Boris Sharkov FAIR Joint Core Team

Slides:



Advertisements
Similar presentations
Mass and Half-Life Measurements of Stored Exotic Nuclei
Advertisements

Investigation of short-lived nuclei using RIBs
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
John Womersley The Science and Technology Facilities Council and Nuclear Physics John Womersley Director, Science Programmes October 2008.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
Decay Spectroscopy at FAIR Using the Advanced Implantation Detector Array (AIDA) presented by Tom Davinson on behalf of the AIDA collaboration Tom Davinson.
The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
NuSTAR, FAIR & the UK Community DL, October,2006.
University of Surrey Nuclear Physics Research Group Nuclear theory group (2 Professors (Al-Khalili & Tostevin) ; 2 Senior Lecturers (Stevenson & Barbieri),
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
Hans Geissel, Pisa05 Precision Experiments with Exotic Nuclei at Relativistic Energies Hans Geissel, GSI and JLU Giessen  Introduction  Precision Measurements:
Outlook towards future Polish participation in the new Accelerator Facility Tomasz Matulewicz Warsaw University.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Status of the FAIR Project Boris Sharkov FAIR Scientific Director GSI AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
Working Group 5 Summary David Christian Fermilab.
The FAIR Chance for Nuclear Astrophysics Elemental Abundances Core-collapse Supernovae The neutrino process The r-process nuclei in -Wind Neutron Stars.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
The Active Target for R 3 FAIR Peter Egelhof GSI Darmstadt, Germany ACTAR Workshop Bordeaux, France June 16 – June 18, 2008 FAIR.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR Status Report CBM Collaboration Meeting March 9, 2005 J. Eschke,
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
Experiments with Radioactive Beams at GSI and FAIR Thomas Aumann May 21st, th INTERNATIONAL SPRING SEMINAR ON NUCLEAR PHYSICS NEW QUESTS IN NUCLEAR.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Facility for Antiproton and Ion Research
UK Research in Nuclear Physics P J Nolan University of Liverpool.
FAIR (Facility for Antiproton and Ion Research) (Darmstadt, Germany) low-energy cave MeV/u fragmentation/fission ~1GeV/u fragment separator 350m.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland Spain.
Closing remarks Key qestions: Location of SHE shell and SHE nuclear structure Atomic properties and relativistic effects Breakdown of Mendelejev systematic.
Front end electronics and system design for the NUSTAR experiments at the FAIR facility Presented by Ian Lazarus on behalf of NUSTAR collaboration FEE.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
The Active Target for R 3 FAIR Peter Egelhof GSI Darmstadt, Germany ACTAR Workshop Bordeaux, France June 16 – June 18, 2008 FAIR.
LEB Meeting Status of the LEB (J. Gerl) Physics opportunities at the LEB (D. Ackermann) Latest news on the layout of the buncher/spectrometer (J. Winfield)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
Status of LEB J. Gerl GSI – Darmstadt, Germany NUSTAR Week 2011
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
The FAIR Project Physics Programme of FAIR CBM PANDA NUSTAR
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
ЭКСПЕРИМЕНТЫ НА РЕЛЯТИВИСТКИХ РАДИОАКТИВНЫХ ПУЧКАХ
FAIR – the Universe in the labororatory
Presentation transcript:

Boris Sharkov FAIR Joint Core Team Status of FAIR Boris Sharkov FAIR Joint Core Team

fore-front research in physics and applied sciences FAIR Baseline Technical Report 2005 Nuclear Structure Physics and Nuclear Astrophysics with RIBs Hadron Physics with Anti-Proton Beams Physics of Nuclear Matter with Relativistic Nuclear Collisions Atomic Physics Plasma Physics and Applied Science with highly charged, highly Bunched ion Beams and low energy anti-protons + Accelerator Physics FAIR will provide worldwide unique accelerator and experimental facilities allowing for a large variety of fore-front research in physics and applied sciences SIS 100/300 SIS 18 UNILAC Radioactive Ion Production Target Super FRS HESR Anti-Proton Production Target CR FLAIR RESR NESR 100 m 27 March 2017 2

Modularized Start Version FAIR – Facility for Antiproton and Ion Research Helmholtzzentrum GmbH GmbH Modularized Start Version Boris Sharkov FAIR Joint Core Team Leader GSI Helmholtzzentrum fuer Schwerionenforschung Observers Austria India China Finnland France Germany Greece UK Italy Poland Slovakia Slovenia Spain Sweden Romania Russia

