Issues regarding Proposal Submission Process I.Short Form II.Communication to Scientists III.Multi-lingual Files Chris Stuebner April 2005.

Slides:



Advertisements
Similar presentations
EndNote Web Reference Management Software (module 5)
Advertisements

NIMAC 2.0: The Accessible Media Producer Portal NIMAC 2.0 for AMPs.
Welcome to the Online Employment Applicant Tutorial Click here for next screen.
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
Research Performance Progress Report (RPPR) Grantees may access a list of progress reports that are due using the Status page in eRA Commons, and selecting.
Five Steps in 5 Minutes Close deals faster, more easily, more often! 1.Start a Quote: Input deal amounts and review the available lease options 2.Create.
NCLB Monitoring NCLB/ESEA Cycle Legal Requirement: EDGAR Part 80.40(a)—monitor subgrant activities to assure compliance with applicable.
Office of Sponsored Programs VANDERBILT UNIVERSITY The Office of Sponsored Programs has upgraded COEUS to accommodate the new Grants.gov C-Forms About.
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
Scopus Title Submission and Evaluation Process Review Presented by: Derrick Duncombe Customer Outreach and Brand Manager Date: 17 February 2011.
The Application for Renewal Accreditation: Electronic Submissions.
Page 1 Grants Business Process Re-Engineering Grants Management Workshop 2006 Grants Online/Grants.gov Functionality Update Lillian Barnes and Steve Drescher.
Welcome to Florida International University Online J.O.B.S. Link Applicant Tutorial.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
FastLane Project Reports System 101 For Faculty and Staff Submitting Annual, Final or Interim Reports on National Science Foundation Projects May 1999.
Experimental Psychology PSY 433
What is so good about Archie and RevMan 5
Invoices On – Line Registration Instructions for Vendors.
Submitting Book Chapters via Manuscript Central A Short Guide for Wiley-VCH Authors.
Tutorial Introduction Fidelity NTSConnect is an innovative Web-based software solution designed for use by customers of Fidelity National Title Insurance.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Info Day on New Calls and Partner Café Brussels 10 February 2011 Application Form – Priority 1,3 How to ensure that your proposal is eligible?
The UT Health Science Center San Antonio: Online Tutorial for the Online Employment System (OES) The UT Health Science Center San Antonio: Online Tutorial.
Lecturer: Ghadah Aldehim
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
SUBMIT YOUR MANUSCRIPT Ocky Karna Radjasa Department of Marine Science Diponegoro University.
ESPON 2013 Programme Info Day on Calls and Partner Café Brussels, 10 May 2012 How to apply: Application Form and Eligibility A Decade of Territorial.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Welcome to the University of West Florida Online Employment System Applicant Tutorial.
ETD Submission Process Fall 2011 Valerie Emerson ETD Administrator, Gelman Library / (202)
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
Step by Step Instruction: How to Conduct Direct Certification using File Upload: SAIS IDs Released January 2014 “How to Conduct Direct Certification using.
Online Reporting Guide
Math Department Proposal Guidance Fiscal Year 2016.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
Plan My Move & MilitaryINSTALLATIONS May, 2008 Relocation Personnel Roles and Responsibilities MC&FP.
TEMPUS IV- FOURTH CALL FOR PROPOSALS TEMPUS INFORMATION DAY Ashgabat - 27 November 2010 Alba Chiara Tiberi Education,
Log on to the site using your User ID and Password and select journal and click “Log In” Click here to create a new account Click here to check the system.
Cindy Collins ETEC 665 Electronic Submissions Submitting Proposals Through Grants.Gov.
Step by Step Instruction: How to Conduct Direct Certification using File Upload: Standard Format Released January 2014 “How to Conduct Direct Certification.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
-Honesty-Cooperation-Responsibility-Respect  Established in 2003 by the Ministry of Economy.  Non – profit public institution.  Managing and administrating.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
NYS Division of Homeland Security And Emergency Services (DHSES) E-Grants Tutorial Creating an Application for the EOC RFP To access DHSES E-Grants you.
Steps for posting a training (single event or series) to the regional calendar R&C Regional Calendar.
The Basics Craig Johnson Grant Administrator Department of Medicine Instructor.
NIMAC for Publishers & Vendors: Using the Excel to OPF Feature & Manually Uploading Files December 2015.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Session 5 – online submission of applications Bruno Breviglieri, Natasha Jovicic.
Advanced NIMAC for Authorized Users 1www.nimac.us.
NIMAC for Accessible Media Producers: February 2013 NIMAC 2.0 for AMPs.
Text2PTO: Modernizing Patent Application Filing A Proposal for Submitting Text Applications to the USPTO.
ACCESSING AND UTILIZING THE PROVIDER PORTAL MEDICAL AUTHORIZATION UNIT 1.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
NPA eMS application – Project Information Joint Secretariat 1st June 2016 – Cork, Ireland.
Non-Tenure Track (NTT) Appointment Process (Preparer Edition) Version 1.0 Presented by the Office of Organizational Research and Data Management School.
How to complete and submit a Final Report through
General Adult Education and
SCC P2P – Collaboration Made Easy Contract Management training
To the ETS - Correspondence Online Training Course
ESøknad - A web-based system for the electronic submission of research funding applications A short presentation of the system intended for principal investigators/researchers.
ESøknad - A web-based system for the electronic submission of research funding applications A short presentation of the system intended for principal investigators/researchers.
To the ETS – Encumbrance Online Training Course
Online Training Course
FY19 Federal Grant Monitoring: Titles I, II, IV
To the ETS - Correspondence Online Training Course
To the ETS – Encumbrance Online Training Course
Towson University Store
Presentation transcript:

Issues regarding Proposal Submission Process I.Short Form II.Communication to Scientists III.Multi-lingual Files Chris Stuebner April 2005

I. Short Form (and Host Government Concurrence)

Simple View Q1Q2Q3Q4Q5Q6Q7Q8 Proposal (Full-Form) Project Agreement & Work Plan Application (Short-Form) Quarterly, Technical, Annual & Final Reports Board Meeting Transmittal Coversheet DED approval Registration Monitoring Visits Redirection Letters Project Coordinators, DED, ED Project Coordinators Project Accountants, Procurement, DED, ED Project Coordinators Project Accountants, Procurement, DED, ED Govt. Concur. Scientists STCU Staff

HGC Another View Application (Short Form) Registration Host Government/s send Proposal (Full Form) to STCU STCU sends Proposal to Financing Parties HGC

Details beneath Surface MOLUZB UKR AZGE Application (Short Form): scientists contact info, country, and intent Registration: computer-generated instructions specific to country: Host Government/s send Proposal (Full Form) to STCU STCU sends Proposal to Financing Parties Scientists follow one of six procedures and submit draft proposals for Host Government Concurrence/s:

Varied Procedures AzerbaijanGeorgiaUkraineUzbekistanJoint LanguageE, R/AzE, R/GeE/UkrE, R/Uzvaries Number of Copies102 0varies Send documents to: STCU, which takes to Govt Govt then STCU Govt only Govt then STCU varies Needed for Host Govt Concurrence -Institute Concur. -Draft cover letter - Institute Concur. -PPER -List to Ministry -Expert Review -Proj Mgr guarantee -Institute Concur. -Ministry Concur - PPER -Cover Letter varies

Discussion: Short Form Elimination Application (Short Form) Registration Host Government/s send Proposal (Full Form) to STCU STCU sends Proposal to Financing Parties HGC Currently, automatic depends on contact/info from application. How will STCU communicate these procedures?

Discussion: Monitoring Process Short Form Registered with STCU Host Govt Concur. STCU preparing Cover Sheet Western Expert Review Funded; no Project Agreement Marzeev Institute of Hygiene & Medical Ecology Palladin Institute of Biochemistry 2643 (Jul 99) NN-24 (WP approved 2/04) NN-27 (12/02) Bogomolets Institute of Physiology Central San-Epi Station 3514 Institute of Epidemiology & Infectious Disease 3208 (since 6/03) 3039

Discussion: Tracking time to HGC Application (Short Form) Registration Host Government/s send Proposal (Full Form) to STCU STCU sends Proposal to Financing Parties HGC What we collect now Time in for HGC Review

II. Automated Communication with Scientists a. upon Registration b.Individual files sent c.Web site access

Ad hoc process Communication already taking place –Responsibility for content not firmly managed by senior specialists or IT –Active management would yield benefits: Reduce inquiries by phone Improve quality of proposals Assign active, empowered owner of automated communication –Important first contact with scientists –Interface with STCU field officers (country-specific procedures) IT (to actually make changes) Designate reviewing authority –Understand process, clear English, notice detail –Aware of other impending changes, but willing to fix the fixable now

