joint report SCRF industrialization ‘Association for Advanced Accelerators’… –‘AAA’ - Japan July 1, 2009CFS-GBL meeting 2

Reports Due: R & D Plan –Draft Release 4 to be submitted to EC for review today –Release 4 due for draft distribution to FALC – Resource Group –Rel 4 will have updated global resource tables. –R & D Plan will include references to changes in plan; an historical, traceable, record –R & D Plan will not include a compendium of completed work –Resources must support baseline design development July 1, 2009CFS-GBL meeting 3

This presentation: R & D Plan AD I meeting –Single tunnel CERN / CLIC JINR / GSPI –Publication of joint report SCRF industrialization ‘Association for Advanced Accelerators’… –‘AAA’ - Japan July 1, 2009CFS-GBL meeting 4

DESY Accelerator D / I meeting PM summary distributed June 8, 2009 – Key points –Low power option taken as given No ‘matrix’ of Working Assumptions –Klystron ‘cluster’ analysis (late 2008) to be used as a model for cost comparison wrt RDR –both HLRF options (2a / 2b) to be studied for each of the 3 sample sites –Utility costs also evaluated for each sample site : Baseline which includes 2 alternatives –Allows flexibility; maintains solid cost basis July 1, 2009CFS-GBL meeting 5

Single tunnel Adoption of single tunnel for main linac: –Review safety analysis in each region and consider solution(s) as required The ‘exec’ summary of the above will be the ‘definitive document’ and will be used to support the single tunnel recommendation to AAP - ALCPG –Availability task force – access and equipment reliability/replacement time –Other area single-tunnel issues July 1, 2009CFS-GBL meeting 6

ADI Timeline SB2009 Working assumptions defined Criteria and recommendations to be developed and presented at ALCPG09 Writing assignments ALCPG09 Final Review November 2009 Submission to Project Director late November 2009 CFS meetings: June 2 - CFS Internal Review of AD&I Meeting June 9 - CFS and Damping Ring w/S. Guiducci June 30 - CFS and Electron Source w/ A. Brachmann July 7 - CFS and Positron Source w/J. Clarke and N. Collomb July 14 - CFS and RTML w/N. Solyak June 3, 2009CFS-GBL meeting 7

ADI Action Items CFS3 Schedule WebEx meetings with responsible area contacts Kuchlerdone 4 Prepare feedback questions for TAG group meetings (requirements) Kuchler 5 Evaluate SB2009 requirements and generate cost differentials Kucher, Garbincius 2008 Klystron cluster used as model 6 Evaluate impact of both HLRF solutions on all three sample sites Kuchler, Osborne, Enomoto 7Compile/review safety solutions for single-tunnel Kuchler, Osborne, Enomoto June 3, 2009CFS-GBL meeting 8

HLRF/C FS 8 Update DRFS single tunnel integration models to include utilities, services and other (non-RF) hardware Enomoto, Fukuda 9 Consider possible DRFS tunnel solution with cryomodules supported from the floor Enomoto, Fukuda 10Identify/maximise common design features between both HLRF solutions CFS + Fukuda, Adolphsen June 3, 2009CFS-GBL meeting 9 Manage ment 26 Form availability task force and define plans/studies PMs 27Top-down re-evaluation and update of RDR risk register PMs, PatersonWill require iteration with TAG leaders and review of definition of risk quantification (including cost impact)

This presentation: R & D Plan AD I meeting –Single tunnel CERN / CLIC JINR / GSPI –Publication of joint report SCRF industrialization ‘Association for Advanced Accelerators’… –‘AAA’ - Japan July 1, 2009CFS-GBL meeting 10

CLIC / ILC ‘exec’ meeting Clic / ILC timelines –Is there a coherent ‘joint strategy’ to augment the ‘joint statements’ from 11/08 CERN resources for critical ILC activities –Big 4: –CFS –Cryo –Mass production of cryo modules –Safety (emphasized by Cern DG) Clic costing July 1, 2009CFS-GBL meeting 11

This presentation: R & D Plan AD I meeting –Single tunnel CERN / CLIC JINR / GSPI –Publication of joint report SCRF industrialization ‘Association for Advanced Accelerators’… –‘AAA’ - Japan July 1, 2009CFS-GBL meeting 12

DESY / JINR-GSPI June 25 – 26, 2009 at DESY Geotechnical report –Partial translation by Andrey Dudarev – d=3646 delegation of GSPI: –Vasily KOZHANOV –Afanasy KRESTININ (Valery Sokolov came instead) –Evidently part of a very experienced team delegation of JINR: –Grigori SHIRKOV Grigory TRUBNIKOV Andrey DUDAREV Ioulian BUDAGOV (senior scientist; did not come) July 1, 2009CFS-GBL meeting 13

