Presentation is loading. Please wait.

Presentation is loading. Please wait.

TE-MPE-EM Design Office William Billereau 29/11/2012 1.

Similar presentations


Presentation on theme: "TE-MPE-EM Design Office William Billereau 29/11/2012 1."— Presentation transcript:

1 TE-MPE-EM Design Office William Billereau 29/11/2012 1

2 Fine-pitch photolithography facility - PCB manufacturing Industry Design Office Assembly Workshop Planning and subcontracting Technological and commercial choices Ordering, collecting components, tracking Invoicing Repair MPGD Design, manufacturing and assembly Structure 29/11/2012 2 2 staff/ 2 FSU1 staff / 10 FSU 4 Staff 8 staff/ 12 FSU

3 Design Office Mission Ressources Workload Quality Documents 329/11/2012

4 Mission Design of products Standard PCB 2 to 16 layers, rigid, flex, flex-rigid Related mechanical parts front panels, boxes Crates and racks Readout for MPGD Design of CAD libraries Schematic diagram Footprints 429/11/2012

5 1 team leader (staff) 8 technicians: the design of standard and special PCB (FSU) 2 technicians: in CAD libraries (100% FSU since 2010) 5 Resources 29/11/2012

6 6 Equipment CAD stations (Cadence, Altium) AutoCAD CAD to CAM software (Fabmaster, Aegis) 29/11/2012

7 Workload 7 General situation 25 jobs in progress, 15 in the pipeline Visibility max 2 months 29/11/2012

8 230*220mm 2-sided, PTH, BGA, QFN, 0402 1325 components 5500 solder joints 8 BE/RF - LHC 1 Turn Delay Feedback 29/11/2012

9 EN/EL Incomer Crate 929/11/2012

10 Quality Design rules: IPC standard Layout Librairies Crosschecks (librairie and layout) Internal reviews Feedback from manufacturing EDMS Release system 1029/11/2012

11 Documentation PCB manufacturing files (Gerber, drilling) PCB specification Detailed drawing of all mechanical parts Detailed drawing of harnesses Assembly documents for PCB (Drawing, BOM) Assembly documents for crates (3D drawing, BOM) 1129/11/2012

12 12 PCB manufacturing files (Gerber, drilling) PCB specification 29/11/2012

13 13 Detailed drawing of mechanical parts 29/11/2012

14 14 Detailed drawing of harnesses 29/11/2012

15 15 Assembly documents for PCB (Drawing, BOM) 29/11/2012

16 16 Assembly documents for crates (3D drawing, BOM) 29/11/2012

17 17 Assembly documents for crates (3D drawing, BOM) 29/11/2012

18 18 EDMS Release system Released status No more change possible Production allowed Available to subcontractor 29/11/2012

19 19 Any question? 29/11/2012


Download ppt "TE-MPE-EM Design Office William Billereau 29/11/2012 1."

Similar presentations


Ads by Google