MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
January 11, Data Format for MICE Trackers Tracker Data Readout Basics Preliminary Tracker Data Format and Suitability for VME Data Transfers. Questions.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
AFE II Status. Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
R. Rucinski, Fermilab Feb. 9, 2005 Project Status 2 cassette VLPC Cryostat Russ Rucinski - Fermilab This presentation will probably involve audience discussion,
Tracker Summary Makoto Yoshida Osaka Univ. MICE Frascati June 28 th, 2005.
Mark Raymond /10/051 Trip-t testing brief status report test setup description - hardware and software some very early results.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
MICE Phase 1 Koji Yoshimura KEK June
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Trip-t testing progress report
WBS 1.2.8: AFE II Status and Plans Alan Bross for the DZero Central Fiber Tracker Group DZero Run IIb Detector Upgrade Director’s Review July 15, 2004.
Fermilab Silicon Strip Readout Chip for BTEV
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
TPC electronics Status, Plans, Needs Marcus Larwill April
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Tracker Summary M. Yoshida (Osaka Univ.) MICE 2005.Feb.12 th.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
CTA-LST meeting February 2015
AFE II Status First board under test!!.
Muon Recording Studies and Progress for the MICE Tracker
BESIII EMC electronics
Commissioning of the ALICE-PHOS trigger
RPC Front End Electronics
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005

Analog Front End Board for VLPC Readout 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for L3 and offline 8 photons 50 fC Central Fiber Tracker cylinder

 First AFEII prototype is now on the cryostat and taking data.  Next 4 slides show the AFEI problems that AFEII is designed to solve: u SVX saturation. u SVX tick to tick ped variation. u DISCR to SVX data cross talk. AFEII prototypes

AFEII proto: Results  Biggest concern is SVX saturation  Test: inject huge LED pulse, (7V, 80ns) measure small pulse in the same superbunch 3pe in xing 20 -> readout > 100pe in xing 5 Picture from AFEI

AFEII proto: Results  Tick to tick variation in pedestals. u Reset is identical every xing, so there is none. The sum of data from xing 5, 8, 11, 14, 17, 20 all 64ch from module 1 PMR: I included the individual xing plots in spare slides section, if you wish to check in more detail.

AFEII proto: Results  Discr to ADC xtalk: it is impossible to make a plot like this with AFEI Plot from AFEII with 30% discr occupancy. Compare to AFEI with 32% discr occupancy one chan…

AFEII proto: Results  Discr to ADC xtalk: it is impossible to make a plot like this with AFEI Plot from AFEII with 30% discr occupancy. Compare to AFEI with 32% discr occupancy many chan…

4) AFEII-t design  Was on hold until AFEII prototype was up– now starting integrate lessons from AFEII prototypes.  Stefano Rapisarda is joining this effort.

AFE II/AFEIIt Status  Recently concluded Dzero internal review u awaiting report/recommendations of the committee  Progress on a number of fronts: 1. AFEII on the cryostat and taking data. (same cass. as used for AFEI studies by Juan and Peter) 2. Better understanding of TriP-t, studies in progress, needed manpower now on board. 3. AFEII-t engineering help identified and on board.

Trigger Pipeline Chip with Time Stamp Tript

Currents to opamps, switch settings, feedback settings set with on-chip DACs To date, parameters are based on what worked on the TRIP chip Adjustment of these parameters could improve performance further 200f 1.5p 4.0p

Digital (DISC) out

 Saturation occurs ~130fC; expected at ~90fC  Residual seems related to DC level of ~40mV which also appears on T_OUT. Suspicion rests upon output drivers to analog pipeline  Chip designer has recently suggested a “parameter” change that he believes will help  Might make identification of individual p.e. peaks harder (?)  Noise is ~3mV Gaussian, shown as error bars on plot and is the same for the T_OUT line 8 40k gain 16 p.e. 1 p.e. A- pulse

