NETPDTC AIM Enterprise Centralization NETPDTC AIM Enterprise Centralization Peg David, NETPDTC N621, AIM Tech PM Roy Hoyt, NETC N74 Functional PM/Resource.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

AIM Enterprise Central Site Planning
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
AIM Toolset Interfaces with Authoritative Technical Data
DoD Information Assurance Certification and Accreditation Process (DIACAP) August 2011.
Authoring Instructional Materials (AIM) Roadmap
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Feb 2011 AIM FRB Action Item Review 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Cost Effort Complexity Benefit Cloud Hosted Low Cost Agile Integrated Fully Supported.
Network Centric Enterprise Public Trust Information and Navy Enterprise Resource Planning Presented to the Small Business and Industry Outreach Initiative.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Customer Forum OTech’s New Web Publishing Service Web Services Section – April 29, 2015.
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
Lessons Learned from NETPDTC Central Site Implementations Lessons Learned from NETPDTC Central Site Implementations 23 Aug 11 Peg David, NETPDTC Project.
NETPDTC Hosting Support for AIM Tools NETPDTC Hosting Support for AIM Tools Peg David, NETPDTC N621, Tech PM Roy Hoyt, NETC N74 Functional PM/Resource.
Enterprise Peg David AIM Technical Program Manager NETPDTC N APRIL 2013.
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
Design Windows Media Services Infrastructure. Module 7: Design Windows Media Services Infrastructure Design Windows Media Services for live streaming.
Web Development Process Description
Maintaining a Microsoft SQL Server 2008 Database SQLServer-Training.com.
Server Virtualization: Navy Network Operations Centers
AIM Virtual FRB Meetings Sep, & 1400 Both Days.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
Academy : Red Hat Certified Engineer (RHCE) is an advanced level certification for Red Hat Certified System Administrator (RHCSA) and determines.
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
NETPDTC-hosted AIM Central Site New Users Guide
Status of AIM I/II and CPM/LO Module Software 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Ron Zinnato, NAWCTSD, AIM Lead S/W Eng.
ICT Standards and Guidelines The Structure of the Project Akram Najjar CNSI – Senior Consultant Director of InfoConsult.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
NETPDTC AIM Central Site and CPM Hosting 4-6 May 2010 Bruce Bare, NETC, CIO Denise Green, CNATT, N6 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
Microsoft Management Seminar Series SMS 2003 Change Management.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
UNCLASSIFIED Project Stepstone Dave Pierce9 December 2009 Deputy Director Army Spectrum Management Office HQDA CIO/G6.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Microsoft Virtual Academy Module 12 Managing Services with VMM and App Controller.
Office of Administration Enterprise Server Farm November 2004 Briefing.
NETC Authoring Instructional Materials (AIM) Roadmap February Bruce Bare.
Patrick Desbrow, CIO & VP of Engineering October 29, 2014
Academy : Red Hat Certified Engineer (RHCE) is an advanced level certification for Red Hat Certified System Administrator (RHCSA) and determines.
Academy : Red Hat Certified Engineer (RHCE) is an advanced level certification for Red Hat Certified System Administrator (RHCSA) and determines.
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Description of Revision
Academy : Red Hat Certified Engineer (RHCE) is an advanced level certification for Red Hat Certified System Administrator (RHCSA) and determines.
Managing Services with VMM and App Controller
Executive Project Kickoff
{Project Name} Organizational Chart, Roles and Responsibilities
Executive Sponsor: Tom Church, Cabinet Secretary
Executive Sponsor: Tom Church, Cabinet Secretary
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

NETPDTC AIM Enterprise Centralization NETPDTC AIM Enterprise Centralization Peg David, NETPDTC N621, AIM Tech PM Roy Hoyt, NETC N74 Functional PM/Resource Sponsor Bruce Bare, NETC N62 AIM Team: Tiffany Dombrowski, AIM PM Ron Zinnato, Lead Engineer 18 Sep 2012

Overview Enterprise Site AIM I/AIM II & CPM Rel 5.0 hosting Authority to Operate (ATO) Planning for eDMZ and SSC NOLA Transition Issues - Non-NETC Sites/Commands AIM Content Repository RIS/Requirements AIM IMI Library demos

