Global Design Effort - CFS 10-15-09 CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Tom Lackowski Revised 10/12/2011
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler, J. Osborne, A Enomoto

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems Overview Review of Conventional Facilities Milestones Review of Conventional Facilities Milestones Main Linac Tunnel Configuration Comparison Main Linac Tunnel Configuration Comparison Update on Accelerator Design and Integration (AD&I) Effort Update on Accelerator Design and Integration (AD&I) Effort Life Safety and Egress Life Safety and Egress 2

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems CFS Responsibilities and Milestones The ILC R&D Plan Provides Milestones for CFS to Review Regarding Specific Aspects of the Reference Design to be Reviewed with Respect to Value Engineering for the RDR Design The ILC R&D Plan Provides Milestones for CFS to Review Regarding Specific Aspects of the Reference Design to be Reviewed with Respect to Value Engineering for the RDR Design The Accelerator Design and Integration Effort Is a Separate Overall Review of Alternatives to the Original RDR Design The Accelerator Design and Integration Effort Is a Separate Overall Review of Alternatives to the Original RDR Design As a Result of the AD&I Process (Eliminating the Twin Tunnel Scheme in Favor of a Single Tunnel Design) Life Safety and Egress is Also Being Reviewed as Part of the AD&I Process As a Result of the AD&I Process (Eliminating the Twin Tunnel Scheme in Favor of a Single Tunnel Design) Life Safety and Egress is Also Being Reviewed as Part of the AD&I Process 3

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 4 CFS R&D Plan Milestone Status Process Water Value Engineering Process Water Value Engineering  Completed Alternative Tunnel Configuration Alternative Tunnel Configuration  Preliminary Work was Completed by Hanson Engineering in July 2009  2-Day Workshop was Held at Fermilab on Aug 3-4, 2009 to Review Progress and Begin to Develop Cost Estimates  A Second 2-Day Workshop was Held at FNAL to Internally Review the Final Configuration Analysis and Cost Estimates on August 24-25, 2009 at Fermilab

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 5 CFS R&D Plan Milestone Status Life Safety and Egress Global Document Life Safety and Egress Global Document  Hughes and Associates has Reviewed the Alternative Tunnel Configurations and has Developed Life Safety and Egress Plans for Each Alternative  CLIC Document Is Complete  XFEL Document has been Translated into English  LHC Document is being Developed  Asian Document has been Completed  All Individual Documents will be Compiled into a Single Comprehensive Document with an Executive Summary Which will Describe Commonalities and Distinctions in the Various Reports The Executive Summary will be Added to Complete the Document Prior to the AAP Review in January, 2010 Surface Building Criteria Review Surface Building Criteria Review  Not Scheduled for Completion Until July, 2010

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 6 Main Linac Tunnel Configurations Tunnel Cross Sections are Complete Tunnel Cross Sections are Complete Detailed Cost Estimates Based on the Americas Region Criteria for Each Alternative are Complete Detailed Cost Estimates Based on the Americas Region Criteria for Each Alternative are Complete

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems AD&I Progress to Date The First Collaboration Wide ILC Accelerator Design and Integration Meeting was Held at DESY on May The First Collaboration Wide ILC Accelerator Design and Integration Meeting was Held at DESY on May The First Conventional Facilities and Siting (CFS) Group Meeting was Held at SLAC on July The First Conventional Facilities and Siting (CFS) Group Meeting was Held at SLAC on July A Second Meeting is Planned at the Daresbury Laboratory, UK on September 3-4 A Second Meeting is Planned at the Daresbury Laboratory, UK on September 3-4 The ALCPG 09 Meeting, Held in Albuquerque NM on The ALCPG 09 Meeting, Held in Albuquerque NM on Sept 28 – Oct 2, Also Devoted a Considerable Portion of the Agenda to the AD&I Effort The Final Collaboration Wide AD&I Meeting will be Held at DESY on Dec 2-3 The Final Collaboration Wide AD&I Meeting will be Held at DESY on Dec 2-3 The AD&I Effort will Culminate in a Proposed Revised ILC Baseline Layout that will be Presented for Review to the ILC Accelerator Advisory Panel at Oxford on Jan 6-8 The AD&I Effort will Culminate in a Proposed Revised ILC Baseline Layout that will be Presented for Review to the ILC Accelerator Advisory Panel at Oxford on Jan 6-8 7

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 8 SB 2009 Working Assumptions (WA)

