SQAS 2011 – System changes Marc Twisk – SQAS Manager.

Slides:



Advertisements
Similar presentations
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
Advertisements

LA County Fire Department
Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006.
1 eVenzia Technologies Learning HTML, XHTML & CSS Chapter 1.
CONDO MANAGER The Leader in Association Accounting and Management Software Mailing Address: P.O. Box Charlotte, North Carolina Web Site
User Guide. Service Benefits  Full on-line management of client accounts  Paperless direct debit – no signatures required  Standing orders fixed not.
Internationalization An introduction to Drupal i18n Russell Blakeborough
Click on one of the chapters below to get more information or click the next button to start the web tutorial. 1.How to navigate on the homepage?How to.
The Division of Labor on a Campus Hosting Open Journal Systems and Open Conference Systems.
Using the Online Data System for Infant and Toddler IGDIs Dale Walker, PhD, Jay Buzhardt, PhD & Barbara Terry, PhD Juniper Gardens Children’s Project,
Introduction to Microsoft Office Web Apps with Jim Mollé Learn iT! Computer Software Training.
The Internet & The World Wide Web Notes
Page Thomas Willmann Urban Audit Germany a new way of data collection and data management.
Digital/physical content store. Summary Create a digital content/physical product web store based on osCommerce. Following items can be sold in the store:
AGent Demonstration Multi-Tier Solution Presented by Auto-Graphics Pomona, CA December 8-9, 2003 Version 2.0.
Lecturer: Ghadah Aldehim
Fusion GPS Externalization Pilot Training 1/5/2011 Lydia M. Naylor Research Lead.
Paper Study Dissemination Kit VISKOM Victor Karnaukhov.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
Training Course 2 User Module Training Course 3 Data Administration Module Session 1 Orientation Session 2 User Interface Session 3 Database Administration.
Blackboard 9.1 Presented by: Kim Shaver Associate Director of Educational Technology Assisted by : Alicia Harkless, Educational Technology Specialist,
NAMS Account Activation Training. 2 What is NAMS? The NASA Account Management System is NASA’s centralized process for requesting and maintaining accounts.
June 18, Agenda Welcome Updates and Reminders New CT.gov Site eGovernment Applications Questions & Comments.
IBM Maximo Asset Management © 2007 IBM Corporation Tivoli Technical Exchange Calls Aug 31, Maximo - Multi-Language Capabilities Ritsuko Beuchert.
DE&T (QuickVic) Reporting Software Overview Term
Tracking/Requesting Local Modification Session #5312 Bradley Smith University of Central Florida
DIGIT Directorate-General for Informatics DIGIT Directorate-General for Informatics EUSURVEY Creating online surveys DIGIT EUSURVEY SUPPORT.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
1 Semanticommunity.info Tutorial Brand Niemann December 7, 2010.
Database Systems: Design, Implementation, and Management
Internationalisation and Localisation Agenda Overview Configuration Language Packages Dictionary Files Default Tool Content Right to Left Support Translation.
EFQM Excellence Model & Levels of Excellence Learning Edge - July 05.
Portal User Group Meeting December 13, Agenda Introduction (Angela Taetz) Help Desk and Impact System (Craig Mollison) New Features (Craig Mollison)
Systems Development Life Cycle
Developments concerning the Community Plant Variety Office of the European Union (CPVO) online application system Meeting on the development of a prototype.
Part of the BRE Trust Protecting People, Property and the Planet BREEAM In-Use Sarah Young BREEAM In-Use Scheme Manager Ecobuild March 2012.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Training.
MyFloridaMarketPlace Vendor Performance Tracking Overview: Requestor Interface February 23, 2006.
Portfolio v1.0 Products. Benefits Scalable Fast Full interface via web services Fully integrated with Microsoft SharePoint Easy navigation Competence.
Portal User Group Meeting June 13, Agenda I. Welcome II. Updates on the following: –Migration Status –New Templates –DB Breakup –Keywords –Streaming.
Online Friends’ Community Presented by: Stuart Monaghan HND in Computing th May 2002.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
Level 2 IT Users Qualification – Unit 1 Improving Productivity Cory Street.
Copenhagen, 6 June 2006 EC CHM Multilinguality Anton Cupcea Finsiel Romania.
Release Preview Select2Perform ™ Enhancement Release Release Date: August 1, 2009 Audio Conferencing (USA): (1) Audio Conferencing (UK):
Demonstration of HKCAN database Outline Database system overview Software characteristics Database status.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
Software. A web site is a collection of web pages on a particular topic. A web page is a document written in HTML code. Web pages are linked together.
Department of Tourism Computerization Project Phase I Accreditation JULY 2009.
Web Center Training ©2003 Optimum Technology, Inc.
ADVANCED GOOGLE SEARCH TIPS AND TRICKS RACHEL LASZEWSKI.
Selling a Product or Service Website. Website Objective Developing or Designing a Website 40 Questions and Questionnaire with 30 questions are to be filled.
Irakli Garibashvili Director, National Scientific Library in Georgia.
Web Analytics and Reporting Michal Neuwirth Product Manager – Kentico Software.
Sitecore.net Training, Oct ECM 2.1 UPDATE 2 PART 1 CRAWL BEFORE YOU WALK.
Fab25 User Training Cerium Labs LabCollector - LIMS Lynette Ballast.
A Brief Introduction to RoMEO and the API Peter Millington Centre for Research Communications University of Nottingham RoMEO API Workshop, Repository Fringe.
Getting the Most outof EPM Converting FDM to FDMEE – What’s it all about? March 16, 2016 Joe Mizerk
# QUESTIONNAIRES ON COMPUTER AND TECHNOLOGY#. THE REFLECTION OF SERIK IMKB AOTML TECHNOLOGY WE PREPARED A QUESTIONNARE AND DID ALL AROUND THE SCHOOL.
Welcome to Excel Day 2 of 3 Dan McAllister
Online Training Course
To the ETS – Accounts Setup and Preferences Online Training Course
The revised Periodic Reporting Questionnaires: general features Alessandra Borchi Policy and Statutory Meetings Section UNESCO World Heritage Centre.
CMC Submission and Reviewing Process
CBSE 12th Result 2018, Check CBSE Board 12th Exam Results 2018
SharePoint Foundation 2010
WP 4 - Revision of Natura 2000 dataflow
To the ETS – Accounts Setup and Preferences Online Training Course
PROCEDURE TO UPLOAD THE SELF AUDIT IN “CONSTRUCTION21
New Northstar Software July 2018
Presentation transcript:

SQAS 2011 – System changes Marc Twisk – SQAS Manager

1 Agenda 1)Use of Pre-Assessment Document 2)Number of man days for an assessment 3)Combined assessments 4)Intermediate assessments 5)Website

2 Agenda 1)Use of Pre-Assessment Document 2)Number of man days for an assessment 3)Combined assessments 4)Intermediate assessments 5)Website

3 SQAS 2011 PAD Pre-assessment document: - Identification of the company including the to be assessed activities -To be filled in by the company -Excel document -To be send to the assessor

4 SQAS 2011 PAD Pre-assessment document: -Link between information and number of mandays / applicable questions -To be included in the assessors package -PAD and Pre-notification 3 weeks before the assessment -Information to be checked by the assessor during the assessment -PAD is available on the website

PAD 5

SQAS PAD Consequences of an extended PAD : -More detailed scope will be defined -More selection data will be available -Only the applicable questions will be chosen -Extended planning for the assessed company -More preparation time for assessors -More preparation time for observers 6

7 Agenda 1)Use of Pre-Assessment Document 2)Number of man days for an assessment 3)Combined assessments 4)Intermediate assessments 5)Website

Number of mandays -Depending on the information on the PAD -Is displayed at the end of the PAD -Time needed to perform a decent assessment -Is a guidance for the assessed company, the assessor, the user and the evaluator. -The assessor shall be questioned if time used for assessment differs from the man day table. -Most assessments stay at 2 days -Always 1,5 – 2 - 2,5 – 3 – 3,5 - … days 8

Display in the PAD 9

10 Agenda 1)Use of Pre-Assessment Document 2)Number of man days for an assessment 3)Combined assessments 4)Intermediate assessments 5)Website

General rules -Normally the 5 km rule stays valid -Combining assessments are possible if : -Same BU assessed for different questionnaires (as before) -Subsidiaries/operating sites (as defined) are assessed in the same cycle (new) -An assessment cycle (from the first day of the assessment till the last operating site /element) : maximum 30 days 11

Operating sites We consider an entity as a operating site if : -They have the same management system as the mother company. -The follow-up of the management system is performed centrally (internal audits, management review, goals, improvement plan, … ). -HR and training is managed centrally -Selection and evaluation of subcontractors are done centrally. -Purchase of equipment is done centrally. 12

Example Mother company 3 days Operating site 1 1 day Operating site 2 1 day Operating site 3 1 day 13 Assesment time – 2 days

Combined assessments 14 A « zero » on a question at an operating site can influence the outcome of the total company assessment.

15 Agenda 1)Use of Pre-Assessment Document 2)Number of man days for an assessment 3)Combined assessments 4)Intermediate assessments 5)Website

Intermediate assessments -The upload of improvement plans and adding comments to each individual question will still be possible. -A company can ask for an intermediate assessment (or validation of improvements by same assessor) within the validity period of the original assessment (three years). -This assessment is done by the same assessor as the original assessment. 16

Intermediate assessments -The pre-notification and assessment process is the same as for a full assessment. (with adapted documents). -The assessed company decides what chapters of the questionnaire will be re-assessed. But the original report can be used as a « starting document ». -The time used for this interdmediate assessment depends upon the chapters to be re-assessed. 17

18 Agenda 1)Use of Pre-Assessment Document 2)Number of man days for an assessment 3)Combined assessments 4)Intermediate assessments 5)Website

19 Major Technology Upgrade Complete new design and look-and-feel Multi-lingual user interface (not only translated questionnaires) Personalized login (independent from module or user type) ‘Unicode’ database which fully supports foreign local characters (including languages like Russian etc.) Full support for all major web browsers ‘Google like’ search options No ‘cookie’, ‘domain switch’ or ‘frame’ problems anymore

20 SQAS Home page

21 List of Accredited Assessors

22 List of Assessed Companies

23 Search Assessment Reports

24 Pre-Assessment Document (PAD) As mentioned before the new assessments will be based on a Pre-Assessment Document (PAD). The PAD will be distributed as a ‘protected’ Microsoft Excel template (.XLT) to the assessed companies via a downloadable file posted on the SQAS website. The PAD will be available in multiple languages.

25 Download Pre-Assessment Document

26 Transition period ‘ Old' questionnaire reports must be submitted with the current SQAS Assessor software. ‘New' questionnaire reports must be submitted with the NEW Pre-Assessment Document and NEW SQAS Assessor software.

Transition period -System available as from 1 April Assessable questionnaires in English version available as from 1 April Other languages (German – French – Spanish – Italian – Dutch) as from 1 July During the transition period of three months both the old system and the new one can be used. -After 1 July 2011 only the new system is available. 27