TGC Big wheel Sector assembly plan 12.23.2004 Tatsuo Kawamoto ATLAS workshop 2005.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Status of the ATLAS MM project
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Walls crates cables gas chambers electronics CERN adb.
Compressor status AWAKE Technical Board meeting 19 May 2015.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
UPDATE at SBU (Feb 24, 2009) 1 st Water Target SuperP0Dule (DaveF, Kevin, Scott) last week spent setting up hoses, pipes, water tank. Problem with unfiltered.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Status of NA62 straw electronics Webs Covers Services Readout.
LCG CCRC’08 Status WLCG Management Board November 27 th 2007
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
V. Bobillier1 Cable installation status.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Planning for Proto-DUNE PD Installation and Cabling at CERN
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
INSTALLATION SEQUENCE
SCHEDULE Nov 1st - Assembly Table Complete
nSW Alignment Installation
G. Carboni for the Muon Group
Renovation of the 45-year old PS magnets
10/month is the present production rate 2 FTE + sporadic contributions
Installation plans from mid 2005
Presentation transcript:

TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005

Some history 2003 Autumn : 1/24 full size frame in b188 trial of cable installation finalize cable length Feb 2004 : Idea of sector assembly tooling March 2004 : Chamber mounting tool test operation at CERN Summer 2004: Realistic installation of cables on the 1/1 model. documentation Trial of T7, etc handling at CERN(need further study Oct. 2004: Signal cable preparation at CERN

Taking into account considerations and constraints due to - availability of space as a function of time - delivery of major components (planned, possible) - installation at the pit - assumed assembly speed of 1 sector/2 weeks/site neglecting for the moment worries like - we don’t know yet the detail of TGC2/3 services assembly (we have better idea about TGC1: full size mock-up) and assuming we still have reasonable time to learn - with TGC-1A

Part of 180Full C BW side C?BW side A? The schedule might look like 1-A2-C3-C2-A3-A1-A Beam pipe closure tilt table H-table Wedge test? spokes rim transv.bar A-frame, V-stand storage Bracket 1-C/A site-1 site-2

b180 2nd site ( somewhere ) 1st site Assembly + storage Surface assembly site

Horizontal + tilt Vertical storage

In order that it somehow works Space of the 1st site available (EC cal must move a bit) Major components are/will-be there in January 2005 Tooling should arrive as planned Status : 1 tilt table mid. January H-table mid. Feb or later A-frame, V-stand early March (to decide how many) 2nd tilt table early March TGC mounting tool (adapter for all chamber types): will come Cables, PS-pack, tubes, DCS equipments Test equipments: gas, electronics Man power : many things to do from January for the detector group, be ready in particular in February/March to establish many things. The 1st sector TGC1-A

In order that it somehow works Space for the 2nd site from April Components have to be delivered in time Status : complicated, but it should work Bracket : Need 1/2 of 1-C by mid March, 1/2 of 1-C by mid April, the rest (1-A + tooling) by end June Status : price inquiery launched. Need conscious effort. Storage: space and tooling Status : storage tooling 3-d desgin made, gave go-ahead 10 more PS packs, and then 20 more PS packs by April DCS sensors, cables TGC1-C + 1-A series production

In order that it somehow works Components have to be delivered in time Status : Design not completely finished Strategy for contract Services Status : Design not finished TGC2/3 series production Ideally, better start assembly as soon as 1-C are finished June/July But, unlikely to have all above be ready by then. Therefore 1-A is inserted after 1-C assembly. Nevertheless, fall 2005 is not very far !!

A few things which are not very clear. would like to learn with the 1st sector. need preparation/consideration by then. Assembly procedure in general Access to height: what kind of tools are needed Test procedure Gas : perhaps, fairly clear? Readout : starting to play with 5-10 PS-packs be prepared to 2 independent test set-ups ? (2 sites working in parallel)

Chamber installation max height to reach is ~7m (TGC-1, bracket T9) max height difference to access at a time is ~2 m (T9) max horizontal distance to access at a time is ~2.5m (T3/T6) height varies as a function of horizontal position Not obvious what kind of lifting device is optimum Scaffold, scissors lift, cherry picker just one, or combination of two?

stabilizer bar wall Wall of concrete blocks 5.1m 4.3m 1m The Storage tooling Random access is not foreseen : order of assembly is important

75cm 100cm With this pitch, the total width of storage for 6 sectors is ~ 12 m We will need access to Install PS packs Scaffold, scissors lift ? 4.3m 5.1m Height of PS-pack is ~5.7m Space is cm (depending on installation)

Preparation of TGC-1 surface assembly is in progress To watch TGC-2/3 very little or no margin in space-time Schedule of near Future mid Jan: TV conf with Israel (Meir, Erez, Ishino, TK, ….) End Jan: Chamber handling week (+Ochi, Tanaka, Ishino,…) End Jan.-beg.Feb : b180 preparation week (Meir, Erez, MI, TK,.. Mid Feb.: 3 technicians from Israel at CERN (+ Meir for a few week Man power 4 technicians ( payed by Japan) + 4 technicians ( payed by TCn) + physicists (to plan)

Future is not that far