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems Progress on AD&I Central Region Layout While All Area Systems were Affected by Some of the Alternate Suggestions, Each Suggestion had a Definite Impact on the Conventional Facilities Layout While All Area Systems were Affected by Some of the Alternate Suggestions, Each Suggestion had a Definite Impact on the Conventional Facilities Layout New Criteria Regarding the Various Area System Design Changes was Needed from Each Area System in Order to Develop an Integrated Machine Layout New Criteria Regarding the Various Area System Design Changes was Needed from Each Area System in Order to Develop an Integrated Machine Layout The Weekly CFS Meeting has been Used for Direct Discussion with Area System Representatives to Finalize Area System Criteria and Layout Requirements The Weekly CFS Meeting has been Used for Direct Discussion with Area System Representatives to Finalize Area System Criteria and Layout Requirements Initial 2D Drawings are Being Prepared at FNAL with Consultant Support and will be Used as the Basis for the Revised Baseline Proposal Initial 2D Drawings are Being Prepared at FNAL with Consultant Support and will be Used as the Basis for the Revised Baseline Proposal 2D Drawings Consist of Overall Layouts, Larger and More Detailed Drawings of Specific Areas and Cross Sections Taken at Various Points to Analyze Beamline Locations and Conflicts 2D Drawings Consist of Overall Layouts, Larger and More Detailed Drawings of Specific Areas and Cross Sections Taken at Various Points to Analyze Beamline Locations and Conflicts 3D Layout Drawings are Beginning to be Prepared at CERN with Efforts at FNAL and KEK to Follow 3D Layout Drawings are Beginning to be Prepared at CERN with Efforts at FNAL and KEK to Follow 9

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 10

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 11

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 12 SB 2009 CFA WA Status WA 1 – Dependent on Technical Decision WA 1 – Dependent on Technical Decision WA 2a & 2b WA 2a & 2b  Americas Region - Klystron Cluster is Complete, DRFS Still to be Completed. Tunnel Diameter Still needs Optimization  European Region - Both Schemes are Being Worked on by Amberg Consulting  Asian Region - Both Schemes have been Investigated. Cost estimates Need to be Updated WA 3 – Undulator-Based e+ Source has been Incorporated into the New CFS Machine Layout WA 3 – Undulator-Based e+ Source has been Incorporated into the New CFS Machine Layout WA 4 – Low Power Option is Reflected in the New Area System Criteria and CFS Machine Layout WA 4 – Low Power Option is Reflected in the New Area System Criteria and CFS Machine Layout WA 5 – 3.2 km Damping Ring has been Incorporated into the New CFS Machine Layout WA 5 – 3.2 km Damping Ring has been Incorporated into the New CFS Machine Layout WA 6 – Single Stage Bunch Compressor has been Incorporated into the RTML and New CFS Machine Layout WA 6 – Single Stage Bunch Compressor has been Incorporated into the RTML and New CFS Machine Layout WA 7 – Coordination of the Central Region Beam Layouts are Being Developed and will be Incorporated into the New CFS Machine Layout. Specific Lattice Information is Still Needed WA 7 – Coordination of the Central Region Beam Layouts are Being Developed and will be Incorporated into the New CFS Machine Layout. Specific Lattice Information is Still Needed

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 13 Current Status of Codes and Regulations There are No Codes that Directly Address Underground Accelerator Complexes There are No Codes that Directly Address Underground Accelerator Complexes Most Initial Approaches Review Experience with Traffic Tunnels and Their Associated Guidelines and Regulations for Designs Most Initial Approaches Review Experience with Traffic Tunnels and Their Associated Guidelines and Regulations for Designs Most Recognized Codes Evolve Over Time and are Revised, Based in Part, in Response to Fire and/or Catastrophic Failures Most Recognized Codes Evolve Over Time and are Revised, Based in Part, in Response to Fire and/or Catastrophic Failures But Traffic Tunnel Requirements are Based on Fuel Loads that Far Exceed Those Found in Actual Accelerator Installations (i.e. Gasoline, Diesel Fuel, Oil, etc.) But Traffic Tunnel Requirements are Based on Fuel Loads that Far Exceed Those Found in Actual Accelerator Installations (i.e. Gasoline, Diesel Fuel, Oil, etc.)

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 14 Current Regional Laboratory Approaches Most Laboratories Rely on Examples from Previous Projects to Develop Initial Criteria for Life Safety and Egress Design for a New Project Most Laboratories Rely on Examples from Previous Projects to Develop Initial Criteria for Life Safety and Egress Design for a New Project This Initial Criteria is Then Supplemented by Consultant Review, Local Underground Codes where Available and Applicable as well as Regulations/Guidelines from Funding and Project Oversight Organizations This Initial Criteria is Then Supplemented by Consultant Review, Local Underground Codes where Available and Applicable as well as Regulations/Guidelines from Funding and Project Oversight Organizations While Most Regions do have Regulations that Directly Control Traffic Tunnel Design, in the Americas Region Two Distinct Codes have been Developed While Most Regions do have Regulations that Directly Control Traffic Tunnel Design, in the Americas Region Two Distinct Codes have been Developed – NFPA , Standard for Fixed Guideway Transit Systems – NFPA , Standard for Subterranean Spaces It Should be Noted that All Codes are Subject to Interpretation It Should be Noted that All Codes are Subject to Interpretation

