ESS Update and Meeting Goals

Slides:



Advertisements
Similar presentations
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
UNICA RECTORS’SEMINAR Brussels 5th of June 2007 Poul Petersen Tel
Overview of District Operations Arkansas Conservation Districts Training Program Power Point 5.
THE EUROPEAN UNION Lesson 5
THE EUROPEAN UNION Lesson 5
Reichstag, 1945 Frankfurter Allee, 1945 A Climate for Radical Change:
Delegations IV KAM Prague 3rd to 7th September 2014.
European Spallation Source A World-Leading Centre for Materials Research and Life Science with Neutrons HEPTech Workshop 7 May 2013 James H. Yeck CEO ESS.
1 Framework Programme 7 Guide for Applicants
1 FP6 into perspective. 2 Understanding the context and exploiting the opportunities FP6 into Perspective The European Union.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Cultural Heritage and Global Change: a new challenge for Europe Working for strengthening the European Research Area Towards Joint Programming in Research.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
1 Health Exchange Proposal Delaware Health Care Commission May 5, 2011.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
Towards the new EGI governance model Arjen van Rijn (Nikhef) Chair Organizational Taskforce (EGI_DS and Local Host)
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Part-financed by the European Union Partnership Joint Technical Secretariat Lead Applicant Seminar for 1st application round Hamburg, April 2008.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
2 ESS ERIC High Level Advisory Meeting – 15 July 2014.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
Ministry of Education and Research Sweden Government Offices of Sweden Challenges – Neutron ESS ERIC Maud Bergkvist 1.
Patrick MALLEJACQ ERA-NET ROAD II proposal Status as of 23 September 2008 CEDR TGR meeting 24 September 2008, Paris.
Budget, Installation plan, Resource Organizational Structure & New Law for Research Centers Avni AKSOY 7th IMAC Meeting of TARLA, IAT, 7 September 2015.
Stakeholder Relations at Large-Scale Infrastructures The CERN Model Rolf Heuer 7 th Canadian Science Policy Conference, Ottawa, 26 November 2015.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
The European Spallation Source Status and Overview of the Project
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
1 An Overview of Process and Procedures for Health IT Collaboration GSA Office of Citizen Services and Communications Intergovernmental Solutions Division.
HLC Criterion Five Primer Thursday, Nov. 5, :40 – 11:40 a.m. Event Center.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
European Spallation Source Science Advisory Committee February 5-6, 2014 Jim Yeck CEO & Director General.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 2– Freedom Movement for Workers Bilateral.
ESS Update TAC Meeting October 2015 James Yeck Director General
RESOURCES AND CORPORATE DEVELOPMENT SCRUTINY COMMITTEE Tuesday 17 th June 2003 RESOURCES DIRECTORATE Julie Alderson Executive Director Resources.
IASC Mission IASC is a non-governmental organization whose aim is to encourage and facilitate cooperation in all aspects of Arctic research, in all countries.
Rob Connatser NSS Instrument Work Packages and XLPM.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
THE EUROPEAN UNION How does the structure of government within the EU compare with the structure of government in the United States?
Jean-Michel Favre (CERN Legal Service)
Ways to industry participation in CLIC 24th October, 2017
Regional and Bilateral cooperation instruments
Setting up an ERIC 11 May 2012 Richard Derksen
4th BrightnESS Best Practice Workshop VAT exposure related to ESS Installations in Sweden Carlo J. Bocchetta.
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Welcome & Charge for the Meeting
State of play of OP negotiations
ESS Project Status Roland Garoby – Technical Director August 2018.
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Preliminary Project Execution Plan
Charge and Agenda of the 18th TAC meeting
Presentation transcript:

ESS Update and Meeting Goals European Spallation Source (ESS) European Research Infrastructure Consortium (ERIC) High Level Advisory Group ESS Update and Meeting Goals CERN, July 15 James H. Yeck ESS CEO & Director General www.europeanspallationsource.se

Road to realizing the world’s leading facility for research using neutrons 2014 Construction work starts on the site 2009 Decision: ESS will be built in Lund 2025 ESS construction complete 2003 First European design effort of ESS completed 2012 ESS Design Update phase complete 2019 First neutrons on instruments 2023 ESS starts user program

ESS, Max IV and Science Village near Lund E22 Highway ESS Max IV Science Village

Funding is cash and in-kind deliverables Sweden and Denmark: 47,5% Construction 15-20% Operations Cash ~100% Partner Countries: 52,5% Construction 80-85% Operations IKC/Cash ~ 70% / 30%

ESS construction funding status Country Share (%) M Euro Sweden 35,0 645 Denmark 12,5 230 Germany 11,0 203 United Kingdom 10,0 184 France 8,0 147 Italy 6,0 111 Spain 5,0 92 Switzerland 3,5 65 Norway 2,5 46 Poland 2,0 37 Hungary 1,5 28 Czech Republic 0,3 5,5 Estonia 0,25 4,6 Netherlands, Lithuania, Latvia (to be confirmed @ ~3%) Total 97,55 1,798

ESS In-kind Goals Construction cost: € 1,84 Billion In-kind: € 750 Million € 509 M € 350 M 75% 65% € 155 M € 71 M 65% 59% ICS Target NSS Accelerator