AIM Central Site Hosting at NETPDTC NETC N74, N6 and NETPDTC Enterprise Migration Plan – Nearly complete migrating AIM content and processing to NETPDTC Citrix Metaframe-based servers Benefits Include: ‒ Simultaneous access by geographically dispersed Center and contractor personnel for collaborative development and maintenance ‒ Support for future centralized enterprise data mining for reuse, repurpose, and reference (R3) ‒ Significantly faster access to software updates ‒ Potential for automated workflow

CPM Hosting at NETPDTC Benefits Include: ‒ Enterprise production hosting and support vs. current contractor environment with limited server configuration and bandwidth ‒ Leverages NETC domain sys admin, database management, and information assurance expertise at NETPDTC ‒ Co-located with rest of NETC enterprise IT applications and off-site COOP support ‒ Secure access from both.mil and.com domains

CENTERPOCSCHEDULEUSER ACCTS CNATTATC HamiltonOct 10 – Apr CSFEDave DonnellyMar – Jun 1150 SSPLen RandelSep 1160 CIDJoe PekarskeApr - Jul 1216 (50) CSCSJessie HarrisApr – Jun 1275 (100) CSSMichael BuechelApr – Jun 1223 (20) CHAPSClaire OlonaMay – Jul 12 9 (12) CPPDRick BlyMay – Jul 1223 (30) CSFRoy WildeJul – Sep 1214 (20) SWOSD. Harrison-YoungsAug – Sep 12 8 (100) CEODDMarion ConleyAug – Sep 12 5 SLCPedro MooreAug – Oct 12 5 (200) Centers’ Transition Schedule Centers’ Transition Schedule

AIM ATO Status NETC/ODAA treating Central AIM as ‘new’ System standing up inside eDMZ As such, Interim Authority to Test (IATT) granted to build servers/test: 16 May – 30 Nov 2012 C&A Package in NETPDTC IA review, NETPDTC IA submission due to NETC IA 28 SEP C&A reviews: NETC IA max 45 days/ODAA max 90 days Deploying AIM Enterprise into PRODUCTION in eDMZ dependent on ODAA-signed ATO

Risk & Risk Management Impact Probability LowMedium High Description: 1.NETPDTC Shared Services demand vs capacity tenuous - competing high pri projects, IA mandates, DCC TF NOLA planning/support 2.Technical ‘gremlins’ & time to mitigate 3.ODAA 90 day review period Mitigation Plan: PMs/Task Leads monitor project tasks, schedules & technical mitigations closely; weekly status reviews Use lead/lag times to advantage; advancing schedule where feasible Continue liaison closely w/ IA review teams, adjudicate STIGs/Scans Goal: complete internal LOE NLT end SEP

AIM Central Site – eDMZ standup Benefits AIM when Application migrates to SSC NOLA eDMZ (FY14); technical mtgs forthcoming; identify roles / responsibilities Upon ATO receipt, Central Site will migrate into eDMZ; data/accounts/CPM Comms and Functional Test Plans coordinated with Centers / Users/AIM Team; identify downtime date; Production Release Review consensus ‘go live’ deploy into Production ‘ESS’ CITRIX accounts transition to ‘NTSS’ CITRIX accounts; no new form required; Centers validate their users/info on spreadsheet ; PM office to maintain SAAR repository Remaining Centers/accounts or new commands will transition directly into eDMZ

AIM Central Site – CPM eDMZ standup Production CPM remains hosted by AIMEREON until ODAA grants ATO for AIM eDMZ ‒ CPM Rel 5.0 server builds complete in eDMZ ‒ Conducted formal GAT working w/ AIM SSO ‒ CeTARS Web service, AIM enterprise data environment Web service, and PPP Repository integrated into CPM on NETPDTC server ‒ ATO allows.mil and.com access

Issue: Privilege Levels 5 levels implemented in Central Site AIM II per CNATT request 3 levels implemented in Central Site AIM I per SSP request CPM-style role/privilege structure tasked and funded by NETC N74/NAWCTSD – Via AIMEREON Task Order 0011 Task – Scheduled be on-line Dec 2012

Issue: Hosting Test Environment NMCI AIM users needed to test ongoing system enhancements as part of formal Govt Acceptance Testing (GAT) process Cannot install in-process AIM updates on local NMCI PCs nor access contractor-hosted virtual server to conduct tests NETPDTC to establish test instances of AIM I and AIM II to support ongoing requirement

Issue: Blocking Word Macros NMCI does not allow MS-Word macros to be enabled on NMCI desktop PCs once Win 7/Office 2010 is installed This poses crippling limitation on stand-alone desktop installations of AIM under NMCI Options for AIM Central site inside eDMZ?