Does t affect A ? 100fC at “Sweet spot” 30fC, 60nsec later

Does t affect A ? Existence of analog time-info pulse lowers the analog amplitude-info pulse by 3 1 / 2 ~ 4 % of the size of the time-info pulse Same if time-info pulse lowered by changing the actual time or by changing the current integrated to measure the time Ratio of pulses from adjacent fibers with similar time data sees smaller effect than individual pulses will

Pulse Time (T_OUT) Adjustment of current through integrating circuit permits gains ranging from ~2 to ~20 mV/ns t - pulse mV

Time Walk  t /  Q  0.40 mV/fC, corresponding to  44 ps/fC T_OUT has large pulse-to-pulse fluctuations below ~20fC  2 gain over threshold Digital discriminator set to fire ~4f in this test Only been able to look carefully at 2 channels so far, but they are similar Noisy Data A MIP at 90  corresponds to about 50fC (8 photoelectrons collected)

What Happens Next  Impact of A -pulse nonlinearity should be quantitatively assessed, should test with “parameter” change not solve the problem  Chip order in early March will probably be submitted with multiple versions, so it would be prudent to have older pipeline output driver, or other redesign, as one of them - should not impact schedule  Further probing of parameter space will provide info re. optimal running conditions  Documentation needed

TriPt - Conclusions  TriP-t is fully fuctional and basically performs as expected  Answers to specific questions:  t -info pulse lowers A -info pulse 3 ½ ~ 4% of t -pulse; effect on A ratio in adjacent fibers ought to be even smaller u Time pulse gain setable from 2 ~20 mV/ns u Time output walk ~44 ps/fC for pulses with ~2 or more p.e.  Further work is warranted for:  A -pulse nonlinearity  Optimization of parameter space  Documentation

LVSB Board VME LVDS SERDES Buffer (Serializer-Deserializer)

VME LVDS SERDES Buffer (VLSB)  The D0/MICE VME64 LVDS SERDES Buffer (D0 VLSB) is a VME64 single wide 6U module SERDES (SERializer- DESerializer)  It can be used for Read out and testing the AFEII boards. The module is a custom LVDS  SERDES Buffer with 4 LVDS inputs channels and can be operated stand-alone with minimal additional hardware.  The design allows system expansion to multiple modules.  A D0 VLSB module can receive/generate trigger signals over two Lemo connectors on the module front panel.  A normal test system configuration consist of a VME 64 subrack where slot 1 is occupied by a VME subrack controller and the D0 VLSB cards will occupy one or more of the remaining slots.

VME LVDS SERDES Buffer (VLSB)  The Boards (6) are now complete and ready for test and integration into the MICE DAQ system (KEK and final system if we choose to do so)

VLSB System Architecture  The VLSB standalone system can be expanded to a set of several cards hosted by 6U VME64Xsubrack.  In this case, the cards can be individually accessed though their RS-232 interfaces. A set of four module can be synchronized through the use of the front panel board-to-board connectors.  All cards in the system can be accessed through a VME subrack controller that can be hosted in the subrack slot 1. This controller can provide the VLSB cards with additional interfaces to the outside world (Ethernet, MIL-STD 1553,...).

Board Block Diagram

VLSB – AFEIIt Interface

Data Rate Capabilities  Roughly 200 MB/sec per LSVB board  VME64X standard transfer speed - to 160 Mbytes/sec.  With chosen FPGA, for MICE this system should accommodate muon rates up to 1000 per RF flat top.

VLPC Cryo Status Cryo-Cooler Version

Preliminary fit up - good

Status Summary  Real assembly should start this week.  Many miscellaneous parts ordered and most here. (o- rings, bolts, cryo grease, fittings, copper strips)  Compressor for Cryo cooler wired up. Extending control cables.  Run Cryo cooler only – week of 2/21?  Cool cassettes – week of 2/28 or later?  Ship in March

Pictures – Assembly stand

Issues still to address  Control system details u Sensors, controllers, heater, feed thru’s  Safety Documents & approval u “Pressure vessel” is special u Need to size & obtain relief valves  Thermal link fabrication unknowns  Temperature & pressure stability u small gas volume u part of commissioning/test

Schedule details