Preparing the ESS project Deliver on the Technical Design Report performance and Steering Committee commitments 5 MW accelerator capability Construction cost of 1,843 B€ Operations cost target of 140 M€ 22 “public” instruments Start w/ unconstrained resources (technically limited schedule) and develop credible project execution plans Comprehensive review of project baseline and execution plans Secure funding and resources and align schedules with the available resources

Swedish Environmental Court Verdict on June 12 Top-Level ESS Project Schedule 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Start Of Construction End Of Construction ESS Program Construction Swedish Environmental Court Verdict on June 12 Permission to Start Construction! Design Ground Break Building First installations (of Machine Systems) Installing First Neutrons 1st Call for User Proposals Commissioning Machine 2.0 GeV Concluding Initial Operation Conventional Facilities Design Licensing Preliminary Design Acccelerator Bldngs Detailed Design Accelerator Bldngs Construction Earth Works Accelerator, Target, Aux, Office, Lab & Instr Bldngs* G01 Linac Tunnel G02 Klystron Bldng Cryo Kompressor Bldng Commissioning Design & Prototyping Accelerator Procurement Medium Beta Fabrication Spoke Series Procurement High Beta Fabrication Installation 570 MeV Installed for 2.0 GeV Installation Phase 1 Commissioning Installation Phase 2 Target Design Procurement Installation Commissioning Concept Devlopment Neutron Scattering Systems Instrument Selection - Decision Design Construction 3 Instruments ready for Comm. 16 Instr Innstr 16 – Constr & Inst. Innstr 16 – Cold Comm. Commissioning Integrated Control Systems Design Development Commissioning CS Network Operational

Commitment to 22 instruments 1st Call for User Proposals Regular Call for User Proposals Start of Instrument Construction 1st Neutrons ….. Construction Budget 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 3 6 5 4 2 1 9 11 15 17 19 22 Initial Operations Budget Steady-Sate Budget Plans for Instruments (1-22) # 1-16 Engineering Design Construction of Instruments # 17-22 Engineering Design Construction of Instruments Expected Instruments in hot commissioning Expected Instruments in Initial Science Programme Expected Instruments in Science Programme Scheduled Neutron Production On Off

Initial Operations planning & budget Status of activity and resource planning for transition to operations

Site preparations and earth moving underway

ESS organization

ESS transition from ESS AB to an ERIC European Spallation Source Council ESS member countries will submit application this summer to establish a European Research Infrastructure Consortium (ERIC) for ESS. ERIC will be in place in early 2015.

Review Charge (1st Annual Review Nov 2013)  A Performance Measurement Baseline (PMB) is an integrated work plan made up of a sequence of activities which cover the complete scope, cost and schedule of a project.  Once the PMB established and approved, the PMB can be used to evaluate actual cost and schedule performance to determine whether the project is meeting its planned scope, cost and schedule objectives.

Review Charge 1 2 3 4 5 6 7 7. Are the plans for host laboratory support functions (HR, IT, Legal, Finance, etc.) adequate to support the construction project? No, the new ERIC framework might solve some of the problems. HR contracts for visitors and in-kind personnel need particular attention. Procurement office and procurement procedures might require more attention. Already in 2014 ~160M will be going to procurement. An internal audit organization is necessary 1 slide of ~60 from November 2013 Annual Project Review Closeout

1 slide of ~60 from May 2014 Progress Assessment subcommitte 7 Evaluate the ESS response to the recommendations from the 1st Annual Project Review held in November 2013 Purchasing rules & transition to ERIC The ERIC will have new purchasing rules, and the StC has set up a committee to address this Very good progress However, a committee from the StC needs to inform itself to build an understanding of what is needed to maximally facilitate procurement through ESS for laboratories providing deliverables The ERIC may be an opportunity wrt labour law issues, by establishing staff regulations. This may be easier to negotiate with unions for an ERIC than as exceptions for an AB In general for the ERIC transition ESS may need an elaborate process for the transition including an advisory body as a sounding board for the management in this process

Experience from other projects: A few ingredients to success Facility must be a priority of the science community! Funding agency commitments and strong host role Collaboration leadership enables success of others Establish realistic goals – “Experience over hope” Credibility through openness with transparency Collective ownership of problems & solutions Populate the organization with experience NSLS II

Meeting goals Support ESS objectives to pursue the highest quality research at the lowest possible cost, providing maximum benefits to ESS member states: Engage the best people through direct hires, segundments to Lund, or engagement on member in-kind contributions Realize low cost for FTE’s, hardware, services, and energy Enable free flow of ideas and intellectual property Ensure that the ERIC formed for the European Spallation Source meets the objectives of the organization Evaluate the legal framework and the organization’s implementation plans and provide advice and recommendations

General organizational goals Organization is open to all ESS members including non-EU members, e.g., possibility to easily employ staff from all countries in the world Equal conditions (pension, tax, social security, etc.) for staff employed in Lund (SE) and data and software center in Copenhagen (DK), including flexibility to work in both places Staff and procurement rules benefit all member countries ERIC legal framework provides long-term stability and achieves many benefits of an international treaty organization VAT exoneration, exempt from duties, excise taxes, income tax for foreign employees, energy taxes (Swedish bid offer)

High level advisory group deliverables Openly share experience and advice Provide specific recommendations Short report summarizing meeting results