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 15 Current Regional Designs Life Safety and Egress Issues and RF System Selection are Two of the Major Drivers of Main Linac Tunnel Diameter Life Safety and Egress Issues and RF System Selection are Two of the Major Drivers of Main Linac Tunnel Diameter All Three Sample Sites have Developed a Life Safety and Egress Design for the Main Linac Single Tunnel Alternative Based on Their Local Experience and Applicable Regional Regulations All Three Sample Sites have Developed a Life Safety and Egress Design for the Main Linac Single Tunnel Alternative Based on Their Local Experience and Applicable Regional Regulations All Three Regions have Reviewed both RF Alternatives and Selected the More Appropriate Alternative to Develop Their Regional Main LInac Tunnel Diameter All Three Regions have Reviewed both RF Alternatives and Selected the More Appropriate Alternative to Develop Their Regional Main LInac Tunnel Diameter A Global Safety Document is Currently Being Developed that will Gather Information from All Current Accelerator Projects, Including ILC, XFEL, CLIC, LHC and Project X, for Use as a Supporting Reference to any Current or Future Accelerator Design Project A Global Safety Document is Currently Being Developed that will Gather Information from All Current Accelerator Projects, Including ILC, XFEL, CLIC, LHC and Project X, for Use as a Supporting Reference to any Current or Future Accelerator Design Project

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 16 Asian and European Design Approaches Main Linac Single Tunnel is Divided into 500 m Long Segments (i.e. Compartmentalization) Main Linac Single Tunnel is Divided into 500 m Long Segments (i.e. Compartmentalization) Firewall and Fire Doors Separate Adjacent Segments Firewall and Fire Doors Separate Adjacent Segments Ducted Transverse Ventilation is Used for Fresh Air Supply and Return and Smoke Control and Exhaust Ducted Transverse Ventilation is Used for Fresh Air Supply and Return and Smoke Control and Exhaust The European Region Uses the Klystron Cluster RF System The European Region Uses the Klystron Cluster RF System The Asian Region Uses the Distributed RF System The Asian Region Uses the Distributed RF System Both Regions Currently Utilize a 5.2 m Main Linac Tunnel Diameter Both Regions Currently Utilize a 5.2 m Main Linac Tunnel Diameter

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 17 Americas Design Approach Based on NFPA 520, the Main Linac Single Tunnel Must be Divided into “Building” Space (i.e. Functional or Operation Space) and “Common” Space (i.e. Space Used Only for Exit Travel to the Surface) Based on NFPA 520, the Main Linac Single Tunnel Must be Divided into “Building” Space (i.e. Functional or Operation Space) and “Common” Space (i.e. Space Used Only for Exit Travel to the Surface) A 2 hr Firewall and 1-1/2 hr Fire Doors Must be Used to Separate the Two Spaces A 2 hr Firewall and 1-1/2 hr Fire Doors Must be Used to Separate the Two Spaces Alcoves are Also Required in the Common Space to Limit the Distance to an Exit or Area of Refuge to 610 m Alcoves are Also Required in the Common Space to Limit the Distance to an Exit or Area of Refuge to 610 m The Americas Region Currently Utilizes the Klystron Cluster RF System and a 5.0 m Main Linac Tunnel Diameter The Americas Region Currently Utilizes the Klystron Cluster RF System and a 5.0 m Main Linac Tunnel Diameter

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 18 Asian Region Tunnel Design

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 19 European Tunnel Design

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 20 European Tunnel Compartmentalization

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 21 Americas Region RDR and AD&I

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 22 Americas Areas of Refuge

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 23 Life Safety and Egress Summary Each Region has Developed a Sample Site Solution that Satisfies Local Life Safety and Egress Requirements Using Both Identified RF System Alternatives Each Region has Developed a Sample Site Solution that Satisfies Local Life Safety and Egress Requirements Using Both Identified RF System Alternatives The Development of a Single, Cost Optimized, Uniform Design for All Three Regions is Simple not Possible The Development of a Single, Cost Optimized, Uniform Design for All Three Regions is Simple not Possible – Different Geology – Different Tunnel, Shaft and Cavern Construction Means and Methods – Different Approaches to Life Safety and Egress – Preference of RF System Using the Regional Sample Site Approach for the ILC CFS Design Appears to be a Sensible Model for the Development of the TDR Using the Regional Sample Site Approach for the ILC CFS Design Appears to be a Sensible Model for the Development of the TDR The Final Life Safety and Egress Design for the ILC Cannot be Completed Until a Specific Site is Chosen and an Approving Authority ahs been Established The Final Life Safety and Egress Design for the ILC Cannot be Completed Until a Specific Site is Chosen and an Approving Authority ahs been Established

Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems Summary The CFS Group is Making Good Progress on R&D Plan Milestones and AD&I Efforts The CFS Group is Making Good Progress on R&D Plan Milestones and AD&I Efforts The AD&I Baseline Proposal will be Completed and Reviewed at the Oxford Meeting in Jan 2010 The AD&I Baseline Proposal will be Completed and Reviewed at the Oxford Meeting in Jan 2010 The CLIC/ILC Collaboration Efforts have Fundamentally Contributed to the Efforts for the ILC RDR Alternative Review Process as well as the Efforts to Develop an Alternative Baseline Proposal and the Eventual Baseline Design for the ILC Technical Design Report Due to be Developed in 2012 The CLIC/ILC Collaboration Efforts have Fundamentally Contributed to the Efforts for the ILC RDR Alternative Review Process as well as the Efforts to Develop an Alternative Baseline Proposal and the Eventual Baseline Design for the ILC Technical Design Report Due to be Developed in