MDS COMMISSIONING.

Slides:



Advertisements
Similar presentations
FUNCTIONS. FANCOILS CONTROLS ELECTRONIC BOARD - KCMS CMS - KCMS/PCM CMSPCM NEW WIRED CONTROL PANEL - KPCM.
Advertisements

Wall Mounted J series Troubleshooting.
Data Projector Setting Up/Connecting Laptop & Data Projector.
Installation of GMV ODU and IDU
Page 1 Updated by: Yap Boon Thiam Technical Engineer Date: 09/5/2012.
Operating Functions.
TECHNICAL TRAINING Mini Chiller Panel Controller V2.0.
WebStat™ Programming and Configuration of Thermostats.
WIRED TYPE MULTI ZONE FANCOIL CONTROL SYSTEM MODEL : WSF- 700 SYSTEM
| We make life more comfortable 1 ERV-24 Technician Settings & Operating Manual Protected by one or more of the following.
Digital Non-Programmable Thermostat. Digital screen Setpoint indicator- Appears when the Setpoint temperature is displayed Low battery warning Temperature.
Trane Variable Water Flow System
Page 1 MDS Installation. Page 2 Contents  Introduction  Outdoor Unit Installation  Indoor Unit Installation  Refrigerant Pipe Work  Gas Charge 
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
= ( es ) 2 energy savings. 53% SAVINGS* THAN OTHER LEADING INVERTERS! Best Energy Savings! High 11+ EER CASSETTE INVERTER FLOOR STANDING INVERTER HIGH.
① The output signal of a room thermostat is ON or OFF according to changes of room temperature ② The power supply to a motorized valve is ON or OFF according.
In this presentation you will:
TECHNICAL TRAINING 2008.
Refrigerant Amount Adjust Mode TGMU, THMU, TJMU and TKMU TGMU, THMU, TJMU and TKMU.
Astro Tech LC-6 Digital Chronometer
© 2012 Rinnai America Corporation Rinnai Circ-Logic (RCL)
Programming instructions.. To set the time Pool pump and heat pump must be ON. Pictrue 1Picture 2Picture 3 1.Press, the hour will flash (picture 1) 2.To.
2-Stage Heat Pump Defrost Options Defrost options: –30, 60, 90, 120 or Auto (Infinity/Evolution only) Defrost initiate temp: 32° F Defrost terminate temp:
Introduction ► Scope:- Service Diagnostics Routines can use for XXL, Side by Side products with STEALTH user interface with single evaporator fan product.
MDS Smart Commander.
On/Off Temp Holiday Select Fan Air clean Operation Auto SwingRoom Temp Week Select SET/CLR Hour MIN Timer Program Set Fan Speed Jet Cool Cancel RESET E_Heater.
VGD-33 single unit upgrade to parallel system All single units must work properly Installation of the external cables and power cords: all should be connected.
Wireless Remote Controller (MR-AH01/BH01) HQ SE.  On/Off control  Air flow control  Temperature setting  Filter reset  Louver Control  Simple ON/OFF.
TECHNICAL TRAINING INVERTER-Y
CLIMAPIU’ HE. 1-FS: dirty filer; the clock of the microprocessor gives this alarm after 250 hours operations. The unit keep working even with the.
Continue The information provided in this training module covers the schematic flow charts for all ovens and ranges that utilized a preheat board, Self.
MDS Monitoring Software. Page 2 Contents  Introduction  User Interface  Service Personnel Interface  System Requirement  Demonstration.
EEV-KIT General Information. Preliminary information, all of contents are subject to final confirmation by MHI 2 Contents 1. What it EEV-KIT 2. What is.
For Multiple refrigeration system
Chiller Panel Controller. Objectives What is the Features of Chiller Panel Controller What is the Features of Chiller Panel Controller How to use Chiller.
BAKE BROIL - SELECT PROGRAM - CONV BAKE CONV BROIL SELF CLEAN On any diagram screen, double click any of the following components to bring you to a description.
EEV-KIT For Single refrigeration system. Preliminary information, all of contents are subject to final confirmation by MHI 2 Contents 1. Single refrigeration.
Page 1 Air-cooled Inverter Product Range Updated by: Yap Boon Thiam Technical Engineer Date: 14/5/2012.
TECHNICAL TRAINING 2007 CONTROLLER PROGRAM UPGRADE.
Midea WIFI air conditioner connection
TECHNICAL TRAINING SMART COMMANDER System Requirements CPU : 800MHz and aboveCPU : 800MHz and above Memory : 256MB RAM or HigherMemory : 256MB.
Zoning Hydronic Systems. Zone Control Divides the Space to be Heated 1.Each with its own heating needs and control systems 2.There are several reasons.
TECHNICAL TRAINING INVERTER-Y
Fan Coils Units Control
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
Intelligent Boiler Sequencing
HVAC Wiring diagram 5 channel output (5A relay) Speed: High/Medium/Low Mode: Cooling / Heating /Dehumidifier HVAC is a module specially for Air Conditioner.
MCQUAY DIGITAL SCROLL SYSTEM
Service Section Technical Training December 2005.
Introduction of New Wall Mounted AVS 18-24URCSBBA Commercial Air Conditioning Dept
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
H aier Oversea Customer Services 1.Not start 2.Poor cooling 3.Not blow air when powered on 4.Shut down frequently and automatically 5.Poor heating 6.Indoor.
We apply 120 VAC to the HM Unit (Remember to check polarity!) Our primary step down T/X provides power to terminal “X” and “COM” on the ignition control.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
USER GUIDE TEMPERATURE CONTROLLER TR-2006 Hot runner temperature controller ShenZhen TanRex Electronic Co.ltd.
Service Section Technical Training. Sequential Controller SQ 1.0.
Refer to Service Manual for details Fault codes. To retrieve fault codes from the remote controller Press the ‘CHECK’ button for approximately.
2013 CHIGO Product CHIGO CMV VRF Control System.
Duct Free System.
VRF Trouble Shooting 采用midea通用PPT模版, 参考《公司简介》PPT.
Comparison between L – Series / K - series
CHIGO VRF System Commissioning.
7. Test operation.
AHU connection kit.
DC Inverter Air-cooled Chiller Aqua Tempo Super II Series
B. Munkhbayar BEEC/SCEA/MUST
Overview of HVAC control panel
MDS Smart Commander.
BOILER PROTECTION AND INTERLOCKS
Presentation transcript:

MDS COMMISSIONING

COMMISSIONING Address Setting A-series outdoor unit PCB DIP switch S2 A-series outdoor unit PCB K1, K2 Button Press K2 for 5 seconds to enter parameter set mode LCD display “- - - -” Enter the password, 0755 Set the no. of indoor units DIP switch S1

COMMISSIONING A-series outdoor unit PCB 4 ON (1) ON (1) S1 OFF (0) 1 2 3 4 5 6 7 S1 ON (1) OFF (0) Capacity Reserved EXV Initial Opening 1 2 3 4 5 6 7 8 S2 ON (1) OFF (0) Outdoor Address Reserved

COMMISSIONING Address Setting B-series outdoor unit PCB DIP switch S1,S2

COMMISSIONING B-series outdoor unit PCB S1 S2 S3 ON (1) OFF (0) 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 Outdoor unit capacity No. of indoor units Outdoor address Cooling / Heating EXV initial opening MDS _A/B Master / Slave

COMMISSIONING Address Setting Indoor unit PCB DIP switch S2

COMMISSIONING Indoor unit PCB ON (1) OFF (0) ON (1) OFF (0) 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 7 8 Auxiliary Heater 1 Auxiliary Heater 2 Reserved Address Capacity Model Water Pump

COMMISSIONING Setting SLM Controller LCD Display Receiver ON / OFF Temperature Up / Down Fan Mode Heater / Swing Timer Sleep

Press “CLK” again to confirm COMMISSIONING Handset Setting SLM Controller Real Timer Setting Press “CLK” Day Setting CLK Press “Δ” or “▽” to change the day setting (Monday ~ Sunday) * Press “CLK” again to confirm *Note: If no action within 5s, it will return to main page

COMMISSIONING Handset Setting SLM Controller Real Timer Setting After day setting is confirmed LCD real time blink CLK * Press “Δ” to increase 1 hour Press “▽” to increase 1 minute Press “CLK” again to confirm *Note: If no action within 5s, it will return to main page

COMMISSIONING Handset Setting SLM Controller DIP1 – Temperature Unit Setting ON - °F OFF - °C DIP2 – Auto Start Setting ON - Available OFF - N/A DIP switch

COMMISSIONING Test Run Check the power supply between outdoor unit and switch board. 1. 220V power supply (L / N) 2. 380V power supply – make sure the phase sequence are correct, L1(R) L2(S) L3(T) Outdoor unit powered ON 6 hours in advance to preheat the crankcase heater. If main power is turned OFF for a long time, the system cannot run immediately after power resume. (Need to wait for 2.5 hours)

COMMISSIONING Test Run Indoor unit checking:- Outdoor unit checking:- Continue… Indoor unit checking:- 1. Check the power supply wiring and signal wiring in each indoor unit. 2. If the signal wire and power wire are cross-connected, all PCB will burn. 3. The signal wires must be in different colour for different terminal in order to avoid misconnection of polarity. 4. Check the address setting of the indoor unit:- – Make sure the address settings are correct. – Each indoor unit should have different address. Outdoor unit checking:- 1. Check the no. of indoor unit settings are correct. 2. Make sure the capacity settings are correct. 3. Make sure the Master and Slave unit setting are correct (if applicable).

Thank you