Issue: Software Release Process CNATT Migration to AIM II Rel 5.0; currently using AIM 4.0 CNATT requirement to maintain local NMCI AIM II instances to support effective community-wide business process Discussion re NMCI certification process / schedule Impact of NMCI certification delay / push of Rel 5.0

Issue: NOFORN NNPI Affects primarily non-SWS undersea community – NAVSEA 07TR, SLC, SLC learning sites Stringent data handling controls re unclassified No Foreign Dissemination Navy Nuclear Power Information, mandated by NAVSEA 08 NETC/NETPDTC stood up SLC enclave on TRANET_C (NAS PCOLA) to host: ref matl, e-library, IETMs, NNPI content, course curriculum info, AIM content, NNPI/NOFORN, used by SLC DETs – How does this fit into AIM program from enterprise view? – Rqmt to host AIM Application on TRANET_C? For SLC / others? – Is TRANET_C interim option until NOLA data center migration? – SSC NOLA is certified for NOFORN data

Non-NETC Sites Implementation 1 Oct 11 - SSP TRIDENT AIM I Central Site instance transitioned from NAWCTSD to NETPDTC – fully operational – AIM I and LO Module production work NAVSEA 07TR AIM I Central Site instance TBD per decision re support for NOFORN NNPI data Other interested communities :  Navy Medicine  NAVSPECWARCEN (hosted by NAVSOC)  NAVRES  DANTES  Regional Maintenance Centers – Norfolk / San Diego  Naval Shipyards (hosted in Norfolk)

AIM Content Repository RIS Enterprise Requirements’ RIS for Ancillary Data Storage Area NETC needs Content Repository – store data/files – Configuration Mgmt Partner with existing ‘system’ Current link from NMCI seats to TRANET storage will be ‘broken’ – part of network migration – no reach back Notional Plan Expand current centrally managed ‘AIM enterprise’ content repository – accessible by CAC from.com/.mil with fully adequate storage space AIM Enterprise has multiple components: AIM I, AIM II, CPM, LO and ancillary file shares Configuration management (could be COTS product) needed; as well as business rules/governance DRAFT RIS distro’d to all Centers for collating requirements/comments

AIM Central Site Implementation Points of contact: ‒ NETC N74: Leslie Desenburg ‒ NETPDTC: Peg David; Christopher Stark/Charlie Odom (Metaframe Sys Admins) ‒ AIM team: Ron Zinnato/Steve Wicinski/Jim Ferrall Implementation resources including POC and schedules, planning document templates, and narrated help videos available on AIM information Web page: NETPDTC.ashx

CPM Hosting POCs NETC N74: Leslie Desenburg NETPDTC: Peg David / Bob Rayburn (Web Apps BH) AIM team: Ron Zinnato / Steve Wicinski / Mike Coyle / Jim Ferrall

AIM IMI Library Demos AIM I/II CPM Possible extension of Web-based PPP Repository derived from CPM code

Questions?

Backup Slides

Center Transition Planning Kick-Off Meeting with each Center POCs Centers review/assist draft Transition Plan, roles and responsibilities, POAM, Test Plan, Q/A’s Identify data transfer method; data quantity Review and understand ESS/CITRIX Account Creation Process – Form, SAAR, Center IAM role Review templates, lessons learned, forms, user guides – all found at:

Implementation Issue: Jobs Server A number of processes in AIM I/II take a long time to complete: e.g., Trainee Guide print preview, large course export, large course import Current NETPDTC implementation requires Central Site user to remain logged into Citrix session with CAC inserted in local workstation until process completed Jobs Server concept developed by NETPDTC and AIM teams would permit user to begin long-running process, transfer process to Jobs Server, end Metaframe session, and then log back into Metaframe later to retrieve product of long- running process completed on Jobs Server Functionality tasked/funded under new Task Order to AIMEREON

Implementation Issue: Job Server approach (contd)

AIM Central Site Architecture