to Project Manager - Ukr The STCU is pleased to inform you that your proposal [proposal title] has been registered and assigned number [#]. Please complete and submit the Project Proposal (1 English copy and 2 Ukrainian copies) to the Ministry of Science and Education… You are kindly asked to submit only original documents. The deadline for submission is three months from the date of this letter. Your proposal package should include the following documents: –1. STCU Project proposal (in English and Ukrainian) –2. Previous Professional Experience Review for each weapon scientist, engineer, and technician (PPER_UA.doc); –3. List to Senior Deputy State Secretary of Ministry of Education and Science (LSDSSMES.doc) –4. Project Manager guarantee (PMG.doc) –5. Expert review (ER.doc) –6. Electronic version of your Project Proposal ( {proposal_number.ff}) on floppy, CD-ROM, etc. Previous version of letter specified: Full Form of the proposal (printed version of files FF_EN.doc, FF_ru.doc and FF.xls)

to Project Manager (cont.) Please be informed that for joint proposals with organizations in Azerbaijan, Georgia, Ukraine or Uzbekistan governmental concurrence from each involved country is required. Please note that the Full Form has been revised as of 9 February Because your project has been registered since that date, you will be required to complete the new form. You are not required to submit a separate Sustainability Plan. The current version of the informational package (Sustainability_Plan.doc) is provided for your guidance only. Some sections may prove helpful as you answer the new questions in the Full Form. The attached file ({proposal_number.ff}) can only be edited using the STCU Project Software which can be downloaded from the STCU website ( Once your proposal is complete, all required files mentioned above will be included when you print the document. Need to make reference in letter & file name consistent May wish to explain what, exactly, needs to be printed: 3081_P_EN.doc, 3081_P_RU.doc, 3081-P-budget.xls (which tabs?)

to Project Manager – Uz The Science and Technology Center in Ukraine is pleased to inform you that your proposal [proposal title] has been registered and assigned number [#]. Please complete and submit the STCU Project Proposal (1 English copy and 1 Russian/Uzbek copy) and submit the full package of documents to the Uzbekistan Field Office of the STCU.…. You are kindly asked to submit only original documents. The deadline for submission is three months from the date of this letter. Your proposal package should include the following documents: –1. STCU Project Proposal (in English and Russian); –2. Previous Professional Experience Review for each weapon scientist/engineer/technician (PPER_RU.doc); –3. Electronic Version of your Project Proposal ({proposal_number.ff}) on floppy, CD-ROM, etc.; –4. Governmental Concurrence. Not mentioned: ER (in Ukrainian) LSDSSMES (in Ukrainian) PMG (in Ukrainian) File appears as 3081.ff

to Project Manager – Uz In order to receive governmental concurrence, the following documents should be submitted to the Center for Science and Technologies of the Cabinet of Ministers of the Republic of Uzbekistan: –STCU Project Proposal (1 copy in English and 1 copy in Uzbek or Russian); –Previous Professional Experience Review for each weapon scientist/engineer/technician; –Letter of Concurrence from the Institute; –Letter of Concurrence from the Ministry; –Cover letter. Previous version of letter specified: Full Form of the proposal (printed version of files FF_EN.doc, FF_ru.doc and FF.xls)

STCUPS output: Uzbek (3081) Not necessary for pure Uzbek project: ER (in Ukrainian) LSDSSMES (in Ukrainian) PMG (in Ukrainian)

to Project Manager - Az The STCU is pleased to inform you that your proposal [proposal title] has been registered and assigned number [#]. Please complete and submit the STCU Project Proposal (1 English copy and 1 Russian/Azeri copy) to the Azerbaijan Field Office of the STCU… Please submit one original and one copy of the package of documents. The deadline for submission is three months from the date of this letter. Your proposal package should include the following documents: –1. STCU Project proposal (in English and Russian) –2. Previous Professional Experience Review for each weapon scientist, engineer, and technician (PPER_RU.doc); –3. Electronic version of your Project Proposal ({proposal_number.ff} ) on floppy, CD-ROM, etc. In order to receive governmental concurrence, the following documents should be submitted to the STCU Field Office in Azerbaijan: –Letter of Concurrence from the Institute (Act expertise) –Draft of Cover Letter Dont need: ER (in Ukrainian) LSDSSMES (in Ukrainian) PMG (in Ukrainian)

to Project Manager - Ga The STCU is pleased to inform you that your proposal [proposal title] has been registered and assigned number [#]. Please complete and submit the STCU Project Proposal (1 English copy and 1 Russian/Georgian copy) to the Georgian Information Office of the STCU… You are kindly asked to submit only original documents. The deadline for submission is three months from the date of this letter. Your proposal package should include the following documents: –1. STCU Project proposal (in English and Russian) –2. Previous Professional Experience Review for each weapon scientist, engineer, and technician (PPER_RU.doc); –3. Electronic version of your Project Proposal ({proposal_number.ff} ) on floppy, CD-ROM, etc. –4. Governmental Concurrence. In order to receive governmental concurrence, the following documents should be submitted to the Department of Science and Technology of Georgia: –STCU Project Proposal (1 copy in English and 1 copy in Georgian); –Letter of Concurrence from the Institute. Dont need: ER (in Ukrainian) LSDSSMES (in Ukrainian) PMG (in Ukrainian)

