Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.

Slides:



Advertisements
Similar presentations
Using High Speed Rail to Achieve Connectivity and Integration Prof Andrew McNaughton.
Advertisements

Getting the North Up to Speed: On Liverpool, High Speed 2… and High Speed 1.5 Professor Ian Wray University of Liverpool 18 June 2013.
High Speed Two: Engine for Growth Peter Fry Public Affairs Manager – HS2 Ltd.
RTS Re-fresh North East Transport Consultative Forum Tuesday 30th October 2012.
HS2 – Ecclesfield Parish Council – 19 November 2013 Rachael Blake and David Orr-Ewing HS2 Ltd.
Base Birmingham Connected Transport Tom Magrath Director of Strategy and Policy Centro.
Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011.
Embracing Change Public Sector Land Embracing Change Public Sector Land Peter Schofield Director General, Neighbourhoods, DCLG.
The independent campaign for a better bigger railway.
HS2 and Airports Peter Fry, Public Affairs Manager HS2 Ltd CIC Economic & Policy Forum 17 Feb
Priorities for Rail Investment in the East Midlands Andrew Pritchard Director of Policy & Infrastructure February 2012.
Main ISSUES of reFINE’s R&I Roadmap
Mainstreaming Cycling for All Nick Vaughan Transport for Greater Manchester Eleanor Roaf Sustrans Local Sustainable Transport Fund National Conference.
MTF Rail Development Forum
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Recent Developments in UK Travel and Tourism BTEC National Travel and Tourism.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
High Speed 2 The decision and next steps Jonathan Mitchell.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
The Clapham Omnibus is Full………….. Challenges to our Transport System Neil Ridley Chief Business Development Officer.
25th November 2014 PTRC London 1 Jim Steer Director Greengauge 21 Director HSR Industry Leaders HS2 – more than a railway HS2: Building in the benefits.
 A high speed rail link from London to Yorkshire  Phase 1 is from London to Birmingham  Phase 2 is to Manchester and Leeds  The Institute of Economic.
EU Structural and Investment Funds Climate Change and Environmental Protection SWOT Workshop Martin Budd, Hull City Council Nadine Senior, Hull.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Ultra at Heathrow & beyond BASE April 2013 Presentation by Adam Ruddle, Key Account Manager, Ultra Global PRT.
HS2 Steve Rodrick Chief Officer. Preferred Route The Misbourne Valley.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
1 Delivering a 21 st century railway Anna Walker, Chair, ORR National Rail Conference: Cracking the Capacity Problem, 5 July 2012.
What Transport for Cambridge? The Sub-Region Development Strategy and Transport Policies.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
1. Hybrid Planning Application Detailed Application = Stadium and related infrastructure Outline Application = Enabling development sites 2.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
High Speed 2 – Rapid Collaborative Project Planning 11 th October 2012.
Transport Update Chris Carter Transport Strategy Manager.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
UK Working Group: Territorial Cohesion. Territorial Description: London.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
BIM on a new railway HS2 Jon Kerbey Director, BIM HS2 Ltd.
Manchester Airport and the Northern Powerhouse April
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
November 30 th London/Spain Webminar: Railway Infrastructure in the UK Spanish construction and railway industry 1 Jim Steer Director & Founder, Steer.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
High Speed Two Ltd responsible for developing and promoting the UK’s new high speed rail network
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When to invest in High Speed Rail Chris Nash
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
HS2 in the East Midlands Stephen McFarlane HS2 Ltd Greater Nottingham Transport Partnership Forum 24th February 2016.
PowerPoint Title Sub heading if required Northern Powerhouse Rail Freight meeting 17 th May 2016.
Invest in Renfrewshire Partnership Conference on Employment & Economic Development 16 June 2016 City Deal and our Role in the Regional Economy Mary Crearie.
Maria Machancoses Programme Director
High Speed Rail Some Development Principles
West of England Joint Transport Study
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
Sir Terry Morgan CBE Chairman, Crossrail
Midlands Connect: A Pan Midlands Strategic Transport Partnership
Regeneration - Enquiry Question 3
Fishermans Bend Draft Framework Transport Recommendations
Delivering East West Rail
KEYNOTE STAGE SPONSOR.
Western Rail Link to Heathrow
Life Cycle Costing.
Presentation transcript:

Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

2 The story so far Jan HS2 Ltd established Mar 2010 – Command paper + HS2 report May 2010 – General Election Dec 2010 – Consultation to commence Feb 2011 to Jul 2011 – Consultation on HSR and LWM route Jan 2012 – Decision to proceed…

3 We have upgraded classic rail Dominant mode for travel to Central London Growing fast Market share between other cities very low At maximum capacity by 2025 Further upgrading extremely disruptive

4 Benefits- Capacity and connectivity Total cost for Y network (inc Phase 1) is £32.7bn* Compared to building a traditional line, HS2 will deliver £4 in benefits for every additional £1 spent Wider benefits for jobs and regeneration Moving intercity services onto HS2 means more space for commuter, regional and freight services on existing lines  Y network will see up to 4.5 million air trips and 9 million road trips move to rail  Additional railfreight capacity could take 200 trucks per hour off roads, saving 500,000 tonnes of CO2 pa Transforms journey time between principal cities * 2011 prices

5 Government gives go ahead 10 Jan Secretary of State green light:  Y network: London to West Midlands with extensions to Manchester and Leeds and spur to Heathrow  London to West Midlands Alignment  Changes to consultation route including changes following 2011 consultation

6 HS2 Ltd mobilises Move from advisory role to developing phase 1 and promoting HS2 Grow and strengthen organisation with new expertise  CH2M Hill as development project management partner  Framework of professional services consultants

7 Hybrid bill The act will give powers to:  Build and operate HS2  Acquire and lease land  Alter roads  Modify statutory undertaker’s equipment Deposit hybrid bill by end of 2013 Royal assent 2015

8 Working towards hybrid bill for phase 1 Design of line and stations  Detailed measures e.g. earth building, landscaping  Construction methods and sites  Outline design of stations, viaducts and bridges etc Land referencing Managing petitioners

9 Working towards hybrid bill for phase 1 Environmental impact assessment and preparation of environmental statement, for example:  Ecological, geological and archaeological surveys  Noise assessment  Impact on water courses, flood risk etc Scale of work  17 work packages covering design, environment and land  At times up to 1000 people working on programme

10 Mitigating effects on people and nature

11 “A thing of beauty”

12 Noise mitigation: Landscape and barriers Images: Arup (HS1)

13 Tunnel noise and vibration control Resilient Material

14 Consultations Scoping of the environmental impact assessment spring 2012 Blight consultation 2012 Safeguarding consultation 2012 Environmental statement consultation spring 2013

15 Leeds Manchester and Heathrow Options report went to Secretary of State March 2012 Informal consultation 2012 Government decision on proposed route and station options autumn 2012 Formal consultation 2013?

16 Initial network London to  West Midlands1-24 to 0-49  Manchester2-08 to 1-13  Leeds2-15 to 1-20  Scotland4-20 to 3-30 Birmingham to  Manchester1-34 to 0-40  Leeds2-05 to 1-00 Heathrow to  Manchester1-10  Paris2-40 London Manchester Birmingham Scotland Leeds Heathrow Newcastle

17 1 st Stage London to  West Midlands1-24 to 0-49  Manchester2-08 to 1-40  Glasgow4-20 to 4-00 Birmingham to  Paris4-30 to 3-00 London Manchester Birmingham Glasgow

18 Through running – “Eurostar Mark 2”

19 High speed specification No premium on fares Journey times based on 360kph (225mph) trains Up to 18 trains per hour Fully EU TSI Compliant Up to 1100 seats per train

20 London - 2 central stations Euston Old Oak Common

21 HS stations are large! 1070m

22 London Euston

23 Old Oak Common Interchange

24 Old Oak Common

25 New Central Birmingham Station

26 West Midlands Interchange Links to National Exhibition Centre and the Airport ‘Parkway’ feeder for the metropolitan area People mover connection to be provided Road connections to trunk network

27 HS2 timescales 2011Public Consultation 2012Decision to Develop 2013Start Act of Parliament 2017Start Physical Work 2026Open to Birmingham 2033The “Y” Complete