E-readout workplan & organization Successfully passed FDR – Draft report: ATL-IP-MR-0003ATL-IP-MR-0003 Mechanical baseline is defined Focus now more on.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
REDUCING BURDEN WHILE INCREASING QUALITY AT A GOVERNMENT AGENCY David A. Marker (Westat), Mary K. Dingwall (Westat), and Marla D. Smith (U.S. EPA) Presented.
S. Veneziano, Lecce 21 February 2002 RPC readout and trigger electronics status Lecce 21/02/2002.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
D.Websdale: RICH Meeting LHCb RICH group meeting: Wednesday 10th November, in B40-SS-C01 at 14:00. Agenda: 1. The Photodetector Panel’s proposition.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Management 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting Management March 9th,
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
ER Bundle “final” design D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
DPF 2013 R. Kass 1 P. Buchholz, M. Ziolkowski Universität Siegen OUTLINE Lessons learned… IBL/nSQP opto-board overview assembly experience radiation hardness.
University of Connecticut Virtual Lab Carl DiFederico, Shane Tobey, Kasim Ward Graduate Student Advisor: Qihang Shi Senior Faculty Advisor: Mohammed Tehranipoor.
David Nelson IBL Data & TTC Transmission Baseline February 25, IBL Data and TTC Transmission Baseline Presented by David Nelson
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
From Research Prototype to Production
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
NSQP Technical Meeting Monday 23/1/12 Mar Capeans 23/1/12nSQP Tecnical Meeting1.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
0 iNEMI Board and System Manufacturing Test TIG Update Phil Geiger 2008 IEEE Board Test Workshop Sep 08.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
Tracker Summary Alan Bross MICE CM October 10, 2007.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Tracker Review –see technical board review web page: MICE -> technical board -> TB review pageMICEtechnical boardTB review page –Present: Tech Board: PD,
Michał Dwużnik, for the SCT collaboration
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
July 17, 2013 CERN T. Flick University of Wuppertal.
PRACTICAL ELECTRONICS MASTERCLASS ASSEMBLY PRESENTATION (MR BELL) 1.
K.K. GanUS ATLAS Pixel Meeting1 Opto-IC/Board K.K. Gan The Ohio State University WBS & 4 July 9, 2003.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
Oct/07/2010Pixel PP0 opto replacement issues1 1 1 PP0 Opto Replacement Issues Philippe Grenier, Martin Kocian, Dave Nelson, Marco Oriunno, Su Dong, Charlie.
David Nelson SQP E-board November 4, Pixel nSQP E-board Presented by David Nelson
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
TEL62 update Franco Spinella INFN-Pisa 28/3/2012 CERN- TDAQ WG.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
TE-MPE-EM: Subcontracting Raphaël Berberat
TE-MPE-EM Assembly workshop Betty Magnin 29/11/
TE-MPE-EM Design Office William Billereau 29/11/
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
© 2007 Her Majesty the Queen in Right of Canada (Canadian Food Inspection Agency), all rights reserved. Use without permission is prohibited. Summary of.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
DBM status and path to the prototype D. Giugni / INFN Milano D. Giugni nSQP meeting
Etienne CARLIER TE-MPE-EM Support Feedback from TE/ABT.
Activities Status and Plan for the week
LHCC referees’ questions, comments, requests
Production & Maintenance
Project Development Quality Program QA/QC – What does ODOT need?
Chapter 11 Production.
Limited Streamer Tube Project Summary
Mechanical Drafting Unit 1
Presentation transcript:

E-readout workplan & organization Successfully passed FDR – Draft report: ATL-IP-MR-0003ATL-IP-MR-0003 Mechanical baseline is defined Focus now more on electronics/system issues – This meeting (Thursday 6pm) is the primary forum Organization – Need to be efficient as a team – Clarify who is who & who does what … – Should improve communication/information sharing

Organization & meetings nSQP Production meetings (M.Capeans) Mondays 9-9:30 Technical team (M.Capeans) Project Engineer: D.Giugni Engineers, designers: S.Mikal, E.Richards M-technicians: V.Durasanti, P.Charra, B.Brunel, P.Nordahl Mondays 9:30 – 10:30 Assembly Team (D.Giugni) Assembly experts: V.Akhnazarov, M.Twasesky + 1 Assembly team: 6 technicians, 6 solderers (t.b.c.) QA (D.Dobos) Production Acceptance Testing: X.Pons Production DB: D.Muenstermann Readout Chain & System tests: J.Dopke, M. Keil nSQP New Components meetings (F.Dittus, D.Dobos) Thursdays Development team LVDS chip: M. Barbero Optoboard: K.K.Gan, Shane, M.Ziolkowski Optobox: R.Boyd, S.Welch E-board development: M.Kocian, D.Nelson, M.Oriunno Harness probing cards developers: O.Rhone, O.Dorholt Production Team e-board, ER PPO cable board, ER PP1 connector board, optoboard: R.Boyd, J.Dopke, X.Pons Optobox (motherboard, endboard): R.Boyd, S.Welch Optocomponentes: S.Gibson, J.Dopke, A.La Rosa VCSEL, DORIC Management meetings Thursdays 8:30-9:30 M.Capeans, F.Dittus, D.Dobos, D.Giugni, B. Di Girolamo (invited) Work in progress …!

nSQP electronic boards 1PP1 tapes 2PP0 Panels 3PP0 Flex 4E-Board (active board) 5ER PP0 Cable Board 6ER PP1 Connector Board 7OptoBoard (active board) 8OptoBox Motherboard 9OptoBox End-Board We have 9 different types of electronic boards – 2 of which with active components Can we produce prototypes of all boards at CERN ? We need a contact person at CERN for each board type – For coordination & follow-up with TE-MPE-EM – To assure complete and consistent documentation Design specifications QC specifications (inspection & test procedures, acceptance criteria) – To help organizing the full production …

nSQP electronic boards 1PP1 tapes 2PP0 Panels 3PP0 Flex 4E-Board (active board) 5ER PP0 Cable Board 6ER PP1 Connector Board 7OptoBoard (active board) 8OptoBox Motherboard 9OptoBox End-Board We have 9 different types of electronic boards – 2 of which with active components Can we produce prototypes of all boards at CERN ? We need a contact person at CERN for each board type – For coordination & follow-up with TE-MPE-EM – To assure complete and consistent documentation Design specifications QC specifications (inspection & test procedures, acceptance criteria) – To help organizing the full production …