Contractors Attendees from DESY –Holger Brehm (Steinfeld & Partner, Hamburg) –Lindemar Hänisch (Deutsches Elektronen-Synchrotron DESY), –Jens Mittag (GuD, Berlin) From US: –Tracy Lundin (Hanson Engineering, Springfield IL) July 1, 2009CFS-GBL meeting 14

July 1, 2009CFS-GBL meeting 15

July 1, 2009CFS-GBL meeting 16

Role of JINR – GSPI Study: The most advanced shallow site study underway –All other site studies involve deep rock –A kind of ‘neutral’ process Comparison between deep and shallow sites will indicate substantial cost savings –By evaluating a specific shallow sample site we are able make effective comparisons –Allows us to prioritize and define further studies

Goal for ILC-GDE / JINR-GSPI meeting Review GSPI Preliminary Report Discuss geo-technical aspects of TALDOM area Summarize in a jointly authored report –Sponsored by: –ILC – GDE –JINR –GSPI –EC ‘ILC Hi-Grade’ FP7 programme –DESY

Summary Shallow site studies are very important for the ILC – GDE Conventional Facilities Technical Design Phase –Cost. –Comparison and evaluation will lead to cost savings and design improvements JINR – GSPI is the most extensive shallow site study undertaken in support of the ILC – GDE Reference Design –No other specific shallow site study is presently planned

Summary Site studies will facilitate the site selection process JINR effort is unique and will prove very useful in this complex task –Preparation of joint report comes at a critical time: 2009 will see a recommendation to update the GDE Reference Design On behalf of the ILC Project Managers, We thank you very much and strongly encourage further collaborative efforts

Schedule: (from Vic) Vic’s First Preliminary Descriptions - July 10 G. Shirkov Soil Boring Report Release Agreement w/dist to V. Kuchler and M. Ross - July 10 First Draft - July 31 (Including Translations in ILC doc) First Full Draft with Introduction and Summary - August 14 First Edit - August 28 Final Document - September 11 July 1, 2009CFS-GBL meeting 21

This presentation: R & D Plan AD I meeting –Single tunnel CERN / CLIC JINR / GSPI –Publication of joint report SCRF industrialization ‘Association for Advanced Accelerators’… –‘AAA’ - Japan July 1, 2009CFS-GBL meeting 22

Industrialization and cost reduction Re-visit previous effort, and update the cost- estimate for production –Review the RDR cost estimate (based on TESLA) –Include recent R&D experience (industry/lab) Encourage R&D Facilities for industrialization –Develop cost-effective manufacturing, quality control and cost-reduction in cooperation with industry Reflect the R&D progress for cost-reduction –Baseline  Forming, EBW, assembly work… TTC Meeting, LAL 23

A Plan for R&D facilities and Preparation for Industrialization Bench-mark R&D facility (pilot plant) to study cost-effective manufacturing –Forming and preparation machining, –Pre-surface treatment and preparation, –EBW process with efficient automation, –In-line Inspection during fabrication process for quick-feedback, R&D facilities to be sited at Laboratories –Effort to seek for the most cost-efficient manufacturing with keeping information to be open, –Development to seek for a bench-mark, manufacturing facilities (design and/or itself can be applicable for the real production. –It is important for industries to participate to the program since Day-1. for planning. We may discuss a possibility –An industrial meeting to be held as a satellite meeting at the 1 st IPAC, Kyoto, May, TTC Meeting, LAL 24

Complementary Plans in Industrial R&D Priority In Asia ( KEK) and Europe ( DESY) –Priority for the nominal manufacturing process using EBW technology at both laboratory and Industrial production. –Encourage advanced R&D such as hydro-forming (w/o EBW process) in limited effort –Large grain sheet with multiple.cutting may be in a parallel effort. In Americas (FNAL according to B. Kephart) Priority for hydro-forming approach and others in Femilab leadership effort, in cooperation with American Institution PM(SCRF) consideration –It is important to encourage globally complementary R&D efforts –It is important to support the R&D program, positively, to each other TTC Meeting, LAL

This presentation: R & D Plan AD I meeting –Single tunnel CERN / CLIC JINR / GSPI –Publication of joint report SCRF industrialization ‘Association for Advanced Accelerators’… –‘AAA’ - Japan July 1, 2009CFS-GBL meeting 26

AAA - Japan Routine accelerator technology presentations to industry groups –Including CFS topics CFS presentations on JPARC experience by –Yoshioka –Miyahara –(in Japanese) Have asked Akira to consider arranging related presentations to ILC GDE – CFS group June 3, 2009CFS-GBL meeting 27