From Scientists Perspective Modify/improve instructions: –Specify more precisely what scientists should print –Make sure files names are called out consistently Improve: –Clarity of instructions –Consistency between text and oral guidance –Website focus (IT vs. user perspective)

Generating Output Files Do not include Ukraine-specific documents in output files for scientists from outside Ukraine: –List to Senior Deputy State Secretary of Ministry of Education and Science (LSDSSMES.doc) –Project Manager guarantee (PMG.doc) –Expert review (ER.doc) Do continue to generate files by country: –Ukrainian/English for Ukrainian –Russian/English for non-Ukraine –Ukrainian/Russian/English for joint

Monitor Quality of Output Files, (example: PPER_RU) English typos (one since corrected): –Stam for stamp (or probably better, seal) –Guiding systems for guidance systems – Word choice/capitalization Format: – text overran box at top of each page Output: – error caused letter to be generated for ALL scientists, not just former weapons scientists

Website focus - currently Welcome –Participants (former Weapons Scientists) –Projects: Regular – [currently no link to Project Software] Partner - [seems ok] –STCU Project Software –News –Downloads [nice page] –FAQS bugs, Version history, On-line Registration –Documents / General Forms & Manuals –Grant-writing Workshop materials –Lab notebook –Sustainability Planning Guide –Info / Collaborators / Benefits for Participants

Proposed Welcome to Participants (former Weapons Scientists) –Projects: Regular – –Explanation of three stages (may borrow from workshop materials) »Link to Application (Short Form) – on-line option / or download »Link to Proposal (Full Form) & instructions »Link to Agreement (Work Plan) & instructions –Collaborators info & [new] Letters of Support page Partner [keep much as is] –Explanation of Governmental/Non-Governmental »Link to Applications –Link to existing Partner sites –Useful Information: grant-writing / sustainability / other sources of funding IPR & lab books

Tactical Issues Once overall process oversight assigned … –Clarity of instructions / interaction with scientists –Website focus (IT vs. user perspective) Then, process may benefit from refinement…. –Document integrity Word vs PDF –Ease of download Embedded in software vs. loose File size / format

II. Multi-lingual files Two examples Question

Files sent to West Random project assigned to test software –Recent proposal (2004) –Currently published for Western Review Problems: –No Ukrainian tech description accessible through database …. BUT –Work plan appears in Ukrainian, not English –Excel tables combine languages

3588_P_UA.doc As is standard, database contains only blank template. Real file on PCs computer.

3588.ff Ukrainian language English!

3588.ff No language Ukrainian

3588-P-Budget.xls Work Schedule, Equipment & Materials are in Ukr or mix of Ukr/Eng

Status I checked with Senior Specialist and confirmed this was not an IT glitch. Rather, the project was received from the Ukrainian Ministry with only partially- translated Excel tables. Does the Registration Control Officer have the right or responsibility to require a complete English translation?

Files needed here Share project information with Ukrainian business students –Time-sensitive –Sustainability staff, not project coordinator Problem: no Ukrainian text to be found –Proposal was drafted in in Ukrainian; –There was a file labeled 2224_ua; but, that turned out to be blank template; –Search of floppy disks did not turn up document – Had to contact PM and ask him to resend doc

Tech Description.UA Document, according to database, appears to exist. However, this file contains only Blank Template; real doc may be on PCs computer.

Joint project 3513_P_RU and 3513_P_UA.doc ? ? Should default be English? Near identical for _P_UA.doc

Questions Do we care if we lose or misplace the Ukrainian / Russian language versions of project proposals? –Staff here cant work with original language, if files arent readily accessible –If yes, then DEDs should convey to the Steering Committee their concern – and develop a standard repository for those documents. Do we care if we send Western Reviewers documents in a combination of Ukrainian and English? –Reviewers cant evaluate workplan / equipment requests in Ukrainian –If yes, then DEDs should work with Registration Control Officer / Ministry to clarify procedure and screen proposals.

Recommended Action Points for DEDs responsible for Proposals Direct IT to modify STCUPS output for non-Ukrainian projects to include only required files Task staff to improve letter to scientists Designate review mechanism/authority –ensure IT-originated changes are proofed & acceptable –Provide point of contact for other STCU groups that touch on proposal processing (training, outreach, sustainability) Work with IT to modify website to enable scientists to readily see links to existing on-line application process Assess potential impact –if local language files are lost –if reviewers receive incompletely translated proposals