Development of Project Structure 2005 Entire Facility BTR 2007 Phase A Phase B SIS300 + e-ring 2009 Module 0 SIS100 Module 1 expt areas HADES/CBM and APPA Module 2 Super-FRS fixed target area NuSTAR Module 3 pbar facility, incl. CR for PANDA, options for NuSTAR Module 4 LEB for NuSTAR, NESR for NuSTAR and APPA, FLAIR for APPA Module 5 RESR higher intensity for PANDA & parallel operations with NuSTAR and APPA Startversion Phase B

Project Staging 2005 idea: Staging of the project ( total cost 2005: 1187 M€) three stages defined by optimizing start of science 2007 idea: Staging of the project ( available funds 940 M€ ) two phases defined / matched with assured funding level Phase A = start-version, Phase B = all that‘s left out in Phase A 2009 idea: Modularized FAIR Start Version 2009 start with module 0 to 3, modules 4 and 5 (when funds available) 27 March 2017 5

Modules Module 0: Heavy-Ion Synchrotron SIS100, basis and core of FAIR, required for all physics programmes Module 1: Experiment halls at SIS100 for extracted beam diagnostics, HADES/CBM, APPA, and detector calibration. Module 2: Super-FRS for NUSTAR. Module 3: Antiproton facility for PANDA, providing further options also for NUSTAR Module 4: Additional low-energy caves for NUSTAR, NESR storage ring for NUSTAR und APPA, building for antimatter programme FLAIR Module 5: RESR storage ring for a higher beam intensity for PANDA and parallel operation with NUSTAR

Modular Version CBM APPA

Rationale for new Modularized Start Version (WP) Cost estimate for modular version presented by architects Detailed list of site related construction costs worked out based upon a new cost estimate in 2009 for the accelerator complex firm commitments of FAIR Member States Germany and State of Hesse announced to cover "site-dependent" construction costs outside FAIR project budget + 110 M€ !

Roadmap Driven by civil construction Aim for earliest commissioning of accelerators and respective experiments

The new Testing Hall for FAIR Boris Sharkov – Leader FAIR Joint Core Team

Roofing Ceremony in the new Testing Hall - September 3, 2009 Boris Sharkov – Leader FAIR Joint Core Team

Conclusions Based on recent cost estimates and firm commitments of FAIR Member States the MSV is elaborated Modules 0-3 ensure a physics programme that is still unique, competitive with great discovery potential all FAIR science communities can perform excellent physics from early on the facility can be smoothly upgraded towards the full version of FAIR facility JCT continues efforts on cost savings measures in cc, accelerator design etc… Setup of the international company proceeds in parallel

Thank you for attention ! FAIR will open a new research era in hadronic, nuclear and atomic physics as well as in applied science. The White Paper outlines a realistic path to achieve this goal. The Modularized Start Version provides an outstanding and world-leading research program for all scientific FAIR communities which will be further strengthened by the addition of further modules Thank you for attention !

Status in October: Revised costs: 1027 M€* Firm commitments: 1039 M€ (total 1104 M€ ) Challenge: define project for 1039 M€ that allows excellent physics and serves all communities ! This is beeing evaluated financially and scientifically *(2005 prices)

PAC on Nuclear Structure and Nuclear Astrophysics (NUSTAR-PAC): 667 authors 1.) Low Energy Branch (LEB) High-resolution In-Flight Spectroscopy (HISPEC)/ Zs.Podolyak/ Surrey Decay Spectroscopy with Implanted Ion Beams (DESPEC) + B. Rubio Valencia Precision Measurements of very short-lived Nuclei using an Advanced Trapping System for highly-charged Ions (MATS) K.Blaum Mainz LASER Spectroscopy for the Study of Nuclear Properties (LASPEC) P. Campbell Manchester Neutron Capture Measurements (NCAP) M.Heil FZK Antiprotonic Radioactive Nuclides (Exo+pbar) M. Wada Riken 2.) High Energy Branch (R3B) A Universal Setup for Kinematical Complete Measurements of Reactions with Relativistic Radioactive Beams (R3B) T. Aumann GSI 3.) Ring Branch (STORIB) Study of Isomeric Beams, Lifetimes and Masses (ILIMA) Y .Novikov SPNPI Exotic Nuclei Studied in Light-Ion Induced Reactions at the NESR Storage Ring (EXL) M. Chartier Liverpool Electron-Ion Scattering in a Storage Ring (e-A Collider) (ELISe) H. Simon GSI Antiproton-Ion Collider: A Tool for the Measurement of Neutron and Proton rms radii of Stable and Radioactive Nuclei (AIC) R. Krücken TUM